Korean Journal of Construction Engineering and Management
/
v.6
no.3
s.25
/
pp.111-119
/
2005
The degree to which the design of a building embraces maintenance considerations has a great impact on its performance. Modern buildings are designed to meet higher building standards than in previous times. As the result, the influence of design on the maintenance of buildings is greater than ever before. The issue of building maintenance is a universal one and its consideration at the design stage is of great importance on the future performance of the building. Even though many studies have conducted to improve building performance, almost all of the results of those studies have not been utilized effectively during design. The purpose of this paper is to suggest a checklist which could be used for incorporating building maintenance concept in the design. The suggested checklist was made by reviewing previous studies and then refined through consulting with professionals of relevant fields.
Korean Journal of Construction Engineering and Management
/
v.10
no.2
/
pp.65-74
/
2009
It is expected that the number of apartment complexes in Korea that are over 20 years old will rapidly increase to more than 3,500,000. Consequently, the remodeling of these buildings is being revitalized throughout the country. Among the requirements for such remodeling, the expansion of parking lots has considerable weight. When enlarging a parking lot, the access route from an underground floor to the main building (i.e., the means of entry into the main building) determines the possibility of vertical enlargement for elevators, the size of the parking lot, the construction period, and construction expenses, etc. When enlarging an underground parking lot of an apartment complex, the access between the main building and the parking lot, as well as the inhabitants' requirements for entering the main building, are generally determined based on the designer's experience, rather than on the exact estimation of the peculiarity of the complex. In order to resolve such a problem, when enlarging an underground parking lot, a systematic and rational method is needed for selecting the means of entry into the main building. In this study, a selection model is derived for the method of selecting an access route into the main building when constructing an underground parking lot, in order to provide a reasonable decision-making process. A research method was investigated for determining the access route into the main building when enlarging a parking lot. On the basis of research carried out through in-depth interviews with experts, the characteristics for each means of entry into the main building were analyzed and the factors affecting the selection of the access route were deduced. The affecting factors selected were construction efficiency, convenience efficiency and economic efficiency. Weight values were then estimated for the selected affecting factors by applying the AHP method. Results showed that convenience efficiency, which gained the highest value, is the most important factor in selecting the means of entry into the main building. The most suitable means of entry into the main building was also suggested after estimating the applicability of the site by selecting complexes with remodeling possibility. This study will be applied as a reference for selecting the means of entry into the main building when constructing an underground parking lot particularly for older apartment complexes.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.211-218
/
2004
In a large owner organization, a program manager of multiple maintenance and remodeling projects has experienced increasing scale and complexity of coordinating the M/R projects with in-house technicians who belong to multiple trade shops. This paper proposes a dual-level hierarchical planning strategy that consists of a program master plan in the long-term horizon and a master construction schedule in an operational scheduling window. A rolling horizon approach to the program master plan is proposed to deal with the external uncertainty of unknown stream of project requests. A resource-constrained scheduling algorithm is developed to generate the master construction schedule in a scheduling window. During development of the algorithm, more emphasis is placed on long-term organizational resource continuity, especially flow management of program constraint resources, than ephemeral events of an individual activity and project. Monte Carlo simulation experiments of three scheduling windows are used to evaluate the relative performance of the proposed scheduling algorithm against three popular scheduling heuristics for resource-constrained multiple projects.
Journal of Korean Association for Spatial Structures
/
v.17
no.4
/
pp.141-148
/
2017
In this study, an advanced form-finding method of tensegrity unit modules is presented to apply on renovation building. Here a fitness function of maximum natural frequency which can lead to a maximum stiffness status was used for a genetic algorithm. To apply the lightweight pin-jointed structure to the renovation project is more economical over to build new structures. In this paper, two types of tensegrity unit are presented to build expanded structures, and their force densities are shown using the proposed form-finding method. The expanded structures which may influence renovation projects are presented by using the tensegrity units.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.81-87
/
2001
In a dynamically changing environment, the manager of a maintenance and remodeling (M/R) program is confronted with an increasing complexity of coordinating and cooperating multi-resource constrained multiple projects. The root causes of the complexity, uncertainty and interdependence, cause an internal disruption of an activity and chain reactions of disturbance propagation that deteriorate the stability and manageability of the program. This paper evaluates previous endeavors to apply production control and management techniques to the construction industry, and investigates the possibility of applying other management concepts and theories to organizational program management. In particular, this paper proposes a buffer allocation model by which periodic buffers are allocated in the flows of program constraint resources to stabilize a program master schedule instead of protecting individual activities. Comparative experiments by Monte Carlo simulations illustrate improved performance of the proposed model in terms of program's goals: productivity, flexibility, and long-term stability.
