Strategy Improvement of Construction Management in the Owner's View Point (발주처의 관점에서 바라본 토목사업 CM 제도 활성화 방안)

  • Lee, Sang-Ok;Park, Jin-Hong;Jang, Won-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.463-472
    • /
    • 2012
  • Exemplary contracts of construction management (CM) including highway projects have been carried out in the civil engineering area over the past ten years. However, practical and administrative challenges as transitional circumstances have been revealed in the different participants of supervision, inspection and construction management. Thus, it is important to internally overcome problems and negative perception encountered in civil engineering, and to promote the efficiencies in construction cost and quality. In addition, external efforts should be put to market opening, globalization, and technology development for competitiveness and high value industry. While it is critical to establish the concrete CM system by collaborating with various participants, proven architecture and system have not been provided because of incorrect measurement of CM accomplishment, overlap of responsibility between CM and supervision, and slow deployment in construction field. This paper analyzed the current CM practices and business environments, and presented the possible solutions for strategy improvement of CM in the owner's view point.

Web-based drone image data mangement system (웹 기반 드론 이미지 데이터 관리 시스템)

  • Sung-Jun Kim;Joon Woo;Tae-Young Hong
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2024.01a
    • /
    • pp.349-350
    • /
    • 2024
  • 최근 몇 년간 드론 시장 규모 및 산업적 중요성이 증가하고 있으며, 농업, 산림, 건설, 환경 등 다양한 분야에서 활용되고 있다. 이러한 배경에서 다양한 발주처에서 여러 가지 목적으로 드론 서비스 기업과 협력하여 드론 이미지 데이터를 획득하는 사업을 진행하고 있다. 이 과정에서 발주처와 기업 간에 촬영 계획 협의 및 촬영 데이터 검수 등과 같은 상호 교류가 필요하며 원활한 정보 공유를 위한 시스템이 필요하다. 본 고에서는 드론을 활용한 데이터 획득 과정에 필요한 촬영 계획 수립 및 검토, 촬영 데이터의 검수 등을 위한 웹 기반 드론 이미지 관리 시스템을 개발하고 이에 대하여 설명한다. 본 고에서 개발된 시스템을 활용하면 드론 서비스 기업은 다양한 발주처와 협업시에 효과적인 정보 공유를 할 수 있을 것이다.

  • PDF

이슈&이슈-2008년 상반기 분리발주 수주 현황 분석

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.219
    • /
    • pp.42-45
    • /
    • 2008
  • 분리발주는 설비건설업계의 오랜 숙원사업 중 하나이다. 지난 1989년 협회가 창립된 이후 설비건설업계의 업역확대를 위해 그동안 정부 및 관계기관에 끊임없는 건의를 통해 노력을 기울여 왔다. 대한설비건설협회의 이러한 노력에 힘입어 대한주택공사를 비롯한 정보통신부, 교육인적자원부 등 주요 발주처 및 발주기관에서 분리발주를 시행하고 있다. 본지는 2008년 상반기 동안 회원사의 분리발주 수주 현황을 분석하고, 분석 결과를 통해 하반기 분리발주 수주 전략 다각화를 모색코자 한다.

  • PDF

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

공공건설사업 CALS 구현 계획

  • 김승균;권오룡;김규수;유인채;신용재
    • Proceedings of the CALSEC Conference
    • /
    • 1997.11a
    • /
    • pp.207-235
    • /
    • 1997
  • $\bigcirc$ 국가적 정보화 추진정책으로, - 정보선진국 진입을 선언하고, 전자정부 선언에 따라 전자상거래법 제정을 준비중이며, - 정보화 10대 과제를 선정하여 추진중임. $\bigcirc$ 국내건설환경의 경쟁력 제고가 필요 - 성수대교, 삼풍사고 등으로 건설산업의 신뢰도가 저하되어, 기술경쟁력과 자본력에서 국제 경쟁력의 제고가 필요함. $\bigcirc$ 건설시장의 국제화 대비가 필요 - 국제 건설시장의 개방에 따른 경쟁력 강화가 시급하고, - 미국, 일본 등의 CALS체계 구축으로 건설사업의 정보화와, - 품질향상, 안정성 확보 및 비용절감을 통한 국내외 신뢰회복으로 건설수주의 확대가 절실함. $\bigcirc$ 21세기 고도 정보화 시대에 맞는 건설산업의 정보화 필요 - 건설산업의 선진화와 국제 경쟁력 강화를 위한 환경 조성 - 건설사업의 기획에서 유지보수 까지 전 과정 정보화 추진 - 발주처, 건설업체, 유관기관 등이 공유하는 건설정보지원 - 건설사업의 정보화와 건설업체, 발주처 등이 정보를 공유하는 건설CALS 체계 구축을 통한, - 건설산업 선진화와 국제경쟁력 강화 환경조성이 필요함.(중략)

  • PDF

장기방치공사 재개시 공사계획 및 관리

  • Cho, Sang-Young;Jung, Yong-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.8-15
    • /
    • 2004
  • 1997년 11월 IMF 영향에 따른 ○○건설사의 부도로 인해 1년동안 ('97. 11∼'98. 11) 공사가 중단된 채 방치되어 많은 문제점을 안고 공사를 재개하지 못하고 있는 현장이 전국에는 아직도 100여개 정도 산재해 있는 것으로 알고 있다. 이와 같은 현장의 공사재개를 위해서는 다음과 같은 문제점을 검토해야 한다. 첫째 기술적 문제점으로는 기초와 지하주차장 골조공사가 일부 시공중 중단되어 철근이 1년 동안 방치된 채 부식되어 있어 구조물 안전진단은 물론 부도에 따른 기 시공 협력업체들의 채무정리(22개사)에 대한 문제가 해결되지 많아 공사의 재개에 많은 어려움이 있으므로 충분한 사전검토가 필요하다. 둘째 외부적 문제점으로는 그동안 공사중단으로 인한 입주자들에 대한 신뢰확보 즉 조합 및 분양자들이 건설사의 부도로 인한 중도금 납입 거부상태는 물론 선납금, 연체이자 등의 경제적 피해 손실로 발주처에 대한 집단소송 진행 등에 따른 건설사 및 발주처에 대한 불신 해소를 어떻게 하느냐가 공사재개의 중요한 관건이었다.(중략)