• Title/Summary/Keyword: 리스크 평가

Search Result 374, Processing Time 0.026 seconds

Risk Identification and Priority Evaluation of Military Facility Relocation by Endowment and Concession Project (기부대양여 사업에 의한 군사시설 이전의 리스크 요인 도출 및 우선순위 평가)

  • Kim, Kukjoo;Ahn, Sungjin;Park, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.3-10
    • /
    • 2020
  • The endowment and concession has been put to practical use for the relocation projects of military Facilities. Yet, in terms of the project implementation, delay of a great deal of the projects is occurring due to related regulations and standards, as well as a lack of mutual understanding between project implementers and military units. This study analyzes the risk factors by identifying and prioritizing the potential risk factors at each stage of project implementation such as the issues that limit project characteristics and implementation. Among the derived risk factors, request exceeding facility standards in the licensing and design phases, opposition to troop relocation in the project approval phase, design change during construction phase in the construction and completion phases, dissenting opinions on endowed/conceded property in the property disposal phase and absence of facility standards in the MOA conclusion phase were found to be the main object of consideration in risk management. This study is expected to provide project managers with a guideline for effectively pursuing the projects, as it provides prioritization and optimization of risk management.

A Risk Quantification Study for Accident Causes on Building Construction Site by Applying Probabilistic Forecast Concept (확률론적 추정 개념을 적용한 건설 공사 현장의 사고원인별 리스크 정량화 연구)

  • Yu, Yeong-Jin;Son, Kiyoung;Kim, Taehui;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.3
    • /
    • pp.287-294
    • /
    • 2017
  • Recently the construction project is becoming large-sized, complicated, and modernize. This has increased the uncertainty of construction risk. Therefore, studies should be followed regarding scientifically identifying the risk factors, quantifying the frequency and severity of risk factors in order to develop a model that can quantitatively evaluate and manage the risk for response the increased risk in construction. To address the problem, this study analyze the probability distribution of risk causes, the probability of occurrence and frequency of the specific risk level through Monte Carlo simulation method based on the accident data caused at construction sites. In the end, this study derives quantitative analysis by analyzing the amount of risk and probability distributions of accident causes. The results of this study will be a basis for future quantitative risk management models and risk management research.

A Study on the Multiple Spurious Operation Analysis in Fire Events Probabilistic Safety Assessment of Domestic Nuclear Power Plant (국내 원자력발전소의 화재사건 확률론적안전성평가에서 다중오동작 분석 연구)

  • Kang, Dae Il;Jung, Yong Hun;Choi, Sun Yeong;Hwang, Mee-Jeong
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.6
    • /
    • pp.136-143
    • /
    • 2018
  • In this study, we conducted a pilot study on the multiple spurious operations (MSO) analysis in the fire probabilistic safety assessment (PSA) of domestic nuclear power plant (NPP) to identify the degree of influence of the operator actions used in the MSO mitigation strategies. The MSO scenario of the domestic reference NPP selected for this study is refueling water tank (RWT) drain down event. It could be caused by spurious operations of the containment spray system (CSS) of the reference NPP. The RWT drain down event can be stopped by the main control room (MCR) operator actions for stopping the operation of CSS pump or closing the CSS motor operated valve if the containment spray actuation signal (CSAS) is spuriously actuated. Outside the MCR, it can be stopped by operator actions for closing the CSS manual valves or motor operated valve or stopping the operation of CSS pump. The quantification result of a fire PSA model that takes into account all recovery actions for the RWT drain down event lead to risk reduction by about 95%, compared with quantification result of fire PSA model without considering them. Among the various operator actions, the recovery action for the spurious CSAS operations and the operator action for the manual valve are identified as the most important operator actions. This study quantitatively showed the extent to which the operator actions used as MSO countermeasures have affected the fire PSA quantification results. In addition, we can see the rank of importance among the operator recovery actions in quantitative terms.

FAIR-Based Loss Measurement Caused by Personal Information Breach of a Company (FAIR를 통한 개인정보 유출에 따른 기업의 손해금액 산출에 대한 연구)

  • Kim, Jeong-Gyu;Lee, Kyung-Ho
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.27 no.1
    • /
    • pp.129-145
    • /
    • 2017
  • This study proposes a methodology to estimate the financial damages by personal information breach of a company and to analyse risk systematically through a case study of a company which experiences private information breach. Using FAIR(Factor Analysis of Information Risk) model, estimate the loss amount and to analyse risk objectively of a company by personal information breach. This study estimates adequacy and importance of corresponding factors applying AHP(Analytic Hierarchy Process) on each factors for assessing loss amount. By adopting proposed methodology in this study, the person in charge of actual work can assess and prove the loss amount though the latest risk estimation methodology. In addition, the person in charge can select the proper parameters for the corresponding company and can obtain the objective quantitative estimation. Hence it can be reported to the management by accurately assessing loss amount caused by personal information breach.

