• Title/Summary/Keyword: 발주

Search Result 1,353, Processing Time 0.021 seconds

Evaluation Method of Green Construction Technologies Using Integrated LCC and LCA Analysis (LCC-LCA 통합 분석에 의한 친환경 건설기술 평가방법)

  • Kim, Yoon-Duk;Cha, Hee-Sung;Kim, Kyung-Ra;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.91-100
    • /
    • 2011
  • Green technologies of buildings are spreading for saving resource and energy consumption during life cycle of buildings. However, selection of optimized the technologies for applying projects is needed a lot of time and costs. Therefore prioritization is necessary to apply the technologies for buildings. An evaluation of economic value for the technologies is significant for prioritization of the technologies, however, the current evaluation system of economic value for technologies is not reflected the accurate features of the technologies. Green technologies have the objectives for reducing the emission of CO2 and saving the cost during the whole lifecycle of buildings. Thus the evaluation of economic feasibility for green technologies is needed to include the economic value from improving the environment. This paper developed the economic evaluation method integrated with LCC and LCA to accurately analyze the economic value for green technologies. Moreover, this paper drew the priority of the technologies by conducting case studies with the integrated method and analyzing the results with AHP. The conclusion of case studies, Green technologies is worth more if to include the economic value from improving the environment. Then in analysis of priority, Green intelligent component technologies were rated the highest. The conclusion of the study is able to utilize the supporting tool for making decision to select the optimized technologies for the projects and precedence study for developing future research of prioritization for green technologies. The future study for improving the developed method will supplement the various evaluation factors and apply the detailed weight to analyze the priority of green technologies.

A Study for Enhancing the Criterion of the Software Cost Estimation (소프트웨어 개발비 대가기준 개선에 관한 연구)

  • Kwon, Ki-Tae;Byun, Boon-Hee
    • The KIPS Transactions:PartD
    • /
    • v.13D no.6 s.109
    • /
    • pp.815-822
    • /
    • 2006
  • It is very important that they accurately predict the software development cost in the early stage of a software development. Because cost estimations are required when bidding for a contract or determining whether a project is feasible in terms of a cost-benefit analysis. The criterions of the software cost estimation was set up to calculate software development cost more exactly, which is applied to made up a budget of the software business or to calculate a suitable cost to start the business in our country. However, as the software technology and environment are changing very rapidly, it need to enhance the criterion of the cost estimation continuously. Therefore, we tried to apply technology of software and a variety of factors of environment changes in present. Most of all, we proposed an introduction and readjustment of the adjustment factor applying 14 general system characteristics to improve the accuracy of the cost estimation and the schedule adjustment factor that is required by practicians. For evaluating the accuracy in terms of the real data, we have used MMRE & PRED. In result, we proved that the accuracy was clearly improved by applying the scale factor and readjusted VAF with 14 general system characteristics. Moreover, we evaluated the accuracy of the schedule adjustment factor.

Positive Discrimination Policy in U.S. Construction Industry and Its Implications (미국 건설산업의 상대적 약자 배려 정책 고찰 및 시사점)

  • Chang, Chul-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.285-292
    • /
    • 2020
  • Despite the government's constant exertions on making a win-win environment through positive discrimination for small and medium-sized companies and local companies, they are suffering from order polarization, weak competitiveness to win a project, and low profitability in highly competitive market situations resulting from the contraction of the construction market. This study examined the U.S. policy and regulations on protecting the relatively weak entities in the construction industry, focused on a goaling program, setting aside the bid preference for small and middle-sized companies and local companies. From benchmarking, some implications were drawn to reconsider the goal of policy and regulations for small and medium-sized companies and local companies. In conclusion, unlike domestic positive discrimination regulations, which are based on the concept of market sharing that can allow a paper company to survive, those of the U.S. are based on the principle of fair competitiveness, and also provide a certain degree of advantage for small and medium-sized companies and local companies. Therefore, the domestic positive discrimination policy and regulations for small and medium-sized companies and local companies need to be reconsidered toward the direction of not only protecting them but also to strengthen their competitiveness in the market.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

