• Title/Summary/Keyword: 리모델링 계획

Search Result 137, Processing Time 0.032 seconds

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

A Study on the Remodeling Plans of Rural Villages for a Pleasant Settlement Environment (쾌적한 정주환경 조성을 위한 농촌마을 리모델링 추진 방안 연구)

  • Kim, Sang Bum;Son, Ho Gi;Shin, Min Ji
    • Journal of recreation and landscape
    • /
    • v.6 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • This study, presents the details of a propulsion system for a systematic approach to the remodeling of rural villages as part of the pilot project that will be implemented in 2013. Studies on remodeling rural villages have focused mainly on various concepts of remodeling purposes and functions, and on the size and allocation standards of the facilities, such as rural houses, village rest areas, or public facilities. Thus, research is required on the establishment of a plan to restructure rural spaces and suggestions regarding the standards applicable at the local sites. This study employed an upward access system to prepare for the remodeling project and encourage the local residents' participation. As a result, the local residents voluntarily participated in drawing up a comprehensive plan for the village maintenance settings and forms, and for making the arrangements, by discussing the pros and cons of the plan, or through the forum. Based on this result, the local government examined the project in terms of its specifics, size, timing, budgetary appropriation, and anticipated results in order to implement the project, and also provided aid from the field experts to review the plan for the space and facility plans, and the legal system to establish the remodeling plan for the rural villages. Thus, this study attempts to contribute toward improving the quality of the rural villager's lives through a comprehensive remodeling of the whole rural village, not through an individual remodeling method.

A Study on the Planning Standards for Closed Business Factories Remodeling in the Industrial Complex (산업단지 내 휴폐업공장 리모델링 계획기준에 관한 연구)

  • Kim, Ransoo
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.11
    • /
    • pp.192-203
    • /
    • 2020
  • Remodeling is urgent as the number of closed factories in the industrial complex increases due to the long-term economic decline. Accordingly, the government is promoting the remodeling of a closed-up factory as one of the industrial complex restructuring projects underway to restore the competitiveness of aging industrial complexes. The purpose of this study in to analyze the feasibility of remodeling of 4 closed-up factory in an industrial complex. In details, this study analyzes the factories that need to be remodeled with the reasonable grounds, and suggests in what order and manner the remodeling should proceed. The data were collected from literature review and on site field survey. As a result of the study, the feasibility of remodeling was recognized in all four closed factories, but Factory A was found to require a more detailed rental attraction plan and management operation plan. The final conclusions were verified through working-level meetings and experts' advise.

Ontology based Green Remodeling Alternative Selection Method (온톨로지 기반 최적 리모델링 대안선정 방법)

  • Ji, Hyunsuh;Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.61-70
    • /
    • 2023
  • Due to economic or environmental reasons, green remodeling projects for old buildings are being actively carried out. Meanwhile, in the process of performing the green remodeling, the plan of green remodeling including passive and active elements has been decided based on the subjective experience and knowledge of engineers currently. Therefore, in this study, an ontology-based green remodeling decision-making support model, which can analyze the properties of old buildings and suggest appropriate remodeling plans, was established. In the developed model, once the basic properties of a building are entered, an appropriate remodeling plan composed of passive and active elements can be provided. By utilizing the results developed through the research, it is expected that it will be possible to support decision-making on more objective and appropriate remodeling alternatives development through web-based meta data search in accordance with the accumulation in remodeling cases.

Scheduling Technique for Remodeling Project of Inhabited Condition (재실 리모델링 특성을 반영한 공정계획 기법)

  • Paik, Hwa-Sook;Nam, Wook-Jin;Kim, Sung-Han;Kim, Hyung-Jin;Choi, Jong-Soo;Kim, Kyung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.141-149
    • /
    • 2013
  • This paper presents a scheduling technique that reflects various constraints in remodeling project of inhabited condition. The remodeling project of inhabited condition is required more detailed planning and control due to claims by noise, vibration, dust, smells, limited lift capacity, and limited temporary stock area. Because of the constraints, complexity in scheduling is increased and earlier completion is required to reduce the possibility of safety and environment accidents. Especially, in case of inhabited condition, the scheduling should be linked day-time/night-time/weekend work. This paper proposes a structured scheduling technique to incorporate those constraints in remodeling of inhabited condition. This scheduling technique considers not only remodeling process but also dismantling, newly-construction, and residents movement. Process expression method using MS-Project also presented to keep connectivity with existing scheduling system.

