• 제목/요약/키워드: 모듈러시공

검색결과 111건 처리시간 0.029초

유닛모듈러 조립공구 개선을 위한 기능분석 연구 (A Study on the Analysis of Function for the Enhancement of the Tool for Assemble of Unit Modular)

  • 박남천;김균태;박수열;정인수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.239-241
    • /
    • 2012
  • The major industrialized nations have continued to develop industrialized construction techniques based on automated production processes in factories, and are applying them to a wide range of building. However, the unit modular construction system has had a shorter history of development and application in Korea compared to advanced countries, and consequently, Korean modular builders have a relatively poor technical capacity. So this study is draw a conclusion on the target of priority improvement for idea creation. It study on the enhancement of the functionality of the tool for assemble of Unit Modular that choose the enhancement of the functionality through the analysis of function on the three-level of functional definition and classification, functional arrangement, functional appraisal.

  • PDF

인필식 유닛모듈러 공법을 활용한 학교시설의 리모델링 계획시 영향요인 (A Study on Effect Factors of Using Infill Unit-Modular Construction for Remodeling plan of School Facilities)

  • 전영훈;김균태;김석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.138-139
    • /
    • 2016
  • In this study, we propose a way of infill unit-modular construction for school facilities and identify the main effect factors when planning a remodeling of the school facilities by using infill unit-modular construction. This study is limited to have document for domestic infill modular construction such as technical data, knowhow due to fewer cases and research. we expect to study on an practical alternative for infill modular housing specifically.

  • PDF

3D Infill을 활용한 PC 모듈러공법과 기존공법과의 시공프로세스 비교 연구 (A Study on the Comparison of the Construction Process between the PC Modular Construction Method Using 3D Infill and the Existing Construction Method)

  • 정준수;임석호;양현정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2023
  • In accordance with changes in the domestic construction environment, interest in off-site construction methods (factory-manufactured construction methods) including modular construction methods is rapidly increasing. Among various off-site (OSC) construction methods, the front runner is the steel-based box-type modular construction method. Compared to the existing wet construction method, the steel modular construction method is increasing in terms of securing economic feasibility by shortening the construction period and increasing the prefabrication rate. However, due to the recent rise in raw materials and a sharp rise in the exchange rate, the economic feasibility of the wet method is deteriorating compared to the wet method. Therefore, a hybrid between 9-Matrix-based OSC construction methods is considered as a solution, away from the steel-box type combination, and a comparative study of the construction process between each construction method is being conducted. It was analyzed that the PC modular construction method shortened the construction period by 9% compared to the existing steel modular construction method. On the other hand, when comparing the construction period of the Gayang-dong demonstration complex calculated assuming that all modules are applied, it is estimated that there will be a 12% reduction in construction period compared to the steel modular method and a whopping 43% compared to the RC method.

  • PDF

인필 모듈러 건설시스템의 표준 시공프로세스 구축 (Establishment of Standard Construction Process of the Infill Modular Construction System)

  • 김창한;정찬우;김형수;황현준;한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.245-246
    • /
    • 2012
  • Lately the Infill Modular Construction System which meets the domestic standards about the structure and fireproof performance and which is applied to the remodeling techniques is being emphasized. In order to introduce the Infill Modular Construction System to domestic market successfully, the development of insufficient element technologies and systematic analysis of process should be preceded. This research aims to establish of Standard Construction Process, as advanced research for the settlement of the Infill Modular Construction System. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve work efficiency. In addition organizing optimized Standard Construction Process by steady work analysis and improvement is being planned.

  • PDF

한국형 모듈러 주택 시공의 시나리오 개발 (Development of a Korean Modular Housing Construction Scenario)

  • 김균태;김창한;이두헌;이영호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.81-83
    • /
    • 2011
  • A modular house is a house that is assembled on-site from modularized units. As such units are manufactured in a factory, the construction period is reduced, resources are recycled, and quality is improved. However, the construction technique applied to conventional modular houses has not overcome certain structural restrictions, as it is currently used to build houses less than 4 stories in height, which means that it lacks economic feasibility. For this reason, this research aims to develop a scenario of a construction method for Korean modular housing that can be applied to urban-type housing higher than 12 stories. This research is expected to provide fundamental data necessary for the future development of a construction method for Korean modular housing.

  • PDF

모듈러 교량 하부구조를 위한 3차원 변수모델의 개발 (Development of 3D Parametric Models for Modular Bridge Substructures)

  • 김동욱;정동기;심창수
    • 한국BIM학회 논문집
    • /
    • 제2권2호
    • /
    • pp.37-45
    • /
    • 2012
  • 부재를 표준화하여 설계 및 제작 생산성을 높이고 기계화 시공을 가능하게 하는 모듈러 교량이 건설 산업에서 중요하게 대두되고 있다. 반복성이 높고 설계, 제작 시공 과정에서의 정보의 원활한 전달이 필요하기 때문에 BIM(Building Information Modeling) 기술에 기반한 변수 모델링 정의를 제시하였다. 모듈러 교량이 갖는 변수 범위를 고려하여 고정변수, 변동변수, 연관변수로 구분하여 정의하고 이를 설계, 해석, 제작에 활용할 수 있도록 하였다. 구조시스템 개발과정의 지식을 정보화하여 3차원 모델의 정확성과 활용성을 높였다.

