Design Planning and Evaluation using Mock-up for the Short-term Temporary Housing (단기 임시주거를 위한 설계계획 및 목업을 통한 성능평가)

  • Lee, Won-Hak;Lee, Byung-Yun;Cho, Young-Jun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.609-616
    • /
    • 2019
  • This paper proposes a design plan of short-term temporary housing for the victims by disaster. Also construction workability and residential environment evaluated by mock-up. In particular, in the event of a disaster, victims have lived the auditorium or gymnasium of the nearby school which is an emergency shelter. However, there was a problem of livability. Therefore, it is the purpose of study to provide temporary housing that resides within 30 days. For this purpose, a composite panel with light weight and insulation select to produce mock-up. The mock-up complete in about an hour. This is because it is made only of the composite panels. The composite panels confirm to be easy to load and construct. And mock-up evaluates insulation and waterproofing performance in the laboratory. As a result, Mock-up has insulation and waterproofing performance. This suggests an alternative to short -term temporary housing.

Evaluation on In-Site Compressive Strength of High-Strength Concrete Mass Elements under Cold Weather (혹한기 고강도 콘크리트 매스부재의 현장 압축강도 평가)

  • Mun, Jae-Sung;Yang, Keun-Hyeok;Kim, Do-Gyeu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.589-595
    • /
    • 2015
  • This study evaluated the in-site compressive strength development of high-strength concrete developed for the mass structures under cold weather condition. Two mock-up wall specimens with $2.0{\times}1.2{\times}1.0m$ in dimension were cured under an average temperature of $5^{\circ}C$. Core strengths measured at different locations of the mock-up walls were compared with the companion standard cylinder strengths. Test results revealed that the core strength of mock-up walls at an age of 3 days is higher by approximately 30% than the companion cylinder strength because of the high curing temperature effect generated from the heat of hydration of cementitious materials. Furthermore, comparisons with the prediction models based on maturity function confirmed that the effect of hydration heat on the curing temperature increase needs to be reflected to reasonably evaluate the on-site compressive strength development of concrete for mass elements.

The Loading Mock-up test for Construction Management of Cable net Facade (케이블넷 파사드의 시공관리를 위한 하중재하 Mock-up실험)

  • Moon, Sang-Deok;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.28-29
    • /
    • 2014
  • Cable net system openness and flexibility is good high and the large deflection caused no damage to the structure itself. However, cable installation, install complex systems and technologies are needed. In this study, for the basic materials of cable net construction management, cable net expert's advice and mock-up test results are summarized.

  • PDF

Title of the Paper in English (UHPC패널 현장 적용성 연구)

  • Yoon, Ju-Yong;Park, Yong-Kyu;Choi, Byung-Keol;Lee, Dae-Seek;Choi, Sang-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.219-220
    • /
    • 2023
  • We attempted to examine field applicability by manufacturing panels using UHPC and conducting mock-up tests. Mock-up testing was conducted at the Busan location. To observe field applicability over a long period of time, it was produced and installed identically to actual panels.

  • PDF

Evaluation of Vibration and Structural Performance of an Innovative Sliding Step Steel Stair Using Full-Scale Mock-up Test (실물대 목업실험에 의한 슬라이딩스텝 철골계단의 진동 및 구조성능 평가)

  • Kim, Sung Yong;Lee, Cheol Ho;Kim, Na Eun;Cho, Sung Sang;Chung, Woon Ok
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.6
    • /
    • pp.511-522
    • /
    • 2014
  • In this study, an innovative steel stair system is presented which enables rapid erection and high quality control in both residential and office building construction. This system features two lightweight steel stringers of box shape, bolted connections easy to absorb construction tolerance, and stair steps movable transversely (or sliding steps) such that the work space needed for concrete stairway wall could be easily provided. In this type of stairway system, other than providing robust connecting details, ensuring vibration performance is especially important since this system may be vibration-sensitive due to lightweight nature and/or probable low damping. To tackle these issues, a series of full-scale mock-up tests were conducted by using box-shape stringer members with or without concrete-fill. The connection system was shown to be sufficiently stiff and strong, or it remained elastic even under the 160% of service load level. Among the seven stringer alternatives, five exhibited satisfactory vibration performance according to the related North American and European acceptance criteria.

