A Comparative Analysis of Risk Impacts on Cost Overrun between Actual Cases and Managers' Perception on Overseas Construction Projects (해외 프로젝트 시공단계 리스크 요인의 실제 비용 초과 영향과 현장관리자 인식 차이 분석)

  • Lee, Kyung-Tae;Ann, Hannah;Kim, Jae-Won;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.52-60
    • /
    • 2021
  • Due to the significant size of overseas construction projects, the cost overrun has enormous impacts on the financial status of construction companies. The managers' appropriate perception and identification of key risk factors in the construction phase notably affect the performance of projects. However, the actual impacts of risk factors and local manager' s perception of them could be deviated. For this reason, we aim to compare the performance of actual cases and general opinions of responsible practitioners in terms of risk factors relevant to cost overruns in order to present a practical strategy for risk management. Firstly, factors classified from literature review were used to simulate 290 cost overruns data sets from 20 cases by introducing Monte-Carlo Simulation and were ranked by standardized coefficients through multiple regression analysis. Secondly, a survey was conducted against 42 local managers to rank their perception of impact on cost overrun with identical factors by using Stepwise Weight Assessment Ratio Analysis (SWARA). Comparison results show that conflicts such as 'conflict with subcontractors' and 'conflict with the local community' have caused excessive cost overrun. However, managers' perception of these as less significant than the actual influences and consider other risks such as 'material price fluctuation' and 'construction quality errors', as relatively serious. Therefore, education for local managers on conflict risks needs to be presented.

System Engineering Database for Korea High Speed Rail System Development (한국형 고속전철 시스템엔지니어링 데이터베이스 구축)

  • Hwang, H.S.;Lee, T.H.;Hyun, S.H.;Jeong, H.C.;Kim, D.W.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1359-1361
    • /
    • 2000
  • 고속철도는 상당히 복잡한 시스템이기 때문에 적절한 시스템엔지니어링 도구의 사용 없이는 추적관리에 드는 인적비용 및 시간이 만만치 않으며 오류가 생기기 쉽고 매우 비효율적이다. 따라서, 시스템 요건에 정의된 목표 성능을 달성하고 시스템간의 불일치를 최소로 하기 위해 체계적인 시스템 통합 절차를 제공할 수 있는 시스템 엔지니어링 데이터베이스 구축이 필요하다. 이 데이터베이스는 시스템 요건부터 시스템 기능, 컴포넌트, 평가 요건, 평가 결과까지 추적성을 갖도록 구축되어서 연계 관리를 가능하게 한다.

  • PDF

The Methodology of Design to LCC (수명주기비용을 고려한 설계 및 관리 방안)

  • Na, In-Sung;Lee, Jae-Won;Park, Myeong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.131-137
    • /
    • 2006
  • The Cost has been much emphasized in inside of an army because of the promotion of reconciliation atmosphere between South and North Korea and the reduction of defense budget since 1990. So we are now faced with the problem that we should consider a cost above all besides the performance and arrangement for such a restriction of budget in time of developing new generation weapon systems. In this research we are suggested following two methodologies. One is the develop a weapon system with optimum cost considering a Life Cycle Cost from the first stage of design and the other is the cost control and management with the establishment of Target cost.

Trends and Current Issues in Health Services Quality Improvement: Case of the United States (의료서비스의 질향상 진화와 현안: 미국의 동향)

  • Han, Whiejong M.
    • Quality Improvement in Health Care
    • /
    • v.14 no.2
    • /
    • pp.101-114
    • /
    • 2008
  • 흔히 관리의료 (Managed Care)라 불려지는 미국의 의료체계는 과거 약 30여년간 미국내 의료비용증가의 억제, 의료서비스 접근성 개선, 의료의 질향상이라는 세가지 목표를 이루기위해 시행되어 왔다. 이 관리의료체계는 지속적으로 증가하는 의료비용을 어느정도 억제하는데는 성공하였으나, 몇년전부터 의료정책전문가들은 관리의료체계의 의료비용증가 억제 역할은 이미 한계에 다다렀다고 판단하고 있으며, 의료서비스 접근성 개선이나 의료의 질향상에는 큰 성과를 이루지 못했다고 평가하고 있다. 그럼에도 불구하고 미국의 의료서비스 질향상을 위한 노력은 지속적이면서도 체계적으로 진행되어왔다고 자부하고 있다. 최근 미국내 의료서비스 질향상을 위한 형태를 살펴보면 자주 거론되는 것이 Prevention activity, Physician Profiling, Pay-for-Performance (P4P), Clinical Practice Guideline, Health Information Technology (Health IT)등임을 알 수 있다. 미국의 이러한 노력들이 최근 1-2년사이 한국내에도 널리 알려지고 이미 일부는 시범사업형태로 실시되고 있는 점을 감안하면 별반 다를 것이 없다고 여겨질 수 있으나, 여기서 주목할 것은 이러한 노력들이 미국내에서 시도되게된 계기와 목적, 그리고 그 과정들을 눈여겨 볼 필요가 있다는 점이다. 하지만 민간보험 주도 형태의 미국 의료시장에서 탄생한 이런 일련의 노력들이 정부주도하의 전국민건강보험체계로 운영되는 국내 의료시장에 도입되어 실효를 거두기 위해서는 모방형 도입이 아닌 국내 의료체계와 실정에 적합하도록 수정 혹은 개선된 형태로 선별, 도입되어야 함을 암시하고 있음도 주지해야 한다.

