A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project (도로공사 대표공종의 생산성 정보 개발에 대한 연구)

  • Seo, Ji-Hyeong;Park, Hyung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.42-53
    • /
    • 2011
  • This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.

건설소식

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.6 s.191
    • /
    • pp.78-81
    • /
    • 2006
  • 300억 이상 공사 최저가 낙찰/ 국민임대주택 11만가구 건설/ 중대재해 발생 즉시 보고해야/ 하도급법 위반 제재 강화/ 아파트 건설공사 쏟아진다/ 표준품셈 상시관레체계 구축/ 미국 플랜트 자격증 국내서 딴다/

  • PDF

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.

Estimation of Construction Equipment Expenses - Bulldozer and Loader - (표준품셈의 기계경비 산정 현실화를 위한 자료 조사.분석 -불도우저와 로우더를 중심으로-)

  • Huh, Young-Ki;Kim, Kyung-A;Ahn, Bang-Ryul;Tae, Yong-Ho;Park, Hee-Sung;Kim, Chang-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.155-166
    • /
    • 2008
  • The Equipment Expenses section of the Poom-Saem that is used for Construction Cost Estimation of public sectors in Korea has been rarely revised, and so does not reflect changes of Construction Equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of equipment expenses for a bulldozer and a loader, the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

Analysis and Realistic Estimation of Maintenance Cost of Construction Equipment Expenses (건설기계 경비의 관리비 구성 분석 및 현실화)

  • Kim, Kyung-A;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.503-508
    • /
    • 2007
  • The Equipment Expenses section of the Poom-Saem, that is used for Construction Cost Estimation on public sectors in Korea, has been rarely revised, and so does not reflect changes of construction equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of maintenance costs(Interest, Storage, Insurance, Tax), the equipment expenses section of the Poom-Saem and the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. Based on results from analysing figures related with the estimation of maintenance costs, the maintenance cost is redefined. Then, construction equipment was classified into 6 exclusive construction equipment and general one, and realistic figures of the maintenance cost, which consists of interest, storage, insurance, tax, are suggested respectively. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation that helps to estimate appropriate construction costs and the ground work of related studies.

  • PDF