An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

Improvement of Public Construction Delivery System & Award Method in Korea;Comparison with Cases of U.S., U.K., Japan (국내 공공공사 발주 및 낙찰제도 개선방안;미국, 영국, 일본 사례와의 비교를 중심으로)

  • Ji, Sae-Hyun;Lee, Hyun-Soo;Park, Moon-Seo;Song, Sang-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.367-372
    • /
    • 2006
  • Government is not only the biggest owner in public sector, but also the leader responsible for improving and fostering construction industry. Delivery systems and award methods are enacted as laws via government's strong will for construction innovation. In addition to establishing relationships between government and contractor, delivery systems and award methods affect every aspect of industry. Therefore, the government should keep trying to remove inefficiency and achieve Best Value. This paper analyzes the delivery systems and award methods of advanced countries to extract lessons for Korean industry focusing on leading parties, direction, and change in owner's awareness of their respective innovative movements for construction. The prerequisites for improvement in delivery systems and award methods are suggested as partnership between public and private sectors, consistent innovation, enhancement in efficiency, and reinforcement of owner's capability.

  • PDF

Innovation and Achievements in Public Construction Clients - Lessons Learned from GSA Construction Excellence Program - (공공 발주자 혁신프로그램 전략 및 성과 분석 - 미국 GSA Construction Excellence 프로그램을 중심으로 -)

  • Kim Han-Soo;Jung Hui-Ok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.394-397
    • /
    • 2003
  • The Korea construction industry is now in a state where radical innovation is seriously considered. Among a variety of innovation topics, this paper focuses on innovation in public construction clients. The objective of this paper is to analyze GSA's Construction Excellence Program as a case study and to present key characteristics of the program from the perspectives of implications and lessons learned.

  • PDF

A Comparative Study on Korean Compulsory Multiple Prime Contract System (건설산업 제도개선을 위한 분할·분리 발주 제도의 선진화 방안 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.184-193
    • /
    • 2013
  • Procurement System for Korean construction industry has mainly been controlled by the complicated regulatory system which has been recognized as unflexible and remotely separated from the global standard. This has been identified by many Korean construction experts as one of the main reasons that hamper the Korean construction industry becoming the global leader. One commonly discussed regulatory system is the compulsory multiple contracting system that has been enforced for a long time. According to the Korean governmental contracting law 68-3, all construction projects cannot be divided into separate contracting packages with a few exceptions. Exceptions stated in the law include construction activities related electrical, Information communication, fire-fighting, and cultural assets which all are governed by the separate laws/acts controlled by the different governmental bodies. This research is to closely investigate multiple prime contracting system that has been compulsory in Korean construction industry and to provide policy recommendations to these restrictions. Although, there has been a long history of this compulsory contracting system, this study attempted to provide objective analysis on current status of the system as well as global standard on the issue. This study suggests main considerations when considering different contracting system such as rights of owners, flexibilities of regulatory systems, and efficiencies of conducting a construction project. It is envisioned that recommendations from this study, if accepted by the regulatory bodies, would improve the Korean construction contraction system by making it more compatible with global standard. Moreover, these would help making the Korean industry more effective in terms of regulatory restrictions.

A Study on the Reinforcement of Disaster Prevention for Construction Stakeholders in Korea (국내 건설공사 이해관계자에 관한 재해예방 강화 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.192-198
    • /
    • 2024
  • Purpose: In order to establish a safety management system led by an orderer in the construction industry, the orderer should be positioned at the peak of the construction industry safety management system and a system that can effectively support safety supervisors who can assist the orderer's role should be reflected. Method: This study collected and analyzed data on the status of safety management of construction business owners through prior research on safety management of construction business owners and a survey on the actual condition of those involved in the construction business. Results: The top priority is to improve the safety awareness and safety management capabilities of the orderer, and through these efforts, the orderer-led safety management system will be established when a national consensus on the responsibility of the orderer, such as the Serious Accident Punishment Act and the Occupational Safety and Health Act, is formed in the event of an accident such as a serious accident. Conclusion: In order to establish a safety management system led by an orderer in the construction industry, it contributes to disaster prevention by positioning the orderer at the peak of the construction safety management system and reflecting a system that can effectively support safety supervisors who can assist the orderer's role.

A Model for Predicting Management Costs of the Multiple Prime Contract (분리발주 방식의 관리비용 예측 모델)

  • Kim, Kihyun;Kim, Kyungrai;Park, Wansoo;Lee, Eunjae;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.44-52
    • /
    • 2014
  • On March, 2013, the Government announced the Multiple Prime Contract method will be expanded in public building construction projects. The applying multiple prime contract method has been immersing issue among all stakeholders of construction project. The owner conducts the role of a general contactor as well as owner's original responsibility while construction works being executed by specialty contractors. If the owner has not experience of project management, it should be bring about increasing management cost due to the interface problems among prime contractors. With this reason, it is difficult to administrate the multiple prime contract. So far there has been no methodology of predicting management cost in the multiple prime contract. Therefore, this study aims to enable the operation of efficient multiple prime contracts by developing a model to predict their management costs.

Identification of Core Competencies of Construction Managers (CM단장 핵심역량 발굴에 관한 연구)

  • Kim, Dong-Hee;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.93-100
    • /
    • 2011
  • As the construction management(CM) market has grown, so has the CM competition in the market place. Consequently, competent construction managers become a core part of CM firms' competitiveness. The objective of the study is to identify and discuss core competencies of construction mangers based on literature survey, Delphi Method and AHP. Among various competencies required for construction managers, skills for problem solving, trust and negotiation skills were identified as the crux of construction managers' competencies. A better understanding of construction managers' core competencies is very critical in terms of CM firms' training of construction managers and continuos self-improvement for construction managers.

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.

Owner-driven Lean Construction based on Participants' Needs Analysis (건설주체간의 니즈분석을 통한 발주자 참여형 린 건설 연구)

  • Lee, Kang-Woo;Ryu, Chung-Gyu;Park, Hee-Dae;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.222-226
    • /
    • 2008
  • The construction industry has remained stagnant for a long time. So many researchers have wanted to solve this problem not only focusing on enhancement of construction process, but also introducing the culture of cooperation. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research propose a framework for implementation of LPS conducted by owner focused on construction stage and introduce optimal owner participation model in plant construction, based on needs analysis for construction participants. Furthermore, this research introduce a modified needs analysis, so called IPBA(Importance-Performance-Betterment Analysis), and an advanced LPS procedure which add the needs analysis during pre-LPS and(or) main LPS stages.

  • PDF

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.