  • PDF

개방경제하(開放經濟下)의 "거시적 증권정책(巨視的 證券政策)"

  • Kim, Yu-Man;Lee, Il-Gyun
    • The Korean Journal of Financial Management
    • /
    • v.10 no.2
    • /
    • pp.1-51
    • /
    • 1993
  • 본 논문의 목적은 첫째, 자본자유화로 인해 통화공급 구조가 이미 균형에서 이탈하여 심각한 수준의 불균형 상해에 있다는 점을 실증적으로 입증하고자 한다. 둘째, 자본유입에 따른 정책조정 비용을 감안한 통화정책 모형을 통해 주장에 대한 이론적 근거를 제시하고, 정책 조절에 수반되는 손실비용(損失費用)과 Mundell의 $\ulcorner$할당 문제(割當 問題)$\lrcorner$를 다시 조명해 보고자 한다. 세째, 자본유입에 따르는 문제점들을 해결할 수 있는 정책방안들을 Modigliani ar Miller의 명제(命題)에 입각한 새로운 각도에서 합리적 인 증시정책을 모색해 보고자 한다. 분석의 이론적 틀로서는 자본유입에 따라 수반되는 불확실성하의 정책조절 비용을 감안한 손실비용 최소화(loss cost minimization)를 통해, 통화 당국자는 총통화량을 정책적으로 내정된 목표값에 수렴시킨다고 가정하였다. 다른 한편, 자본유입에 따르는 문제점들을 통화시장에만 제한시키는 부분적(部分的) 균형분석(均衡分析) 대신, 이를 증권시장으로 직접 연계시켜 두 시장으로 확장된 틀을 활용하였다. 본 논문의 연구방법은 다음 두가지 측면의 접근식을 따랐다. 첫째, 자본자유화정책의 특성을 살펴보기 위해, 자본자유화 시점을 기준으로 삼아 과거 자본통제 시대의 $\ulcorner$사후적(事後的)인 중화정책(中和政策)$\lrcorner$에 의존하는 $\ulcorner$소극적(消極的)인 증권정책(證券政策)$\lrcorner$과 자본자유화시대의 $\ulcorner$사전적(事前的)인 상살정책(相殺政策)$\lrcorner$에 의한 $\ulcorner$거시적(巨視的)인 증권정책(證券政策)$\lrcorner$을 통해 고찰하는 비교분석론에 입각한 접근식을 택했다. 둘째, 외국자본의 유입동기(流入動機)를 문제해결의 시발점으로 삼아 이를 새로운 개방정책과 직결시켜 문제해결의 실마리를 풀어 보려는 선험적(先驗的) 접근식(接近式)을 택했다.

  • PDF

Improvement Scheme on Green Construction Cost & Benefit through Analyzing Trends and Case Studies (해외사례조사를 통한 녹색건설 비용 및 편익 정보 체계의 개선 방향)

  • Kim, Won-Tae;Choi, Seok-In;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.44-54
    • /
    • 2013
  • As a green construction is a world-wide hot issue, Korean government is also putting forth a multilateral effort into reducing energy usage with setting aggressive goal under green growth policy. It is essential to analyse cost raised from designing and building green construction and benefit derived from the built facility for the sustainable green construction. However, compared to advanced countries in terms of green construction, there is lack of data and a systematic way for data collection and analysis in Korea. Without analyzing the cost-benefit of green construction, investors will hesitate to put his/her money into green construction and we can not expect its growth in construction industry. In this paper, cost of green construction was defined and categorized. Through case studies and various reports on cost-benefit analysis in advanced green construction countries, problems in terms of data collection and analysis in domestic green construction sector and improvement ways were suggested. The results of this study will contribute in classification of cost and benefit of green construction, data collection in systematic way, and increasing the feasibility of green construction via appropriate analysis on cost-benefit of green construction.