Fabrication and Constructability of a General-Purpose Manufactured Precast Concrete Double Wall (범용 생산설비를 활용한 PC 더블월 제작 및 시공성에 관한 연구)

  • Park, Soon-Jeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.465-476
    • /
    • 2023
  • This study introduces the development of a precast concrete double-wall, applicable to basement construction in apartment buildings. Unlike traditional precast concrete double walls, the developed double-wall doesn't require specialized manufacturing equipment such as a lathe. The constructability of these advanced technologies was validated through a full-scale mock-up test using the precast concrete double wall. The test specimens were constructed to represent a structural wall with a thickness of 250mm. It was observed that the quality of the in-situ concrete, filled between two single panels of 110mm thickness each, was excellent. The construction efficiency of the developed double-wall system for basement construction in an apartment building was also examined. Expert interviews about installation times of precast concrete elements were conducted to evaluate the speed of the basement floor's installation. The results showed that installation of precast concrete elements, including the proposed double walls, could be completed within 20 to 29 days for a basement in an apartment building. This indicates a three-fold increase in construction efficiency compared to traditional methods relying on in-situ casting.

Study on Substitution Effect caused by Application of BIM Simulation System to Mock-up Site (시공단계 현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용에 의한 기대효과 분석 연구)

  • Jang, Se-Jun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.147-151
    • /
    • 2008
  • Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator's satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time. But our analysis show that each are conducted different part of function. So new Mock-up type is required. Hybrid Mock-up is combine real mock-up with BIM simulation and it can minimize risk of project.

  • PDF

Constructability Evaluation of Seismic Mechanical Splice for Slurry Wall Joint Consisting of Steel Tube and Headed Bars (슬러리월의 내진설계를 위한 강재각관과 확대머리 철근으로 구성된 기계적 이음의 시공성 평가)

  • Park, Soon-Jeon;Kim, Dae-Young;Lim, In-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.295-303
    • /
    • 2023
  • South Korea has recently witnessed an increasing number of seismic events, leading to a surge in studies focusing on seismic earth pressures, as well as the attributes of geological layers and ground where foundations are established. Consequently, earthquake-resistant design has become imperative to ensure the safety of subterranean structures. The slurry wall method, due to its superior wall rigidity, excellent water resistance, and minimal noise and vibration, is often employed in constructing high-rise buildings in urban areas. However, given the separation between panels that constitute the wall, slurry walls possess limited resistance to seismic loads in the longitudinal direction. As a solution, several studies have probed into the possibility of interconnecting slurry wall panels to augment their seismic performance. In this research, we developed and evaluated a method for linking slurry wall panels using mechanical joints, including concrete-confined steel pipes and headed bars, through mock-up tests. We also assessed the constructability of the suggested method and compared it with other analogous methods. Any challenges identified during the mock-up test were discussed to guide future research in resolving them. The results of this study aid in enhancing the seismic performance of slurry walls through the development of an interconnected panel method. Further research can build on these findings to address the identified issues and improve the efficacy and reliability of the proposed method.

Fundamental Research of Early Frozen Damage on Concrete Depending on Various Time Periods of -20℃ Temperature Condition (외기온 -20℃의 유지시간 변화에 따른 초기동해 피해의 기초적 연구)

  • Choi, Yoon-Ho;Han, Jun-Hui;Lee, Young-Jun;Hyun, Seung-Yong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.197-198
    • /
    • 2019
  • The aim of the research is evaluating the feasibility of inspection for early age frozen damage and for expansion of concrete under the various time periods of -20℃ temperature condition. When the concrete samples were exposed for 12 hours and 24 hours, the frozen depth of the concrete were 10 and 60 mm, respectively, under the wet conditions. From the experiment results of temperature and expansion, only surface area suffered frozen damage for 12 hours exposing conditions while entire area suffered frozen damage for 24 hours exposing conditions.

  • PDF

Experimental Study on Properties of High Strength Concrete with three-hours-fluidity-retention Performance in Extremely Hot Weather Conditions (극서환경에서 3시간 유지성능을 갖는 초유지 고강도 콘크리트의 특성에 관한 실험적 연구)

  • Cho, Hong-Bum;Ki, Jun-Do;Kim, Kwang-Ki;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.201-202
    • /
    • 2019
  • The high performace water reducing agent with three-hours-fluidity-retention performance is developed for the purpose of entering into the global market belonging to extreme environment such as Southeast Asia and the Middle East. In this study, the fresh and mechanical properties of the high strength concrete with three-hours-fluidity-retention performance are evaluated by making mock-up members in Vietnam.

  • PDF