The Selection of Optimal Interchange Types by Quantifying the User Costs and Construction Costs of Ramps (연결로의 사용자 비용과 공사비 계량화를 통한 입체교차로 최적형식 선정 기법)

  • Kim, Sang-Youp;Choi, Jai-Sung;Min, Kyung-Chan;Choi, Hyun-Ho
    • International Journal of Highway Engineering
    • /
    • v.12 no.2
    • /
    • pp.33-41
    • /
    • 2010
  • It is stated in the highway geometric design guide that expressway interchange types should be selected considering a set of input variables including travel demand, topography, construction cost and interchange spacing. However, this selection method has a problem of providing different interchange types even for the same input variables depending upon different applications of engineers discretion. A procedure that produces consistent results is necessary and this paper presents the development of an efficient and reliable procedure based on the quantification of road user costs and construction costs on interchanges. To develop this procedure, a survey of existing expressway interchange types in South Korea was made and 10 basic interchange types and 52 supplementary interchange types were identified. To relate road user costs and construction costs to these interchange types, this research uses two method. First, interchange types were expressed by a set of ramp configurations. Second, road user benefits and construction costs associated with these different interchange types were formulated based on the current national guide of the expressway economical analysis. As a result, it was proved that an interchange type to provide minimum costs could be selected consistently and this research result should be useful for future expressway geometric designs.

Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers (저층·고층 아파트가 혼합배치된 단지에서 공기단축이 건설사업비에 미치는 영향 분석)

  • Bang, Jong-Dae;Chun, Young-Soo;Jun, Myoung-Hoon;Kim, Sa-Rang;Lee, Do-Heun
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.415-421
    • /
    • 2012
  • In case of Korean housing complex, there became more mixed arrangement of buildings with different number of layers for a variety of urban skyline, recently. For example, around 33% of the construction sites of 'A' public corporation have gaps of more than 4 layers between high-rise buildings and low-rise ones in the same site, according to the survey. Generally, construction duration of the housing complex is estimated based on the layers of the highest building. Due to this baseline, whole construction duration could be extended so that the project cost could be increased. Therefore, framework duration of higher-rise buildings should be reduced to secure the feasibility of the project. On the other hands, these shortenings could adversely harm the feasibility in some cases because there are a wide range of combinations of the buildings with different number of layers in designing housing complex. Therefore, this study shows the results of analysis on effects of framework time shortening on the cost in housing complex project. Moreover, this could set the baseline of checking possibilities in condensing the construction duration of projects with buildings of different layers by supplying comprehensive database.

Evaluation for Applying Low-Cost Mobile Laser System to Earth Volume Calculation at Construction Site (건설현장에서의 토공량산출을 위한 저가형 모바일 레이저시스템의 적용성 평가)

  • Kim, In Seop
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.6_1
    • /
    • pp.539-547
    • /
    • 2012
  • Volume survey for earthwork is conducted periodically at every month at large scaled construction sites for request payment for the construction. Currently, the earthwork volume is calculated on the overlapped drawing for two cross sections which were created by new and previous surveying data observed by GPS and TS. However the survey is required lots of time and expenses as it is a pin-point surveying method thus surveyors intend to get data only for the heavy undulated topographic features chosen by himself to save time and expenses. Consequently, it causes poor results due to low dense measurement as well as it's not matched with the results by another surveyors. As a result, the conflicts related in earthwork volume calculation often arises among the owner, contractors and sub contractors. In this study, we developed a method to get surveying data for fast and accurate volume calculation using 3D Mobile Laser System and conducted an application test. Also we carried out experiments for topographic survey using MLS to judge for the application additionally. The results showed that we could reduce a time for cross section survey from 48 hours to 2 hours and collected high dense data which have 0.2m interval instead of 3m interval compare with existing method. Also we could make a map which has high accuracy within 10cm in horizontal through topographic survey using MLS.

