• 제목/요약/키워드: 리모델링 공사

검색결과 129건 처리시간 0.027초

평면확장형 공동주택 리모델링 공사에서 신/구 슬래브 접합부의 횡방향 하중전달 능력 (Load Transfer Capacity for the Planar Joints between Existing and New Slab in Apartment Remodelling Construction for Enlarging the Interior Space)

  • 유영찬;김승훈;최기선;김긍환;임병호;유지영
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 추계 학술발표회 제17권2호
    • /
    • pp.295-298
    • /
    • 2005
  • In General, post-installed dowel bars are used as a shear connector to ensure the composite actions between new slabs and existing slabs in an apartment remodelling constructions expecially for enlarging the interior space outward the existing buildings. But, it has not been checked that the connection performance between existing and new slab is satisfactory not only for the structural safety condition but also the for serviceability and dwelling requirements. In this research, an experimental works were presented to evaluate the load transfer capacity for the planar joints between existing and new slab. The existing slabs were obtained from the existing apartment housing which will be demolished. Test results showed that the planar joints with post-installed dowel bars behaved in full composite modes until ultimate capacity of test specimens, so sufficient ultimate and serviceability performance are confirmed.

  • PDF

UHPC 외장패널을 활용한 비정형 곡면 파사드의 시공사례에 대한 연구 - 삼성동 KEB 하나은행 리모델링 공사 - (Study on Construction Example of Free Formed Curved Facade using External UHPC Panels -Focused on the Remodeling Construction of Samsung-dong KEB Hana Bank -)

  • 박영미;김혜원;박기홍;김성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.62-63
    • /
    • 2017
  • According to the rapid development of digital technology, the free formed buildings with complex and various curved surfaces are being constructed. Most of the external cladding of free formed buildings have been applied materials such as metal, glass, FRP, GFRC, etc. However, these materials have many disadvantages such as a complicated manufacturing process for realizing 3D irregular shape and an increase in production period and cost. Therefore, the studies for UHPC which is an optimized material for overcoming this problem for a long time in overseas. This study reviewed the remodeling construction of Samsung-dong KEB Hana Bank appling the exterior curved UHPC panel for the first time in Korea. As a result, we confirmed the possibility of UHPC panels with various free formed shapes.

  • PDF

기존 건축물의 에너지 효율화 리트로핏 패키지 방안 (Energy efficiency retrofit package plan for existing buildings)

  • 김수민;조현미
    • 토지주택연구
    • /
    • 제11권1호
    • /
    • pp.95-101
    • /
    • 2020
  • In the past few decades, the global population growth and rapid economic development have resulted in significant increases in building energy consumption. To reduce greenhouse-gas emissions and building energy consumption, building materials and energy technologies must be optimized. Building retrofitting is a more efficient method than reconstruction to improve the building energy performance. In order to improve the energy performance of existing buildings, this study proposed energy-efficiency retrofit plans and derived cost-effective retrofit plan. The energy efficient retrofit method is achieved through the packaging of energy technology and the energy and cost reduction effect of the energy efficiency retrofit package are analyzed. As a result of the study, the energy-efficiency retrofit package showed an energy reduction effect of up to 60% or more and a construction cost reduction of about 30%. This study argues that optimal energy and construction cost reduction of existing buildings are possible through the packaging of energy efficiency technology.

인터뷰 - 유신재⋯옛 원형 보존하며 현대적 공간의 사용성 이뤄내다 (Interview - Yooshinjae - House of thoughts and trust Achieved the usability of modern space while preserving the old prototype)

  • 육혜민
    • 건축사
    • /
    • 통권630호
    • /
    • pp.16-21
    • /
    • 2021
  • 서울 용산구 한강대로에 위치한 529제곱미터 규모의 2층 사옥 '유신재'. 일제강점기 시절 건설된 벽돌(연와조)과 철근콘크리트조, 목조 트러스 지붕 구조의 이 낡은 건물은 준공(1926.06.23)된 지 90년이 훌쩍 넘었으며, 건물주인 (주)유신이 역삼동으로 사옥을 이전한 후 30여 년간 문서보관소로 사용돼왔다. 그런 이 건물이 지난 4월부터 8월까지의 공사를 거쳐 유신건축(주.유신건축 종합건축사사무소)의 사옥으로 새롭게 태어났다. 근 100여 년의 흔적을 그대로 간직한 건물의 리모델링 설계자는 유신건축의 김지덕 건축사(부(父))·김우영 건축사(자(子)/ 영국왕립건축사) 부자(父子)다. 지난 9월 24일, 유신재에서 함께 일하고 있는 두 부자 건축사의 이야기를 직접 들어보았다.