A Study of Planning and Application of Fire Protection Facilities in Remodeling (리모델링시 소방시설의 계획 및 적용에 관한 연구)

  • Jung, Jin-Ho;Yun, Myung-O;Je, Jin-Ju
    • Fire Science and Engineering
    • /
    • v.22 no.5
    • /
    • pp.90-98
    • /
    • 2008
  • There are diverse barriers such as limits to space, time, economy, technology, institution, and etc. in remodeling construction compared to new construction and it needs to overcome such limits. Consequently, for effective performance of construction, planning and application fit for remodeling characteristics shall be made available in time and various studies into remodeling for each construction category are necessary to achieve this. Taking these into account this study conducted research of the followings to draw out necessary steps for planning and application of fire protection facilities in remodeling, to overcome various barriers that may arise during any project operations, and to provide useful materials for construction of reasonable and effective fire protection system.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

A Feasibility Study of Public Libraries Remodeling: Focusing on Busan Metropolitan City (공공도서관의 리모델링을 위한 타당성 연구 - 부산광역시교육청 공공도서관을 중심으로 -)

  • Rho, Jee-Hyun;Lee, Eun-Ju;Cho, Yon-Wan
    • Journal of Korean Library and Information Science Society
    • /
    • v.48 no.4
    • /
    • pp.209-233
    • /
    • 2017
  • Old-age public libraries constructed in the 1970s and 1980s are exposed to safety problems and user complaints due to facility aging. For this reasons, demands and in-depth discussions for the remodeling of old public libraries are on the rise. The Korean Committee on Library and Information Policy has set this issue as a major initiative, and local governments are also interested in establishing an action plan. The purpose of this study is to analyze the feasibility for remodeling of 8 obsolete public libraries in Busan metropolitan city. In details, this study analyzes the libraries that need to be remodeled with the reasonable grounds, and suggests in what order and manner the remodeling should proceed. The data were collected from literature review, on site field survey, and questionnaire survey targeting librarians and library users. The final conclusions were verified through working-level meetings and experts' advise.

이슈 & 이슈 - 원하는 만큼 고쳐쓰는 '아파트 리모델링'

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.277
    • /
    • pp.48-55
    • /
    • 2013
  • 국토교통부(장관 서승환)는 수직증축 리모델링 허용 등을 포함한 '공동주택 리모델링 제도개선 방안'(6.5 발표)의 후속조치로 노후 공동주택 거주 주민이 부담 가능한 범위에서 불편사례를 선택적으로 개선할 수 있도록 '맞춤형 리모델링' 활성화를 위한 연구용역을 마무리하고, 조만간 가이드라인을 제작 발표할 계획이라고 밝혔다. 가이드라인에는 주차장 부족, 배관 노후화 등 노후 공동주택 거주 주민들의 주요 불편사항(급 배수관 노후화, 주차장 부족, 난방효율 저하, 승강기 부족 등)을 효과적으로 해소할 수 있도록 단지 동 세대 내에서 각각 시행할 수 있는 총 39가지의 리모델링 아이템에 대한 소개와 공사비 등의 정보가 포함될 예정이다. 먼저, 단지내 리모델링에는 데크 지하주차장 신설, 녹지 보육시설 및 헬스장 등 확충, 노후상가 철거 후 별동 증축 등이 포함되며, 아파트 개별 동 내에서는 급 배수관/전기 통신/소방 등 노후 설비 교체, 승강기 신설, 코어증축(복도${\rightarrow}$계단식 변경) 등이, 세대 내에는 문 창호 및 내장재 교체, 단열 기밀 등 에너지 성능 향상, 실내공간 재배치 등이 포함된다. 특히, 아이템별 이주기간을 재실형과 이주형으로 구분하여 주민 선택의 폭을 한층 더 넓힐 것으로 기대된다.

  • PDF