Development of Risk Evaluation Checklist for In-Situ Production of Precast Concrete Members (기성콘크리트 부재의 현장생산 리스크 평가를 위한 체크리스트 개발)

  • Lim, Jeeyoung;Jeong, Hee Woong;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.445-457
    • /
    • 2021
  • In previous studies, it was confirmed that through the in-situ production of precast concrete members, costs could be reduced by 14.5-39.4% compared to in-plant production. In particular, it was confirmed that the factory owner did not make a contract if it did not earn more than 20% of the production cost. If precast concrete members are produced in-situ under the same conditions, the quality equivalent to that of factory production can be secured. As it is advantageous in terms of cost and quality, precast concrete members must be produced in-situ. However, it is difficult to produce all quantities in-situ due to time and various other constraints. This is because in-situ production is avoided due to anticipated risks during the project management process. However, if the risk factors are analyzed before performing in-situ production of precast concrete members, it will increase the opportunity for in-situ production. Therefore, this study develops a checklist for evaluating the risk of in-situ production of precast concrete members. By applying the checklist to one case site, it was verified that risk factors can be evaluated easily and quickly. As a result, it was analyzed that sites with a high building coverage ratio are classified as high-risk sites because it is difficult to secure usable area for production and storage. The developed checklist efficiently evaluates the risk factors of in-site production, and makes it possible for the operator to determine the risk factors, which can change frequently during project execution, and respond according to the situation.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

A Product Risk Assessment based on Scenario for Safety Management (제품안전관리를 위한 시나리오 기반의 리스크 평가기법 연구)

  • Suh, Jungdae
    • Journal of Digital Convergence
    • /
    • v.12 no.8
    • /
    • pp.101-112
    • /
    • 2014
  • In this study, a risk assessment method based on scenario for the product safety management in Korea has been developed and proposed. To this end, Korea's related regulations for product safety management should be analyzed first, and the risk assessment method necessary for the enforcement of the regulations is presented by itemizing the method into the case of general injury and toxic substances. The features of the method presented in this study are as follows: (i) It is a method based on the injury scenario which can occur during the use of product. (ii) It assesses a risk based on the probability of the scenario and the severity of injury. (iii) In the case of toxic substances, it assesses a risk considering the hazard of the toxic substances on the human body and the severity of injury. To determine the probability of the injury scenario, this study has decomposed the scenario into several configuration factors and estimates each factor's probability to calculate the whole scenario's probability. The results of risk assessment through the method of this study are presented and it is shown that the method can be applied to the product classification for the product safety management.

An Analysis of Time Varying Beta Risk in Domestic Renewable Energy Company (국내 신재생에너지 기업의 리스크 분석)

  • Lee, UiJae;Heo, Eunnyeong
    • Environmental and Resource Economics Review
    • /
    • v.22 no.1
    • /
    • pp.99-125
    • /
    • 2013
  • Renewable energy industry not only has a promising future but also has more risk than conventional energy industry because of its characteristics. Therefore, in this study, an analysis of domestic renewable energy company risk has been performed. The risk of domestic wind and photovoltaic energy companies has been analyzed by using time varying beta model. The model has been constructed based on risk factors like firm size, firm diversification index, domestic installation, and so on. The principal result of analysis can be summarized as follows. First, risk factors affect domestic renewable energy companies have been discovered. Variables like firm size, growth rate of debt ratio, firm diversification index are statistically significant. I found that large firms are less riskier than small firms. It is also confirmed that companies with high diversification index and high debt ratio have high risk. Second, I got the result that policy factors like domestic renewable energy installation and government R&D expenditure could decrease risk of domestic renewable energy company. Third, relative sensitivity of each risk factor have been discovered. The effect of each variable gets bigger in this order: growth rate of domestic installation, firm size or diversification index, growth rate of debt ratio, growth rate of government R&D expenditure.

A Decision Support Model for the Exchange Risk Management of Overseas Construction Projects (해외 건설 프로젝트의 환리스크 관리를 위한 의사결정 지원 모델)

  • An, Chi-Hoon;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.109-121
    • /
    • 2012
  • Overseas construction project orders have shown steady increase since 2001, and it took 44.5% of the total construction project orders in 2010. Overseas construction project needs more complex risk management because it is affected by more various circumstance factors than the domestic construction is. Previous studies have centered on the internal risk factors to assist the decision-making, but there are few researches on the importance and techniques of foreign exchange risk management. Inadequate management of foreign exchange risk has been found to cause huge damages due to the lacking recognition on the importance of foreign exchange risk management. Therefore, current study designed a foreign exchange risk manage model to help efficient management and decision-making. This model was developed as a technique to meet the demand of the increasing overseas construction projects for the efficient management of foreign exchange risk, and the technique will lower the risk with more and more accurate outcome by accumulating the data of profit-and-loss.

Risk Analysis of Alcohol Consumption During Underwater Activity Using the Risk Assessment and Analysis Method (리스크 평가 및 분석 기법을 활용한 알코올 섭취에 따른 수중활동 시 리스크 분석)

  • SEO, Sang-Woo;KANG, Shin-Beum;KANG, Sin-Young
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.2
    • /
    • pp.159-168
    • /
    • 2019
  • This study was designed to investigate the physiological response of humans to alcohol during underwater activity and to complete related risk analysis. After comparing human responses to alcohol during underwater activity, we analyzed physiological changes and risk level using a new risk analysis method developed in this study, 'Risk Assessment and Analysis (RAA)'. RAA is a modified method based on an internal control frame work. It has 3 steps, the first of which is to analyze risk correlation. The second step is to quantify risk and build a risk database. The last step is to analyze the diagramed risk map. Using RAA, the risk levels of alcohol use underwater were calculated and diagramed. The diagramed risk map was then used to analyze the difference between risk levels underwater before and after alcohol use. As a result, it was found that risk level underwater increased after alcohol use. This study shows alcohol use increases the ratio of high risk groups during underwater activity. It also indicates that risk levels can be quantified according to the likelihood and impairment scale, which can potentially help in identifying high risk groups for intensive management underwater.

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.

Improvement of Pressurizer PROV System through Micro-Computer and PRA (마이크로 컴퓨터와 확률론적 리스크 평가를 통한 가압기 보호계통의 설계 개선)

  • Jong Ho Lee;Soon Heung Chang
    • Nuclear Engineering and Technology
    • /
    • v.17 no.4
    • /
    • pp.302-316
    • /
    • 1985
  • Small break LOCA caused by a stuck-open PORV is one of the important contributors to nuclear power plant risk. This paper deals with the design of a pressurizer surveillance system using microcomputer to prevent the malfunction of system and has assessed the effect of this improvement through Probabilistic Risk Assessment (PRA) method. Micro-computer diagnoses the malfunction of system by a process checking method and performs automatically backup action related to each malfunction. Owing to this improvement, we can correctly diagnose “Spurious Opening”, “Fail to Reclose” and “Small break LOCA” which are difficult for operator to diagnose quickly and correctly and reduce the probability of a human error by an automatic backup action.

  • PDF