  • PDF

그린 프레임 합성 PC부재의 양중공정 분석 연구 (A Study on the Lifting Progress for Composite Precast Concrete Members of Green Frame)

  • 주진규;김신은;이군재;김선국;이성호
    • 한국건설관리학회논문집
    • /
    • 제13권3호
    • /
    • pp.34-42
    • /
    • 2012
  • 국내 공동주택의 리모델링 수월성 및 이에 따른 장수명화를 위해 그린 프레임 공법이 개발되었다. 그린 프레임 공법은 합성 프리캐스트 콘크리트 부재를 이용한 라멘구조로 벽식 구조와는 달리 양중 및 설치가 골조공사의 주공정으로 작용한다. 따라서 그린 프레임에 의한 적정 골조공사 공기 산정을 위해서는 체계적인 양중계획이 필요하다. 그러나 양중계획은 그린 프레임을 구성하는 요소인 합성 PC 부재(기둥, 보)의 단위 양중공정에 대한 분석이 선행되어야 한다. 따라서 본 연구는 그린 프레임 합성 PC 부재의 양중공정을 분석하는 것을 목적으로 한다. 이를 위해 합성 PC 기둥과 보의 양중절차와 시간을 도출하고, 그 결과를 사례 프로젝트에 적용하여 기준층의 양중 사이클을 분석한다. 본 연구의 결과는 향후 그린 프레임에 의한 골조공사 양중계획 시 핵심자료로 사용된다.

공동주택의 분별해체를 위한 부위별 원단위 산정사례연구 (A Case Study of Estimating Units of Deconstruction Waste by Each Parts for the Apartment)

  • 김창학;이경희
    • 대한토목학회논문집
    • /
    • 제28권1D호
    • /
    • pp.73-81
    • /
    • 2008
  • 향후 국내의 주택건설 산업은 신규 택지개발에 의한 주택공급 방식보다는 기존 주택의 재개발 및 재건축에 더 큰 비중을 둘 수밖에 없으며, 현재 그러한 추세가 급속하게 확산되고 있다. 또한 재고주택 중 공동주택이 50% 이상을 차지하고 있으며, 이들의 유지보수, 리모델링 및 재건축은 주거지의 슬럼화 방지, 건물성능 저하에 따른 재난방지 등을 위하여 반드시 필요한 분야가 되었다. 따라서 이러한 재개발 재건축 등의 활성화로 인하여 도심지 해체공사가 증가함에 따라 건설폐기물의 발생량이 대폭 증가하고 있다. 따라서 건설폐기물의 적정관리는 매우 중요한 사항이 되어 가고 있으나, 발생 폐기물을 정확히 예측하기 위한 연구가 부족하였다. 따라서 본 연구에서는 공동주택의 해체물량을 정확히 예측할 수 있는 건설폐기물 원단위 산정 기준을 제시한다. 이것은 해체공사시 발생 가능한 건설폐기물을 손쉽고 정확히 예측할 수 있으며, 이것은 국가 폐기물 정책에 매우 중요한 자료로 활용될 수 있을 것이다.

종합병원 설비집약적인 부문의 리모델링 방안에 관한 연구 - 중앙진료부와 공급부를 중심으로 - (A Study on the Remodeling Strategy for the Equipment Intensive Areas of General Hospitals - Focused on the Diagnosis/Treatment Areas, the Supply Areas -)

  • 김하진
    • 한국실내디자인학회논문집
    • /
    • 제14권1호
    • /
    • pp.100-108
    • /
    • 2005
  • If remodeling is defined as activities that restore the overall function of a building up to the standards currently demanded rather than as a simple replacement or repair of old facilities and equipment, the main task of remodeling should be the reduction in differences between areas, establishment of a functional linkage between departments and setup of a smooth circulation system. Therefore, this study is an analysis of remodeling strategies and construction processes to resolve major tasks of remodeling. Through this research we acquire concluding remarks. 1) The remodeling strategies of equipment-intensive areas can be divided into two measures: utilizing the existing buildings (the main buildings) the most, and of concentrated relocation in the new buildings. The former method is advantageous in that the main building serves as a center in hospital layouts because concentrated placement of the diagnosis/ treatment area and the supply area benefit the overall operation in terms of functions. However, the measure has limits in that it is difficult to install the facilities and equipment of the new demands due to the low ceilings, which serve as a potential challenge in future growth and changes. 2) The latter measure is the one in which equipment-intensive areas and the areas that are absolutely short of space are first placed in the new buildings while other areas (the outpatient area, the administration area and the miscellaneous areas) are in the existing building (main building). Given the possibility of development In the future, concentrated placement in the new buildings can be said to be more effective order to actively address future growth and changes.

