• 제목/요약/키워드: 발주체계

검색결과 252건 처리시간 0.029초

A Study on Evaluation of Construction Project Owner's Organizational Competency (건설사업 발주자 조직 역량 평가에 관한 연구)

  • Lee, Si-Wook;Woo, Sung-Kwon;Kim, Ok-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • 제10권1호
    • /
    • pp.146-155
    • /
    • 2009
  • In the construction industry, success or failure depends on the capability and role of the project owner's organization, which has an effect on the peoples' lives and national finance because of a lot of involvement from the project owner. Therefore, it is required that the project owner has the sufficient capability for the success of relevant industry and the further development of whole industry. Therefore, at the viewpoint of successful accomplishment of the construction industry, systematic and in-depth research that defines and evaluates the capability of the project owner's organization is necessary. As-Is and To-Be competency can be measured by the individual areas and elements through the survey. By evaluating these capabilities simultaneously, it is possible to assume not only the project owner's organizational competency but also constant other capabilities. It is become to make plans for strengthening the capabilities and to establish the strategy, by catching which capabilities are really necessary. It will result in positive effects on improving the capabilities of the project owner's organizational competency.

The Legal Proposal of Improvement for S/W Acquisition & Management System (S/W 발주 ${\cdot}$ 관리 감독의 개선을 위한 입법적 과제)

  • Kim, Byung-Il
    • 한국IT서비스학회:학술대회논문집
    • /
    • 한국IT서비스학회 2005년도 춘계학술대회
    • /
    • pp.451-457
    • /
    • 2005
  • 공공부문의 정보화 사업의 중요성에도 불구하고, 공공기관의 정보시스템을 효율적으로 발주 ${\cdot}$ 관리할 수 있는 체계가 정립되어 있지 못할 뿐만 아니라, 정보화사업은 계획 ${\cdot}$ 심의 ${\cdot}$ 사업기획 ${\cdot}$ 사업발주 ${\cdot}$ 사업관리 ${\cdot}$ 성과평가 동의 일련의 발주체계의 전문성 미흡으로 발주자의 사업수행상의 어려움뿐만 아니라 이를 실질적으로 수행하는 수주업체에도 커다란 영향을 미치고 있어 발주기관과 수주업체간의 절차상의 문제발생 사업결과에 대한 책임 한계 불분명 둥으로 법적인 문제가 발생되고 있다. 또한, 국가, 공공기관 등은 모든 사업의 절차가 법과 제도에 근거하여 수행되고 있는데 소프트웨어 등 지식기반사업의 경우에는 법과 제도가 사업의 특성을 반영하지 않아 S/W사업 수행에 어려움이 상존하고 있어, 기술적인 발주 ${\cdot}$ 체계 개선과 더불어 법 ${\cdot}$ 제도의 개선이 요청되고 있다.

  • PDF

Improvement of SW Acquisition${\cdot}$Management Processes in public sectors (공공부문 SW사업 발주${\cdot}$관리 프로세스 개선방안;'공공부문 SW사업 발주${\cdot}$관리 표준프로세스 지침' 시범적용 및 개선을 중심으로)

  • Huh, Jeong;Song, Ki-Ho;Ko, Byung-Sun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 한국IT서비스학회 2006년도 춘계학술대회
    • /
    • pp.62-70
    • /
    • 2006
  • 공공부문의 SW에 대한 사용자의 기대 및 정보화 요구에 부응하기 위하여 그동안 국내에서는 수많은 SW 시스템들이 개발되어 왔으나, 개발 과정에 대한 체계적인 관리 방법이 미흡하여 발주자가 복잡한 SW 발주과정을 추진하기 어려우며 SW 개발자에 대한 관리 통제수단이 미흡한 실정이다. 또한 발주자의 전문성 결여로 수주자인 개발업체에 과도하게 의존하는 업무 추진과 수발주자 간의 불명확한 업무 인식으로 상호 불신이 팽배한 가운데 공공부문 SW사업의 완성도 및 성공률이 저조하여 낮은 품질의 정보시스템 인수 등 사업 실패율이 높아지고 있다. 본 논문에서는 이러한 문제점을 해결하고 개선하기 위해 발주${\cdot}$관리 프로세스 확립과 이에 대한 적용을 중심으로 체계적인 SW사업 발주${\cdot}$관리 프로세스 확립과 이에 대한 적용을 중심으로 체계적인 SW사업 발주${\cdot}$관리 프로세스 개선방안을 제안한다.

  • PDF

The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - (공공발주자 의사결정에 미치는 가치공학(VE)의 영향력 분석 - 프로젝트 생애주기를 중심으로 -)

  • Park, Jongsoon;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • 제16권2호
    • /
    • pp.12-20
    • /
    • 2015
  • The public employers are faced the mounting importance of decision process to settle the optimum VE delivery system of such public facilities buildings and etc. The elements of decision process of the public employer are formed in the various relationships of the concerned and when the projects are coming into effect, the decision process in the VE delivery method and the selection of contractor will be the name of the game. The decision process in the VE delivery method and the selection of contractor are created a case to be one and the same as well as initiates a consistency for the performance. However, the function and role of the public employer are projective accordingly to the organization of employer and the employer especially no system is equal to the capability of perfect evaluation and verification of the ability of the employer. Especially the lowest bidder policy that started with justification to increase the competitiveness and technical capability of the contractors through the completion in between contractors has been providing the hotbed for insolvency, irregularity and irrationality as a result. From this point of view it is declared that the buildup the edifice of supporting system in the process of decision to recover the mutual trust and respect of the concerned in the VE delivery system with the technostress and the systematization based on drawing the elements which affect the decision process of public employer.

