• 제목/요약/키워드: 리스크 대응

Search Result 200, Processing Time 0.019 seconds

Establishment of Risk Database and Development of Risk Classification System for NATM Tunnel (NATM 터널 공정리스크 데이터베이스 구축 및 리스크 분류체계 개발)

  • Kim, Hyunbee;Karunarathne, Batagalle Vinuri;Kim, ByungSoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.32-41
    • /
    • 2024
  • In the construction industry, not only safety accidents, but also various complex risks such as construction delays, cost increases, and environmental pollution occur, and management technologies are needed to solve them. Among them, process risk management, which directly affects the project, lacks related information compared to its importance. This study tried to develop a MATM tunnel process risk classification system to solve the difficulty of risk information retrieval due to the use of different classification systems for each project. Risk collection used existing literature review and experience mining techniques, and DB construction utilized the concept of natural language processing. For the structure of the classification system, the existing WBS structure was adopted in consideration of compatibility of data, and an RBS linked to the work species of the WBS was established. As a result of the research, a risk classification system was completed that easily identifies risks by work type and intuitively reveals risk characteristics and risk factors linked to risks. As a result of verifying the usability of the established classification system, it was found that the classification system was effective as risks and risk factors for each work type were easily identified by user input of keywords. Through this study, it is expected to contribute to preventing an increase in cost and construction period by identifying risks according to work types in advance when planning and designing NATM tunnels and establishing countermeasures suitable for those factors.

Overall risk analysis of shield TBM tunnelling using Bayesian Networks (BN) and Analytic Hierarchy Process (AHP) (베이지안 네트워크와 AHP (Analytic Hierarchy Process)를 활용한 쉴드 TBM 터널 리스크 분석)

  • Park, Jeongjun;Chung, Heeyoung;Moon, Joon-Bai;Choi, Hangseok;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.453-467
    • /
    • 2016
  • Overall risks that can occur in a shield TBM tunnelling are studied in this paper. Both the potential risk events that may occur during tunnel construction and their causes are identified, and the causal relationship between causes and events is obtained in a systematic way. Risk impact analysis is performed for the potential risk events and ways to mitigate the risks are summarized. Literature surveys as well as interviews with experts were made for this purpose. The potential risk events are classified into eight categories: cuttability reduction, collapse of a tunnel face, ground surface settlement and upheaval, spurts of slurry on the ground, incapability of mucking and excavation, and water leakage. The causes of these risks are categorized into three areas: geological, design and construction management factors. Bayesian Networks (BN) were established to systematically assess a causal relationship between causes and events. The risk impact analysis was performed to evaluate a risk response level by adopting an Analytic Hierarchy Process (AHP) with the consideration of the downtime and cost of measures. Based on the result of the risk impact analysis, the risk events are divided into four risk response levels and these levels are verified by comparing with the actual occurrences of risk events. Measures to mitigate the potential risk events during the design and/or construction stages are also proposed. Result of this research will be of the help to the designers and contractors of TBM tunnelling projects in identifying the potential risks and for preparing a systematic risk management through the evaluation of the risk response level and the migration methods in the design and construction stage.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

Establishing Risk Management Process for Improved Business Value of a Multi-Purpose Building Project (복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안)

  • Lee, Jong-Sik;Cho, Seung-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.64-71
    • /
    • 2018
  • Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.

A Study on the Establishment of Industrial Security Education Programs in Korea (한국 산업보안교육 프로그램의 정립에 관한 연구)

  • Choi, Sun-Tae;Yu, Hyeong-Chang
    • Korean Security Journal
    • /
    • no.25
    • /
    • pp.185-208
    • /
    • 2010
  • This study is to suggest the current security education programs and improvement of industrial security curriculums in Korea. We live in a world of insecurity; the world is changing at an ever accelerating pace. Life, society, economics, international relations, and security risk are becoming more and more complex. The nature of work, travel, recreation, and communication is radically changing. We live in a world where, seemingly with each passing year, the past is less and less's guide to the future. Security is involved in on one way or another in virtually every decision we make and every activity we undertake. The global environment has never been more volatile, and societal expectations for industrial security and increasing if anything. The complexities of globalization, public expectation, regulatory requirements, transnational issues, jurisdictional risks, crime, terrorism, advances in information technology, cyber attacks, and pandemics have created a security risk environment that has never been more challenging. We had to educate industrial security professional to cope with new security risk. But, how relevant is a college education to the security professional? A college degree will not guarantee a job or advancement opportunities. But, with a college and professional training, a person has improved chances for obtaining a favored position. Commonly, Security education and experience are top considerations to find a job so far, also training is important. Today, Security is good source to gain competitive advantage in global business. The future of security education is prospect when one considers the growth evident in the field. Modern people are very security-conscious today, so now we had to set up close relevant industrial security programs to cope with new security risk being offered in colleges or several security professional educational courses.

  • PDF

Risk Influencing Factors in Performance of River Disaster Prevention Project (하천재해예방사업의 성과에 미치는 리스크 영향요인)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.417-428
    • /
    • 2020
  • The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.

Risk-Based Performance Evaluation and Prediction Tool by Characterizing Construction Projects in Pre-Project Planning (초기 단계 프로젝트 특성을 고려한 리스크 평가 및 예측 툴 개발)

  • Shin, Kang-Yong;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.168-175
    • /
    • 2008
  • Project risk factors are major triggers in cost performance in construction projects. Both owners and contractors are highly concerned in managing their risks in earlier times. As such, it is needed to provide a robust risk evaluation methodology in identifying and assessing the potential risks before project execution. In previous research, risk identification was conducted only in specific phases, i. e., design, procurement, construction. Therefore, the comprehensive approach in risk management was limited and their quantifying method was not well-defined. Since the benefit of planning in earlier times are maximized compared to later times, the risk management should be implemented in earlier planning stage. This study provide a new risk evaluation method by incorporating previous research and extensive literature review. By quantifying each risk factor from an extensive industry survey, the proposed tool can enhance the reliability of each factor weight and also the weights are categorized from a various perspectives, i.e., owners, contractors, lager-scale company, smaller-scale company, building projects. The proposed tool can be also useful in deciding on whether to proceed a particular project and How much the project contingency would be set aside in project execution. The study findings can also expedite the risk management procedure in a more systematic approach.

보안팀 탐방 - CJ 인터넷 보안팀 자율과 책임, 그리고 정보보호

  • 한국정보보호진흥원
    • 정보보호뉴스
    • /
    • s.138
    • /
    • pp.30-31
    • /
    • 2009
  • 최근 몇 년간 정보보호가 사회적 이슈로 자리 잡았다. 사회적 이슈라는 단어가 일반인들에게는 정보보호와 관련된 사건 사고로 이해될 수 있겠지만, 기업의 관점에서는 정보보호와 관련된 법률과 규제에 대한 대응의 다른 이름이기도 하다. 정보보호는 비즈니스 측면에서 예상치 못한 비용을 발생시킬 수 있으며, 소비자와 기업 간 분쟁의 원인이 되는 하나의 리스크가 된다. 이 리스크를 차단하거나 줄이기 위한 가장 효과적인 방법은 기업 스스로의 자발적인 노력이 전제되어야 한다. 그런 면에서 CJ인터넷 보안팀은 '자발적 노력'이라는 단어가 참 잘 어울리는 곳이다.

  • PDF