• Title/Summary/Keyword: 리스크 저감

Search Result 43, Processing Time 0.03 seconds

A Study on the Risk Reduction of Real Estate Development Projects and Improvement Schemes of Main Participant's Role - A Case Study Focused on Housing Development Projects - (부동산 개발사업의 리스크 저감 및 사업 주체간 역할의 개선방안에 관한 연구 - 주택개발사업을 중심으로 한 사례연구 -)

  • Roh Jae-Hyun;Hwang Uk-Sun;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.135-143
    • /
    • 2005
  • The purpose of this study is to diminish the risk through identifying the risk factors occurring in the process of real estate development projects, and analyzing and coping with the risk factors, and enable stable advance in the development process by improving the roles and work distribution of the project investor. The results of this study are as follows : 1) identifying the risks of contractions from the step of selecting the sites must be made possible through supplemental human resources expertise in plan and construction of the operation 2) as an improvement scheme, heightening the penetration wall of development projects from the investors, proposing a registration law and a selection standard of construction companies to investors' cooperating companies enabling the growth of superior investors.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

A study on the mitigation model development for minimizing the incidents of disk unit in information system's operational risks (디스크 장애예방을 위한 피해저감모델 개발에 관한 연구 - 정보시스템 운영리스크의 관점에서 -)

  • Hwang, Myung-Soo;Lee, Young-Jai
    • The KIPS Transactions:PartD
    • /
    • v.14D no.6
    • /
    • pp.689-700
    • /
    • 2007
  • Organizations and customers lose if business activities we discontinued by an incident of information systems under the current business environment because they pursue real time enterprise and on demand enterprise. The loss includes the intangible decline in brand image, customer separation, and the tangible loss such as decrease in business profits. Thus. it is necessary to have preparedness in advance and mitigation for minimization of a loss due to the business discontinuity and information system's operational risks. This paper suggests the mitigation model for minimizing the incidents of disk unit in information system's operational risks. The model will be represented by a network model which is composed of the three items as following: (1) causes, attributes, indicators of an operational risk, (2) a periodic time through an analysis of historical data, (3) an index or a regulation related to the examination of causes of an operational risk.

A Study on Countermeasures for Risk Factors Through Risk Analysis of Earthwork (흙막이공의 리스크 분석을 통한 리스크 요인별 대응 방안에 관한 연구)

  • Jeon, Byung Ju;Isah, Muritala Adebayo;Kim, Hyun Bee;Lee, Yang Gyu;Kim, Byung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.681-688
    • /
    • 2022
  • According to a recent study, most construction companies in Korea do not manage risk effectively, and it is judged that the risk management system needs to be improved. In addition, most risk-related studies deal with risks from a macroscopic perspective, and there are few studies dealing with process risks at the project construction stage. Therefore, this study tried to suggest a risk response plan through analysis and classification of risk factors that may occur in retaining work among process risks. To this end, a workshop was held for risk experts to identify and analyze risks that may occur during the construction of retaining work for apartments. As a result of the study, it was expected that savings of KRW 4.97 billion would be possible in the 95 % confidence interval, and the maximum possible cost was reduced from KRW 15 billion to about KRW 10 billion. Based on the risk reduction ratio, it was found that risks that can be reduced without any special input cost, risks with large effects in response to risks, and risks with insignificant effects were found. Therefore, using the types and risk factors presented in this study as guides, it is expected that it will be helpful in successfully operating the project if an appropriate response strategy is prepared and systematically responded to the site conditions.

Overall risk analysis of shield TBM tunnelling using Bayesian Networks (BN) and Analytic Hierarchy Process (AHP) (베이지안 네트워크와 AHP (Analytic Hierarchy Process)를 활용한 쉴드 TBM 터널 리스크 분석)