A Study on the Reinforcement of Disaster Prevention for Construction Stakeholders in Korea (국내 건설공사 이해관계자에 관한 재해예방 강화 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • 제20권1호
    • /
    • pp.192-198
    • /
    • 2024
  • Purpose: In order to establish a safety management system led by an orderer in the construction industry, the orderer should be positioned at the peak of the construction industry safety management system and a system that can effectively support safety supervisors who can assist the orderer's role should be reflected. Method: This study collected and analyzed data on the status of safety management of construction business owners through prior research on safety management of construction business owners and a survey on the actual condition of those involved in the construction business. Results: The top priority is to improve the safety awareness and safety management capabilities of the orderer, and through these efforts, the orderer-led safety management system will be established when a national consensus on the responsibility of the orderer, such as the Serious Accident Punishment Act and the Occupational Safety and Health Act, is formed in the event of an accident such as a serious accident. Conclusion: In order to establish a safety management system led by an orderer in the construction industry, it contributes to disaster prevention by positioning the orderer at the peak of the construction safety management system and reflecting a system that can effectively support safety supervisors who can assist the orderer's role.

Supplier Management Research for Disaster Mitigation Activities and Prevention of Major Disasters (재해경감활동과 중대재해예방을 위한 공급자 관리 연구)

  • Kim, Sang-Duk
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 한국재난정보학회 2022년 정기학술대회 논문집
    • /
    • pp.71-72
    • /
    • 2022
  • 본 연구는 발주기관과 사내 공급자의 재해경감활동관리체계 연계성 강화에 대하여 연구하고자 한다. 기업재난관리표준에 정하고 있는 공급자 전략에 대한 요구사항을 파악하고, 발주기관과 공급자의 적용사례를 검토 분석하여 재해경감활동관리체계의 연계성 강화를 위한 절차를 도출한다. 기업재난관리표준의 요구사항인 공급자 전략에 대하여 명확히 정의하고, 연계성 강화를 위해서 발주기관과 공급자가 적용하는 절차와 그 절차에 의하여 산출된 결과물을 공유하는 표준화된 절차가 필요하다는 시사점에 대한 해결방안을 연구하였다. 공급자의 재해경감활동관리체계 수립 절차중 중요한 절차의 연계성 강화를 위한 개선안을 제안하였으며, 제안된 내용과 절차를 기업재난관리표준과 관련 규범에 반영할 것을 제시한다

  • PDF

A Study on Developing Systems for Managing Information on Owner's Requirements in the Design Phase (설계단계에서의 발주자 요구사항 관리를 위한 정보관리 시스템 개발에 관한 연구)

  • Yoo, Seung-Yeun;Lee, June-Seong;Park, Jung-Dae;Jun, Joon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • 제9권3호
    • /
    • pp.126-135
    • /
    • 2008
  • The purpose of this study is to develop the efficient information system for managing owner's requirement(O/R) throughout the design phases. In order to derive an improvement, current status of O/R management both in domestic and foreign design company has been analyzed. Through the literature reviews and interviews with experts, the Information on design process and detailed activities were investigated. Based on the basic research, inputs, outputs and participants were defined and information flow diagram was drawn. O/R's were categorized according to comprehensive interviews with specialists, and a prototype system was suggested. Conducting systematized O/R management will improve the confidence of owners' role on design, reduce re-work in design tasks, and finally elevate design quality.

A Study on Improvement of Report System between Government Agency and construction site (발주청과 건설현장간 보고체계 개선에 관한 연구)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Annual Conference of KIPS
    • /
    • 한국정보처리학회 2011년도 춘계학술발표대회
    • /
    • pp.1383-1384
    • /
    • 2011
  • 본 연구는 건설현장에서 발주청으로 보고하는 주기적인 업무보고자료를 대상으로 오프라인이 아닌 온라인 보고방식으로 업무처리절차를 개선하고자 한다. 또한, 온라인 보고시에도 단순 보고형식에서 승인 반려체계를 도입하여 시공사는 감리단에게, 감리단은 발주청에게 승인요청절차를 거쳐 승인 또는 반려처리함으로서 온라인으로 업무처리가 가능하도록 발주청과 건설현장간에 보고체계를 개선하고자 한다.

A Conceptual Design of Information Management Model of Ordering Service Results including Management Item by Construction Fields (건설분야별 관리항목을 포함하는 용역실적정보 관리모델의 개념적 설계)

  • Kim, seong-jin;Kim, nam-gon;Na, hei-suk
    • Proceedings of the Korea Contents Association Conference
    • /
    • 한국콘텐츠학회 2013년도 춘계 종합학술대회 논문집
    • /
    • pp.447-448
    • /
    • 2013
  • 본 연구는 발주청에서 발주 관리되는 설계, 감리, 건설사업관리 용역실적정보를 건설분야별 사업단계별로 관리체계를 마련하고 용역사와 발주청에서 용역실적정보를 체계적으로 등록 관리할 수 있도록 업무처리 프로세스를 개선하고자 한다.

  • PDF

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project (공공토목사업 CM 발주를 위한 단계별 업무지원 시스템 구축)

  • Chae, Yeong-Seok;Park, Seo-Young;Moon, Hyoun-Seok;Kim, Seon-Yeong;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • 제12권5호
    • /
    • pp.81-92
    • /
    • 2011
  • Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.