The Application Plan for Value Engineering Redesign by Using The Simulation for The Port Facilities Construction Project (항만시설 프로젝트의 시뮬레이션을 활용한 재설계 VE 적용방안)

  • Yoon, Moo-Hee;Ahn, Kyung-Soo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.19 no.6
    • /
    • pp.533-546
    • /
    • 2007
  • This paper studied the design VE (Value Engineering) process among the various methods to satisfy the requirement of user and cost saving in the overall redesign process for the Turn-key base construction project. This study has been estabilished the rational and practical analysis process with the stepwise by using the design VE process. The efficiency and safety were verified with the adoptian of computer simulation to cope with the problem of initial analysis and verification for design VE process in the large construction project. In the previous design VE process, there is a limitation for the analysis of design VE in the planing stage and the execution time period of the large construction project. The previous application of VE technique was only for the construction of harbor facilities, so there was no contribution of cost saving in the function and construction. However, this paper proposed the selection methodology of VE items and hence the redesign VE process can be efficiently improved. It can be also improved the process of functional analysis rationally and practically. About 4.6 billion won has been saved with applying to the harbor construction project with using the VE method proposed in this paper. The study gives the direction of VE to be accomplished efficiently in the similar project.

A Research on Development Measures of Information Services for Construction Technology (건설기술 정보서비스 구축 방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.8
    • /
    • pp.5707-5715
    • /
    • 2015
  • Recently, construction industry has won an increasing number of orders for overseas construction projects, thereby achieving an external growth, but its competiveness is concentrated on the construction execution field. In particular, the plant field occupies most of the entire orders, which are concentrated regionally in the Middle East and Asia. In addition, low-cost orders are frequently caused by excessive competition. But its high value-added construction engineering(Below, CE) field's overseas market share and technological capacity are very low. Also, technological competiveness, in terms of order amount and other factors, is deepening in polarization between large CE companies and small and medium-sized CE firms. It is noted that the existing CE information systems mostly simply accumulate data such as design and specification standards and provide the information thereon to users, and thus have yet to provide the information essential for the CE and support such efforts. This study sought to prepare a system designed for sharing outstanding design documents information necessary for the CE industry, by category of construction so as to support the technological enhancement of the CE field. Toward that end, this study presented measures for constructing the system and services designed to exchange and share the outstanding design documents information and know-how by construction category necessary between ordering agencies and CE companies.

A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage (친환경 리모델링 철거공사 수행을 위한 사전검토 모델 개발)

  • Chae, Seong-Hyun;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.14-23
    • /
    • 2012
  • Due to the increase of aged housing demolition in preparation for the rapid growth of the market, Eco-friendly remodeling demolition work which can minimize environmental destruction have been studied. However, the owner or contractor to apply for eco-friendly remodeling demolition work does not reflect the characteristics of the site can not have a potential for many variables. In addition, There is no standard which can find effective part and catch a problem by performing eco-friendly remodeling demolition. Therefore, the project owner and construction company executives in the Pre-construction stage to the implementation of eco-friendly remodeling demolition construction by providing a model for the pre-evaluating the project. In this paper, the performance of eco-friendly remodeling of demolitions is proposed for the pre-evaluating model. After the eight items were drawn affecting the performances which are influence to accomplishment of the eco-friendly remodeling demolition, evaluation criteria was suggested for each item. Also By classifying and assessing the evaluation items, It will be able to identify the problems and supplements for eco-friendly remodeling demolition. Through the final evaluation sheet, The works of the appropriacy and supplement will be checked for the eco-friendly remodeling demolition. Finally The preinvestigation model is helpful for making the plan of systematic demolition, futhermore It is contribute to the expansion of the eco-friendly remodeling demolition.