AHP 분석을 통한 종합병원 리모델링 공사의 리스크 요인 우선순위 평가 (An Evaluation of the Importance of Risk Factors for the General Hospital Remodeling Approached by Analytic Hierarchy Process (AHP))

  • 문성주;고성석
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제30권3호
    • /
    • pp.45-56
    • /
    • 2024
  • Purpose: It is important to note that the relative importance of risk factors should be identified to successfully complete the remodeling project of general hospital. Approached by analytic hierarchy process (AHP), the present study aimed to systematically evaluate the risk factors for remodeling of general hospital. Methods: The present work classified the risk factors of general hospital remodeling into four major categories including the requirements survey stage, planning and design stage, dismantling and construction stage, and maintenance stage. In addition, four sub-categories were derived from each major category factor. Furthermore, five major categories and four subcategories were selected to be considered from the perspectives of two stakeholders of contractor and constructor. The relative importance of the major and sub-categories factors was calculated using the AHP technique on the survey data collected from 49 respondents who participated in the survey study. Results: The results indicate that, the risk factor of requirements survey stage was found to be the most important risk factor to consider among the four major categories of factors. Also, insufficient preliminary investigation, design inconsistencies in architecture/mechanics/electricity, occurrence of safety accidents, and insufficient review of various equipment capacities and performances were found to have the highest priorities of each subcategory factor group included in the four major categories. From the perspective of contractor, the error in predicting the construction period was found to be the most important risk factor. The occurrence of safety accidents during construction was found to be the most important risk factor to be considered by constructor. Implications: The result of the current work should provide important insights and guidelines for the risk management activity that contributes to controlling the project time, cost, and scope required for general hospital remodeling.

Green Frame의 골조공사 공기 분석 연구 - 공동주택을 중심으로 - (Analysis of Structural Work Scheduling of Green Frame - Focusing on Apartment buildings -)

  • 이성호;김신은;김광희;주진규;김선국
    • 한국건축시공학회지
    • /
    • 제11권3호
    • /
    • pp.301-309
    • /
    • 2011
  • 현재 국내 주택의 근간을 이루는 내력벽식 공동주택은 구조적 한계로 인해 단수명화되고 있다. 이로 인해 발생하는 재건축은 막대한 자원 및 에너지 소비와 건설폐기물로 인한 환경오염을 유발하고 있다. 정부는 이러한 문제 해결의 방안으로 리모델링이 가능한 라멘구조를 유도하는 인센티브 제도를 시행하고 있다. 따라서 새로운 개념을 적용한 라멘구조의 공동주택을 위하여 개발된 복합PC구조인 Green Frame은 내력벽식 및 기존 라멘조식 공동주택이 리모 델링이 어렵다는 단점을 개선할 수 있을 뿐만 아니라 공사기간 단축이 가능할 것이다. 그러므로 본 연구에서는 Green Frame의 특성과 절대공기를 분석하고, 구조별 공동주택의 골조공사 공기와 비교 분석하여 차이점을 규명하였다. 그 결과 Green Frame을 공동주택에 적용할 경우 공기단축이 가능한 것으로 나타났다. 따라서 건설공사에서 공기는 매우 중요한 요소로 향후 성공적인 공동주택의 사업을 위해서 중요한 핵심기술로서의 역할을 할 수 있을 것으로 사료된다.

저층 교육시설 증축공사에서 모듈러 공법의 적용효과 분석 (Application Effect Analysis of The Modular Construction Method in The Extension Works)

  • 김학철;신동우;차희성;김경래
    • 한국건설관리학회논문집
    • /
    • 제16권6호
    • /
    • pp.101-111
    • /
    • 2015
  • 세계적 추세인 친환경에 맞춰 국내 건설 산업은 리모델링 및 증축에 관심을 갖게 되면서 모듈러 공법이 대두되고 있다. 모듈러 공법은 기존의 공법과는 달리 공장에서 70%이상을 모듈 형태로 제작하고 현장에서는 단기간 내에 조립만 하여 완성하는 공업화 건축시스템이다. 모듈러 공법은 현장 작업 감소로 인한 공기단축, 경량철골 사용으로 인한 하중 부담 감소, 반복 생산으로 인한 공사비 절감 등 많은 장점을 갖고 있다. 하지만 현재 상용화되고 있는 기존 공법의 진입 장벽이 높아 활성화되지 않고 있는 실정이다. 이에 본 연구는 공법 선정에 영향을 줄 수 있는 관계자의 의사결정에 도움을 주고 모듈러 시장의 활성화를 도모하기 위해 모듈러 공법을 가장 효율적으로 사용할 수 있는 증축 공사에 적용하고자한다. 실제 사례를 비교 분석하여 공기, 공사비, 노무인력 등의 측면에서 타 공법과의 차별성을 강조하고, 구체적인 효과 분석을 통해 모듈러 공법의 경쟁력을 알리고 모듈러 공법의 활발한 국내 도입에 일조하고자 한다.