In this study, the axial stiffness of reinforcing piles (Kvr) for the vertical extension remodeling structures was estimated through 3D finite element analysis. In the computation of the minimum required axial stiffness of reinforcing piles, proposed maximum axial stiffness of old and deteriorated existing piles (Kve) based on theoretical and experimental approaches will be applied. Through this, the required increase rate of axial stiffness of reinforcing piles in order to support the increased structural loading was proposed for end-bearing and friction piles by different slenderness ratio (L/D). The numerical model was validated by comparing the computed results with actual field measurements. Based on the computed results, it was concluded that the end-bearing reinforcing pile needs 44% - 67% increase in axial stiffness to deal with the deterioration of existing piles and support the additional structural load due to vertical extension remodeling.
Korean Journal of Construction Engineering and Management
/
v.6
no.2
s.24
/
pp.129-138
/
2005
The purpose of this study is to assess economic effects for an advanced technology-based HVAC system. The study has been performed using LCC technique for the economic analysis. Data for LCC analysis are collected from estimation and interview of estimators and maintenance experts of buildings. Based on the LCC analysis, the economic effect of a new HVAC system has been predicted as follows : for the investment during 15 years of study period, (1) $21.6\%$ of LCC saving is predicted, (2) return rate for the investment is 4.8 times in case of new construction, and 14.4 times in case of building remodelling.
최근에 전력선통신(PLC: power line communication)에 관한 연구 및 개발이 활성화되고 있는 가운데, 정부에서는 전력선통신을 위한 전송채널의 주파수허용범위를 기존의 협대역인 450kHz에서 광대역인 30MHz로 확대할 계획이다. 현재, PLC 시스템에서는 대용량정보를 고속으로 전송하기 위한 고속 PLC기술의 개발이 활발히 진행되어지고 있으며, 이러한 통신시스템 기술의 구현을 위해서는 새롭게 확대될 30MHz대역에서의 전력선채널의 분석이 무엇보다도 중요한 해결 과제라고 할 수가 있을 것이다. 전력선은 각종 전기기기와 가전제품 및 사무기기로부터 발생되는 잡음들이 직접 유입되며, 또한 부하가 전력선에 연결되는 시간과 공간에 따라 전송 특성이 수시로 가변하는 특성을 가진다. 이와 같은 열악한 전력선통신채널 환경을 극복하고 통신의 에러극복능력을 향상시키기 위해서는 기존의 협대역 채널모델을 그대로 적용하기에는 부적합한 면이 많으므로, 새롭게 허용될 광대역 주파수를 갖는 전력선 채널에 대한 모델링기법이 요구된다. 따라서, 새롭게 인가될 광대역 채널을 위한 효율적인 전력선통신시스템을 개발하기 위해서는 전력선채널의 리모델링에 근거한 다양하고 실험적인 고찰이 수반되어야 하리라고 판단된다. 그러므로, 본 논문에서는 Mixture 잡음 모델링기법을 이용하여, 부하변동 및 가변적인 잡음 특성을 가진 전력선채널모델을 새롭게 분석하였다. 또한, 새롭게 분석한 전력선채널모델에 관한 수식을 직교 코드에 의한 다중접속 통신 기술인 CDMA 방식에 적용하여 비트 에러율을 유도해 봄으로써 그 유효성을 확인하였다.
It has been built or remodeled in every year train maintenance centers including subways. However, there is no standard to measure exact capacity. In today, most of criteria is referenced on Japanese. In general, we can standardize the process for 'Train Overhaul Maintenance' because its processes are similar or same patterns. The processes can be the base standard of train maintenance after being classified in detail and validating it. This study is adapt BPR methodology to present standardizes processes and the processes are mapping to layout drawing to constraint from the real world, and then evaluate the capacity using simulation. To guarantee objectivity of input data, we use research data by the National Railroad Administration and Association of Japanese Railway Engineering. Using these data to simulation, we compare to the 'Allowances' and evaluate its adequacy.
Korean Journal of Construction Engineering and Management
/
v.9
no.2
/
pp.99-107
/
2008
Rapidly increasing automobile supply rate according to improved economic level of life makes lack of parking space of apartments. Even though the initial design of parking space compiled with old regulations, it may not observe either new laws or requirement of inhabitants. Even if old apartments have no structural durability problem, outworn facilities and insufficient parking area may be a main reason for reconstruction. It causes waste of national resources and makes recycling issues. Additionally, irregularly parked cars make traffic obstruction to a fire engine and result in many fire accident victims. Parking problems of apartments are not only inconvenience but also serious safety issues. From these points of view, remodeling only for parking area expansion is necessary to avoid overall reconstruction of apartments. The purpose of this study is to suggest a retaining wall selection method for apartments underground parking lots expansion without evacuation of resident people. Effect factors to select retaining wall system are analyzed and weight values are calculated by applying AHP. One selection method of retaining wall is proposed by evaluating applicability and its sensitivity analysis is executed. This selection method is expected to help decision-making of retaining wall system selection.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.