• Title/Summary/Keyword: 막장지질도

Search Result 48, Processing Time 0.018 seconds

Geotechnical Aspects of Tunnel Design in Karst Topology (카르스트 지형에서 수행한 지반조사와 터널 설계)

  • 김달선;주광수;이희철;서영호
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2003.03a
    • /
    • pp.1-12
    • /
    • 2003
  • 지반조사 결과에 의거하여 돌리네와 공동이 존재하는 지역을 구분하여 지역에 적합한 카르스트 형식을 적용, 예측하였다. 특히, 터널이 돌리네 발달 가능성이 적은 백운산 지역을 통과하는 경우에 소규모의 KT-1 ∼ KT-5가 존재하는 것으로 예측되었다. 그러나 설계시 지반조사의 한계성을 인식하고 시공 중에 필요하다고 판단되는 구간에는 막장 전방의 지질상태를 파악할 수 있는 조사를 선 시행하여, 그 결과를 토대로 최종 등급을 결정하여 안전한 시공에 대처할 수 있도록 해야 한다.

  • PDF

Analysis of Changes in Groundwater Level according to Tunnel Passage in Geological Vulnerable Zone (지질취약구간 터널통과에 따른 지하수위 변화량 분석)

  • Choi, Jung-Youl;Yang, Gyu-Nam;Kim, Tae-Jun;Chung, Jee Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.3
    • /
    • pp.369-375
    • /
    • 2020
  • The section of this study is the geological vulnerable zone where groundwater leakage occurred through the tunnel barrier during excavation of the shield tunnel boring machine(TBM) for the construction of the electric power unit. Therefore, a Three D imensions(3D) numerical analysis was performed to analyze the actual situation from before construction to the time when the change in groundwater level occurred, and to reflect the surrounding ground conditions based on the observed change in groundwater level during construction. As a result of the study, the correlation between groundwater level change and tunnel construction around the site was identified. Therefore, it was similar to the measurement result of groundwater level at the target ground. The amount of groundwater discharge to the entrance of the tunnel construction was also similar to the actual measured result, and the numerical analysis method and modeling in this study were analyzed to reflect the site conditions.

Prediction and Evaluation of Rock Mass Condition by Seismic Profiling Method in Tunnel (터널내 탄성파 탐사를 이용한 전방 지질 예측 및 평가)

  • Lee, Jong-Man;Kwak, Hyun-Joon;Kim, Young-Geun;Baek, Ki-Hyun;Cho, Chul-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.3
    • /
    • pp.45-56
    • /
    • 2001
  • It is very important to survey in construction for acquiring informations about geological structure which influence the tunnel construction. Usually, TSP(Tunnel Seismic Prediction) one of the seismic survey method in tunnels in Korea has been used for prediction of geological condition ahead of tunnel face, but in this study HSP(Horizontal Seismic Profiling) was used. As a result of field application, we predicted that there exist rock discontinuity such as fault, joints and bedding planes. In addition, RMR value from rock mass evaluation coincided with that from seismic survey for rock condition. We compared with rock classifications and evaluation results for proving.

  • PDF

Use of the Tunnel Seismic Prediction Method for Construction of Spillways at Juam Dam (터널 내 탄성파탐사(TSP)기법의 주암댐 보조여수로 적용 사례 연구)

  • Bae, Jongsoem;Chang, Chandong
    • The Journal of Engineering Geology
    • /
    • v.23 no.1
    • /
    • pp.67-77
    • /
    • 2013
  • We conducted a Tunnel Seismic Prediction (TSP) survey in a spillway tunnel at Juam Dam to predict the locations of major discontinuities ahead of the tunnel face. We compared the results of the TSP survey with those from pre-construction inspections (including a surface resistivity survey and borehole investigations) as well as with direct tunnel-face mapping during excavation. The TSP method predicted the locations of major fracture zones that were unnoticed in the pre-construction inspections. The reinforcement patterns planned on the basis of pre-construction inspections were changed on the basis of the TSP results. The results demonstrate that TSP surveys are a cost-effective and reliably accurate method of predicting the locations of fracture zones. Although the TSP method has some limitations, these results suggest that the method is generally useful for predicting geological conditions prior to tunnel face construction.

Assessment of Tunnel Displacement with Weak Zone Orientation using 3-D Numerical Analysis (3차원 수치해석을 이용한 연약대 방향에 따른 터널 거동 특성 평가)

  • Yim, Sung-Bin;Jeong, Hae-Geun;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.19 no.1
    • /
    • pp.43-50
    • /
    • 2009
  • A 3-D numerical analysis was carried out to observe potential effects of orientation of inherent weak zones to tunnel behaviors and stress distributions during tunnel excavation. Weak zones used for the analysis were placed at the upper 1D part from crown, on the crown and on the center of face, using orientations derived from the 6th RMR parameter for assessment of joint orientation effect on tunnel. Mechanical properties of rock mass were derived through a in-situ displacement measurement-based back analysis. Finally, a classification chart for crown settlement with five ranks based on orientation and location of weak zones is suggested.

A Study tor 2-Dimensional Analysis Technique for 3-Dimensional Ground Behaviour Due to Tunneling (터널 굴진시의 3차원 지반거동의 2차원적 해석법 고찰)

  • 김교원;이현범
    • The Journal of Engineering Geology
    • /
    • v.6 no.3
    • /
    • pp.111-118
    • /
    • 1996
  • In general, a three dimensional ground behaviour during tunneling is simulated by using two dimensional analysis programs in consideration of a certain ratio of stress or strain distribution to take into account the effect of construction stage by a tunnel face advance. A series of trree dimensional analyses was conducted to deduce a normalized displacement (surface or crown settlement) curve in longitudinal direction, of which curve is reflecting an effect of a tunnel advance under a various condition. And, by using try and error technique, two dimensional analyses were carried out to determine an optimum stress distribution ratio for a settiement curve coincided with the curve obtained by three dimensional analyses. Finally, monitored results from a subway tunnel were compared with two dimensional analysis results for varification of the deduced stress distribution ratio as well as the two dimensional analysis program employed in this study.