  • Park, Jeongjun;Chung, Heeyoung;Moon, Joon-Bai;Choi, Hangseok;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.453-467
    • /
    • 2016
  • Overall risks that can occur in a shield TBM tunnelling are studied in this paper. Both the potential risk events that may occur during tunnel construction and their causes are identified, and the causal relationship between causes and events is obtained in a systematic way. Risk impact analysis is performed for the potential risk events and ways to mitigate the risks are summarized. Literature surveys as well as interviews with experts were made for this purpose. The potential risk events are classified into eight categories: cuttability reduction, collapse of a tunnel face, ground surface settlement and upheaval, spurts of slurry on the ground, incapability of mucking and excavation, and water leakage. The causes of these risks are categorized into three areas: geological, design and construction management factors. Bayesian Networks (BN) were established to systematically assess a causal relationship between causes and events. The risk impact analysis was performed to evaluate a risk response level by adopting an Analytic Hierarchy Process (AHP) with the consideration of the downtime and cost of measures. Based on the result of the risk impact analysis, the risk events are divided into four risk response levels and these levels are verified by comparing with the actual occurrences of risk events. Measures to mitigate the potential risk events during the design and/or construction stages are also proposed. Result of this research will be of the help to the designers and contractors of TBM tunnelling projects in identifying the potential risks and for preparing a systematic risk management through the evaluation of the risk response level and the migration methods in the design and construction stage.

Integrated Risk Analysis for Mitigation the Urban Flood Disaster (도시홍수 피해 경감을 위한 통합 리스크 분석)

  • Lee, Jae Yeong;Keum, Ho Jun;Han, Kun Yeun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.50-50
    • /
    • 2017
  • 도시홍수의 잠재적 위험은 홍수경감계획이 발전됨에 따라 감소하지만, 침수피해 가능성은 도시화와 도시 확장에 따라 증가한다. 침수피해 가능성에 대한 사전 파악 및 위험도 분석은 대규모 침수재해 발생 시의 위기관리에도 도움을 준다. 또한, 경제적 피해에 대한 예측은 재해발생 후 복구 및 복원 작업에 필요한 자원 할당에 매우 유용하며, 잠재적 홍수 피해에 대한 예측은 장기적인 홍수경감계획과 재해관리에 필요하다. 본 연구에서는 다차원 침수해석 모형의 결과로 산정 가능한 침수심, 유속 등의 지표들을 복합적으로 고려하여 침수위험도를 산정하고, 침수 발생 위험이 있는 지역의 인문 사회 경제적 지표를 통해 피해 저감 및 복구성을 반영하기 위한 재해 취약인자를 선정하여 해당 지역에 대한 취약도를 산정하였다. 또한, 분석된 위험도와 취약도의 연산으로 통합리스크 분석을 실시하여 침수 발생 시 해당지역에 대한 피해 예상과 지역별 상대평가가 가능하도록 하였다. 위험도와 취약도 및 리스크 분석은 다양한 인자를 동시에 고려하기 위해 여러 개의 기준에 대한 선호도를 결정하거나 최적 대안을 선택하는 다기준의사결정(MCDM)기법을 적용하였으며, MCDM기법 중 보편적으로 많이 이용되는 TOPSIS기법을 적용하였다. 이러한 리스크 분석은 우리나라 전체, 특정 시도, 시군구, 읍면동 간의 침수피해와 관련한 상대적 비교 평가가 가능하며, 대응 및 대비의 관점에서 저감 대책 수립의 우선 지역을 도출하는 데 활용될 수 있을 것이며, 침수피해 발생 후, 리스크가 큰 지역에 대해 우선적으로 복구 조치가 이뤄질 수 있을 것이다. 또한, 한정된 지자체 예산 안에서 도시홍수 피해 경감 대책 수립을 위한 의사결정에 활용될 수 있을 것으로 판단된다.

  • PDF

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

A risk management system applicable to NATM tunnels: methodology development and application (NATM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Lee, Kang-Hyun;Kim, Byung-Kyu;Lee, In-Mo;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.155-170
    • /
    • 2020
  • In this paper, a risk management system applicable to NATM tunneling projects is proposed. After investigating case histories in NATM tunnel collapse, this paper analyzes the potential risk factors and their corresponding risk events during NATM tunnel construction. The risk factors are categorized into three groups: geological, design and construction risk factors. The risk events are also categorized into four types: excessive deformation, excessive deformation with subsidence, collapse inside tunnels, and collapse inside tunnels with subsidence. The paper identifies risk scenarios in consideration of the risk factors and proposes a risk analysis/evaluation method for the NATM tunnel risk scenarios. Based on the evaluation results, the optimal mitigation measure to handle the risk events is suggested. In order to effectively facilitate a series of risk management processes, it is necessary to develop a risk register and a management ledger for risk mitigation measures that are customized to NATM tunnels. Lastly, the risk management for an actual NATM tunnel construction site is performed to verify the validity of the proposed system.