유닛모듈러 건축구조물의 수평 정밀도 확보를 위한 Pre-Fab 독립기초 높이조절 공법 개발 (Development of a Height Adjustment Method of Prefabricated Individual Footing for the Leveling of Unit Modular Structural System)

  • 전영훈;김균태;채명진
    • 한국건축시공학회지
    • /
    • 제15권6호
    • /
    • pp.631-639
    • /
    • 2015
  • 유닛모듈러 공법에서는 정밀 제작된 유닛모듈과 시공정밀도가 낮은 기초부의 접합부에서 수평 정밀도 차이가 발생한다. 이러한 정밀도 차이로 인하여 상부 유닛모듈이 뒤틀리거나, 간격이 벌어지는 등 다양한 문제가 야기될 수 있다. 이러한 배경에서 본 연구는 Pre-Fab 독립기초의 높이조절이 가능한 공법을 개발하는 것을 목적으로 하였다. 이를 위하여 본 연구에서는 볼트와 너트를 이용한 높이조절 공법을 제안하고 시공 상세도와 시공순서를 제시하였다. 그리고 구조 시뮬레이션을 수행하여 구조적 안정성을 확인하였다. 향후 개발된 높이조절 공법의 mock-up 시험, 경제성 분석 등을 실시하여 시공성과 유용성을 검토할 예정이다.

지속가능한 장수명 모듈러 도로를 위한 지지 모듈러 시스템 (Support Modular System for Sustainable-Perpetual-Modular Road)

  • 김동규
    • 한국지반환경공학회 논문집
    • /
    • 제24권1호
    • /
    • pp.37-44
    • /
    • 2023
  • 본 연구에서는 도로의 건설 시간 및 유지관리 비용을 단축하기 위하여 제안된 지속가능한 장수명 모듈러 도로시스템의 하부구조인 지지 모듈러의 성능을 평가하였다. 하부 곡선면을 가진 Cross-Beam 형태의 지지 모듈러 4개로 구성된 모듈러 도로시스템을 Test-bed에 시공하였다. 6개의 하중계와 8개의 변위계를 중앙부 2개 Cross-Beam 형태의 지지 모듈러에 설치하였다. 2개의 하중, 50kN, 100kN을 도로 포장슬래브 15개 지점에 재하하여 모듈러 도로시스템에서 발생하는 하중 및 변위를 측정하였다. 측정된 변위들은 1mm 미만으로 실제 도로의 안정성에 문제가 없을 것으로 판단된다. 현장실험에서 적용된 2개의 재하 하중들과 측정된 하중값들을 비교해 보았을 때 하부 지반에 전달되는 하중은 매우 작은 것으로 판단된다. 지지 모듈러를 가진 모듈러 도로 시스템을 실제 도로현장에 적용 가능한 것으로 판단된다.

사례분석을 통한 모듈러 건축의 현장 작업자 안전관리 체크리스트의 분류 체계 제안 (Proposal of a Classification System of Checklists for Safety Management of On-Site Workers in Modular Construction)

  • 전영훈;김균태;전은비
    • 한국건설관리학회논문집
    • /
    • 제22권6호
    • /
    • pp.120-130
    • /
    • 2021
  • 최근 정부는 건설재해 예방을 위하여 건설공사 안전관리를 강화하고 있으며, 예방적 차원의 작업자 안전관리 방안이 중요한 실정이다. 한편 모듈러 건축은 중고층 건축물 등으로 점차 확대 적용될 예정이나, 작업환경이 열악하고 안전관리가 미흡한 중소규모 건설현장이 많아 재해예방을 위한 안전관리가 미흡한 실정이다. 또한 국내 모듈러 건축의 안전관리 방안은 작업자의 안전사고에 영향을 미치나 시공오차, 하자 등 구조안전과 관련한 요소를 관리하는 품질관리에 집중되어 있어, 작업자의 안전보건을 관리하여 재해를 예방하는 작업자 안전관리는 부족한 실정이다. 따라서 본 논문에서는 국내 연구 개발된 사례들을 분석하고 전문가 자문을 통하여 도출된 모듈러 건축의 작업자 안전관리를 위한 체크리스트의 분류체계를 제안하였다. 분류체계는 공장제작, 운송, 현장시공을 대분류로 구성하였으며, 하위체계는 현장시공의 6가지의 중분류 중 모듈러 골조설치 공사의 세부작업인 양중작업과 조립작업을 중심으로, 12가지의 단위작업을 구분하였다. 그리고 안전관리를 위한 관리요소에 따른 단위작업별 작업내용을 정의하고 분류체계에 최종적으로 반영하였다. 본 연구의 결과가 모듈러 건축의 건설현장에서 효율적인 안전관리를 수행하는데 기여할 수 있기를 기대한다.