Coordinated Operation of Weirs and Reservoirs of Nakdong River Basin considering River Water Quality (수량과 수질을 고려한 낙동강 수계 댐-보 연계운영)

  • Kim, Sheung-Kown
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.206-212
    • /
    • 2012
  • 2012년 상반기를 기점으로 '4대강 살리기 사업' 1 단계가 완료 되었다. 추후 안동댐과 임하댐의 연결 사업과 낙동강 상류 내성천의 영주 댐과 금호강 상류에 보현 댐 건설이 예정 되어 있지만, 낙동강 수계에는 8개 보 건설이 완료되어 하천의 물리적 환경이 바뀌었다. 따라서 앞으로는 보의 유지 및 운영 관리(주로 수질관리, 어도관리, 토사퇴적 및 세굴관리)가 중요하게 될 것이므로 기존의 상류 댐 운영 목표와 방식도 변해야 한다. 낙동강 수계는 11월부터 다음해 6월 까지가 갈수기에 해당한다. 따라서 갈수기에 수질을 담보할 유량이 실제로 흐를 수 있는지를 낙동강 유역 총체적인 관점에서 분석을 하고, 방류계획을 세울 필요가 있다. 수량이 수질을 항상 보장해 주지는 못하지만, 용수공급 목표를 저해할 환경과 생태계를 위한 무리한 초과 방류를 해야만 할 경우가 발생한다면, 그로 인한 기존의 농업, 공업 및 생활용수 공급에 미칠 영향을 가늠해서 대책을 세워야 한다. 본 연구에서는 좀 더 정교한 수질사고 시뮬레이션 모형, Water Pollution Accident Response Management System (WARMS)과, 하천수질예측시스템(Water Quality Forecasting System)모형 등, 수질을 고려한 3차원 모형과의 연동 및 연계를 염두에 두고, 시스템적 측면에서 수질과 수량을 한꺼번에 고려함으로써 궁극적으로 시간과 비용을 절약한다는 점에서 효율이 높을 것으로 생각되는 댐-보 연계운영을 위한 분석 방법을 제안한다.

  • PDF

An Empirical study on Effect of Service Level Management as Enterprise Quality Management Tool for IT Service Provider (IT서비스 제공자의 전사적 품질 관리 도구로써 서비스수준 관리의 효과에 대한 실증적 연구)

  • Kim, Soo-Jung
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.85-90
    • /
    • 2005
  • IT서비스 관리에 대한 국내 시장은 전문 SI기업들의 IT아웃소싱 사업 모델을 대상으로 한다. 국내 SI기업들은 전격적으로 IT아웃소싱을 선택하고 SLA를 체결한 그룹 관계사들을 대상으로 IT서비스를 제공해왔기에, 상대적으로 해외 open market에 비해 SLA 적용 효과에 대한 해석과 설명의 노력을 간과했다. 본 연구에서는 12개 고객 기업 사례를 바탕으로, S기업의 4개년간 서비스수준 관리 이력을 분석함으로써 IT서비스 제공자의 서비스 품질 제고에 기여한 서비스수준 관리의 효과를 규명하였다. 첫째로 서비스수준 관리 항목별 목표수준 설정의 효과, 둘째, 서비스 유형별 Target-time 설정의 효과, 셋째, 고객 기업의 사업 영향도에 따른 중요도 구분의 효과, 넷째, 제재와 보상의 적용을 통한 서비스수준 관리의 효과를 분석하였다. 본 연구는 고객 기업과 SLA 체결을 통한 IT서비스 제공자의 서비스수준 관리 효과를 수치적 결과로 입증했다는 데 의의가 있으며, 본 연구를 기반으로 한 후속 연구과제는 IT서비스 제공자의 서비스수준 관리를 통한 서비스 품질 제고 효과가 IT아웃소싱의 비용 절감 효과에 미치는 영향 분석이 되어야 할 것으로 기대한다.

  • PDF

Probabilistic Analysis of Repairing Cost Considering Random Variables of Durability Design Parameters for Chloride Attack (염해-내구성 설계 변수에 변동성에 따른 확률론적 보수비용 산정 분석)

  • Lee, Han-Seung;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.32-39
    • /
    • 2018
  • Repairing timing and the extended service life with repairing are very important for cost estimation during operation. Conventionally used model for repair cost shows a step-shaped cost elevation without consideration of variability of extended service life due to repairing. In the work, RC(Reinforced Concrete) Column is considered for probabilistic evaluation of repairing number and cost. Two mix proportions are prepared and chloride behavior is evaluated with quantitative exterior conditions. The repairing frequency and cost are investigated with varying service life and the extended service life with repairing which were derived from the chloride behavior analysis. The effect of COV(Coefficient of Variation) on repairing frequency is small but the 1st repairing timing is shown to be major parameter. The probabilistic model for repairing cost is capable of reducing the number of repairing with changing the intended service life unlike deterministic model of repairing cost since it can provide continuous repair cost with time.

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.