  • PDF

Source Mechanism Analysis and Simplified Modeling for Rockburst (록버스트 발생기구 분석과 단순화 모델링)

  • Choi, Byung-Hee;Oh, Se-Wook;Kim, Hyunwoo;Jung, Yong-Bok
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.1-14
    • /
    • 2021
  • Rockburst is a sudden and violent failure of rock. During the failure process, excess energy is liberated as seismic energy, which in turn causes the surrounding rock mass to vibrate. The level of the ground vibration can reach a magnitude of over 4.5 in the Richter local scale. Thus, a rockburst can cause not only injury to persons, but also damage to both underground workings and surface structures. In this paper the source mechanism of rockburst is analyzed based mainly on the two reports of the Canadian Rockburst Research Program (CRRP). A simplified LS-DYNA modeling is also performed to identify the tensile failure patterns occurring in the remaining rock mass right after blasting in mine stope. The configuration of the simplified model will probably be useful in small-scale laboratory tests for investigating the source mechanism of rockburst.

Biological Activities and Physiochemical Properties of Gangwon-do Endemic Makjang Products (강원도 시판 막장제품의 이화학적 품질특성 및 생리활성 조사)

  • Kim, Byoung-Mok;Jung, Jee-Hee;Lim, Ji-Hoon;Jung, Min-Jeong;Jeong, Jae-Whung;Choi, Yong-Suck;Sim, Jea-Man;Jeong, In-Hak;Kim, Young-Myoung
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.44 no.6
    • /
    • pp.862-873
    • /
    • 2015
  • In this study, we investigated the physiochemical properties and biological activities of Gangwon-do endemic Makjang (MJ) products (12 types). The pH levels of all samples were in the range of 4.43 to 5.69, and MJ5 showed the highest pH (5.69). The salinities of all samples ranged from 11.1% to 16.9%. Hunter color values for L (lightness), a (redness), and b (yellowness) ranged from 26.2 to 36.9, 3.9 to 11.5, and 6.5 to 16.6, respectively. The amino nitrogen content of MJ2 was highest, whereas the total content of free amino acids of MJ11 (4,657.7 mg%) was highest. Total fatty acid contents of all samples ranged from 1,598.6 mg% to 2,874.4 mg%, with MJ10 showing the highest fatty acid content. The content of total polyphenolic compounds ranged from 401.48 to $746.67{\mu}g$ tannic acid equivalent/mL, with MJ11 showing the highest content. The 1,1-diphenyl-2-picrylhydrazyl and 2,2'-azino-bis(3-ethylbenzothiozoline-6-sulfonic acid) radical scavenging effects of MJ11, MJ8, and MJ4 were 51.30% and 82.5%, 41.29% and 67.0%, and 49.88% and 87.7%, respectively. MJ12 showed the strongest growth inhibitory effect on lung cancer A549 cells, whereas MJ5 showed the strongest growth inhibitory effect on AGS gastric cancer cell and MCF-7 breast cancer cell. MJ7 showed greater lipid accumulation inhibitory activity in HepG2 cells than the others. ACE inhibitory activity of MJ11 was the highest among the samples.

Correlation Between Drilling Parameter and Tunnel Support Pattern Using Jumbo Drill (도로터널에서 지보패턴별 굴착지수 상관관계 고찰)

  • Kim, Nag-Young;Kim, Sung-Hwan;Chung, Hyung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.4
    • /
    • pp.17-24
    • /
    • 2001
  • Four road tunnels of which the construction conditions were similar were selected in the paper, and laboratory tests and rockmass classification for the tunnels were carried out. And the analysis was performed to find out the correlation between ratio of bit abrasion or drilling parameter and support pattern of tunnel using jumbo drill machine. It was analyzed that there was average abrasion of bit from 11.85% to 3.25% per support patterns of tunnel in four tunnels. Drilling parameter happens to fluctuate according to extent of fracture zone.

  • PDF

Recovery Executions of Collapsed Face in Weak Zone (저토피 연약대 터널막장 붕락에 대한 갱내 보강사례)

  • Lee, Hong-Sung;Woo, Sang-Baik;Choi, Byung-Kil;Park, Kyung-Wook
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.331-341
    • /
    • 2006
  • 터널 설계시 일반적으로 지반조사와 물리탐사를 시행하여 지층에 따른 적절한 터널 지보패턴을 설정하고 있으나, 다양한 지반 및 지질특성과 설계단계에서 미쳐 발견되지 못한 단층등의 연약대로 인하여 시공시 터널내에서 종종 붕락사고가 발생하고 있다. 터널 굴착시 발생하는 붕락은 터널의 안정성 저하 및 공기 지연 등의 큰 문제점들을 발생시키므로 조기에 적절한 보강방안이 요구된다. 본 논문에서는 터널 굴착시 발생한 두개의 붕락사고에 대해서 붕락원인과 붕괴유형을 파악하고 현장 여건에 맞는 신속한 보강대책을 제시하고 시공한 보강사례이다. 향 후 본 사례와 유사한 터널붕락사고가 발생할 경우 보강설계 및 보강방안을 계획.수립하는데 유용한 참고자료가 될 것이다.

  • PDF