An Structural-relationship Study on the Effect of Venture Start-up's Technological Capability on Possibility of Insolvency (벤처창업기업의 기술사업 역량이 부실화리스크에 미치는 영향에 관한 구조관계 분석)

  • Lee, Yong-hoon;Yang, Dong-woo
    • Journal of Technology Innovation
    • /
    • v.25 no.1
    • /
    • pp.35-60
    • /
    • 2017
  • In this study, the effects of Venture Start-up's Technological Capabilities on Financial Stability and Possibility of Insolvency was investigated by use of SEM(Structural Equation Model). Technological Business Capabilities include CEO's Technological Capability, Management Specialization and the Feasibility of the Investment plan. The empirical data for this study were taken from the technology assessment data of Korea Technology Guarantee Fund(KTGF) on 1,419 Venture Start-ups from 2011 until 2012 and the financial data of the following 2 years of the sample. Venture Start-ups established within 7 years, were selected for this study's sample from viewpoint of their 'High-Risk High-Return' characteristic. The results are as follows : Manpower including CEO's Technology-related Knowledge and Experience, Management Organization's Technological Specialization and Cooperativeness, Reasonable Investment and Financing Planning etc. were proved to improve Financial Stability, and therefore reduce Possibility of Insolvency.

Probabilistic Risk Evaluation Method for Human-induced Disaster by Risk Curve Analysis (확률.통계적 리스크분석을 활용한 인적재난 위험평가 기법 제안)

  • Park, So-Soon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.6
    • /
    • pp.57-68
    • /
    • 2009
  • Recently, damage scale of human-induced disaster is sharply increased but its occurrences and damages are so uncertain that it is hard to construct a resonable response & mitigation plan for infrastructures. Therefore, the needs for a advanced risk management technique based on a probabilistic and stochastic risk evaluation theory is increased. In this study, these evaluation methods were investigated and a advanced disaster risk evaluation method, which is based on the probabilistic or stochastic risk assessment theory and also is a quantitative evaluation technique, was suggested. With this method, the safety changes as the result of fire damage management for recent 40 years was analyzed. And the result was compared with that of Japan. Through the consilience of the traditional risk assessment method and this method, a stochastical estimation technique for the uncertainty of future disaster's damage could support a cost-effective information for a resonable decision making on disaster mitigation.

건강장해요인으로서 일회용 식품포장용기의 리스크 평가

  • 김주홍;임현교
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.572-574
    • /
    • 2003
  • 현대사회의 소비자는 극도의 편리성을 추구하는 경향이 있다. 식품업계에서는 이를 충족시키기 위하여 다양한 형태의 인스턴트 식품을 개발하고 있으며, 이에 따라 식품의 포장용기도 매우 다양해지고, 일회용 식품포장용기의 사용도 급증하고 있다. 일회용 식품포장용기는 그 재질에 따라서 유해물질이 용출되거나 갖가지 형태로 소비자의 건강을 위협하고 있다.(중략)

  • PDF

해운이슈: 대지진 이후 일본 제조업의 변화 전망과 시사점 -포스크 경영연구소, 일본 기업유치 방안 검토

  • 한국선주협회
    • 해운
    • /
    • s.82
    • /
    • pp.16-21
    • /
    • 2011
  • 일본 산업에 내재된 구조적인 문제점에 지진 영향이 더해지면서 일본 제조업이 구조적인 변화를 겪을 가능성 증대되고 있다. 기존 일본 제조업의 공급사슬 모델은 그동안 효율성이 높다는 평가를 받아 왔으나, 지진과 같은 위기상황에서는 전체 생산 시스템이 중단되는 등 리스크 대응 측면에서는 취약한 모습을 보이고 있다. 일본 기업의 국내 경영 리스크 증대 및 제조업의 공급사슬 변화 영향으로 일본 기업의 해외 이전 현상이 점진적이고 지속적으로 진행될 것으로 예상된다. 일본 기업의 해외이전 과정에서 한일 기업의 협력 가능성도 증대할 것으로 예상되므로 한국 기업은 적극적으로 비즈니스 기회를 발굴하는 노력이 필요하다. 이 시점에서 한국 정부 및 지자체는 이전 기업에 대한 인센티브 부여 등 일본 기업유치 방안을 적극적으로 검토할 필요가 있다. 다음은 포스코 경영연구소에서 발표한 "대지진 이후 일본 제조업의 변화 전망과 시사점"의 주요 내용을 정리 요약한 것이다.

  • PDF

Assessment of Risk Factors for Application of Exterior Insulation Board in Cast-in-place Concrete Form System for Apartment (공동주택용 외단열 동시타설 공법 적용을 위한 리스크 요인 평가)

  • Cui, Jun-Long;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.204-205
    • /
    • 2015
  • Exterior insulation board in cast-in-place concrete form system could reduce construction period and improve quality in apartment construction. However, the method is progressed with insulation and concrete frame works at the same time, then risk is increased in duration control and quality management. Therefore, this paper analyzed risk factors through FMEA method. We found that the key risk factors delaying schedule was insulation material that soaked in the rain and quality defects on the insulation material joint. Based on this research, the risk management approach should be developed for improvement of method activation.

  • PDF

Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project (인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로)

  • Oh, Gyu-Ho;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF