Study on the Stability of Over Break in Tunnel (여굴이 큰 터널의 안전성에 관한 연구)

  • Kim, Dong-Baek;Kwon, Ki-Jun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.2 s.21
    • /
    • pp.45-50
    • /
    • 2006
  • When we build the tunnel, occasionally, the blasted section exceed the designed section because of geological properties and the lack of blasting technologies, and the exceed section is remained as over break after the construction of tunnel lining. When the underground water leaks with silt and clay through the cracks of rocks, the large over break cause a structural stability problem in tunnel, and the back charging of over break is very important subject, because the undoing of back charging cause the drop of crashed rocks and serious problem in the stability of tunnel lining. Therefore, the theory of blast is studied and purpose the structural analysis of back charging and propose the safe method about the drop of crashed rocks.

A Study on the Decision of Influence Range of External Temperature in the Tunnel Using Thermal Camera (열화상카메라를 활용한 외부온도의 터널내 영향범위 산정방법 연구)

  • Lee, Yu-Seok;Lee, Tea-Jong;Park, Gwang-Rim;Oh, Young-Seok;Cha, Cheol-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.5
    • /
    • pp.136-143
    • /
    • 2010
  • There are three parts of tunnel which are influenced by outside temperature, entrance, exit and vent. These parts showed different tendency of deterioration(very rapid deterioration speed, wide range of defects, etc) compared with last parts of tunnel. Therefore, it needs to have different points of view when civil engineers analyze the defects on these parts and apply the retrofit or rehabilitation methods for them. However, when we conduct maintenance works, precise inspection and precise safety diagnosis, these defects had been neglected because those were considered as unimportant defects and caused from temporary weather and temperature change. In this study, two urban tunnels were analyzed to decide the range of tunnel which are influenced by outside temperature using a thermal camera, and to find out the causes of defects on these parts. From the results, the main points of maintenance were presented.

Measurement of Air Tightness of Concrete Block and its Construction Joint from a Model Experiment (모형실험을 통한 콘크리트 블록 및 시공이음부의 기밀성 측정)

  • Kim, Hyung-Mok;Ryu, Dong-Woo;Synn, Joong-Ho;Song, Won-Kyong
    • Tunnel and Underground Space
    • /
    • v.20 no.6
    • /
    • pp.434-445
    • /
    • 2010
  • Underground compressed air energy storage (CAES) system in a lined rock cavern is considered one of the promising large-scale energy storage technologies. In this study, permeabilities of concrete lining block and its construction joint, which are the major components of an air tightness system of the undeground CAES, were measured from a model experiment. From the experiment, it was found that intrinsic permeability of construction joint was larger than that of concrete block by the order scale of $10^1{\sim}10^4$, so that it would be very important to control the quality of construction joints in-situ in order to secure air tightness of storage system. And the permeability of construction joint could be decreased as low as that of the concrete block by pasting an acryl-type adhesive on bonding surfaces. Higher degrees of water saturation of the concrete block resulted in the lower permeability, which is more preferable in the viewpoint of air tightness of storage cavern.

A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel (터널 유지관리계측의 측정 및 분석주기 설정 연구)

  • Woo, Jong-Tae;Lee, Kang-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.

Meltdown Threat Dynamic Detection Mechanism using Decision-Tree based Machine Learning Method (의사결정트리 기반 머신러닝 기법을 적용한 멜트다운 취약점 동적 탐지 메커니즘)

  • Lee, Jae-Kyu;Lee, Hyung-Woo
    • Journal of Convergence for Information Technology
    • /
    • v.8 no.6
    • /
    • pp.209-215
    • /
    • 2018
  • In this paper, we propose a method to detect and block Meltdown malicious code which is increasing rapidly using dynamic sandbox tool. Although some patches are available for the vulnerability of Meltdown attack, patches are not applied intentionally due to the performance degradation of the system. Therefore, we propose a method to overcome the limitation of existing signature detection method by using machine learning method for infrastructures without active patches. First, to understand the principle of meltdown, we analyze operating system driving methods such as virtual memory, memory privilege check, pipelining and guessing execution, and CPU cache. And then, we extracted data by using Linux strace tool for detecting Meltdown malware. Finally, we implemented a decision tree based dynamic detection mechanism to identify the meltdown malicious code efficiently.

Stability analysis of shield tunnel segment lining by field measurement and full scale bending test (실대형 하중재하 시험 및 현장계측을 통한 쉴드터널 세그먼트 안정성 분석)

  • Lee, Gyu-Phil;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.5
    • /
    • pp.611-620
    • /
    • 2019
  • The shield tunnel was mostly applied to cable tunnel with a diameter of 3~4 m, recently 7.8 m diameter shield tunnel was constructed in the lower section of the Incheon International Airport runway and is planning or under construction to roads and railway tunnels in the lower section of the Han River. Segments are also becoming larger as the shield tunnel cross-section increases, which causes a number of problems in the design, construction, and performance evaluation of segments. In this study, segment lining structural safety, criteria for serviceability check considering axial forces and quality control method for approximately 8 m in diameter shield tunnel were reviewed by field measurements and full scale bending test.

Development of Mechanical Construction Method of Road Deck Middle Slab of Double Deck Tunnel in Great Depth (대심도 복층터널 중간슬래브의 기계화 시공법 개발)

  • Lee, Doo Sung;Kim, Young Jin;Kim, Tae Kyun;Kim, Chang Yeong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.3
    • /
    • pp.451-460
    • /
    • 2019
  • It is critical for Korea to make effective use of limited space as it has dense population and high traffic volume compared to its terrestrial area. To resolve this issue, diverse types of underground structures have increasingly been applied so far, and one of the most representative structures is double-deck tunnel. The construction period of the middle slab in the double deck tunnel constructed at the great depth can be considered as an important part after the tunnel lining construction in the whole process. In order to minimize the construction period required for construction of the middle slab in the double deck tunnel, it was proposed a method of the precast intermediate slab. In this study, it is suggested a mechanical construction process with dedicated equipments developed to improve the safety and the workability of erection of the precast middle slab than the current construction method using the existing mobile crane.

A Study on the Near Construction Range Considering the Factors Affecting the Stability of Water Tunnel (수로터널 안정성에 미치는 요소를 고려한 근접시공범위에 대한 연구)

  • Mingyu Lee;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.5
    • /
    • pp.5-12
    • /
    • 2023
  • Recently, due to urban development and expansion, construction plans have been increasing adjacent to existing tunnel structures such as subways, roads, and large pipelines. Structural plans adjacent to existing tunnels have different effects on tunnel stability depending on the construction method, degree of proximity, and location of new structures. In particular, the pressure water tunnel shows a very large difference from other road tunnels and railway tunnels in geotechnical characteristics and operation characteristics. Therefore, it is necessary to review the safety zone due to adjacent construction in consideration of the geotechnical characteristics of the water tunnel and the new sturure construction method. In this study, the existing tunnel safety zone standards were investigated. A stability evaluation performed numerical analysis considering the deterioration of concrete lining in operation and the characteristics of water tunnel. In addition, the impact of vibration caused by pile construction and blasting excavation of new structures was reviewed. Based on this, a pressure water tunnel safety zone was proposed in consideration of adjacent construction.

Analysis of Digital Vision Measurement Resolution by Influence Parameters (디지털 영상 계측 기술의 영향인자에 따른 정밀도 분석)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Lee, Seung-Do;Lee, Chung-In
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.12
    • /
    • pp.109-116
    • /
    • 2007
  • This study has reviewed the applicability of displacement measurement by using a digital vision technique based on typical photogrammetric methods. In this study, a series of experimental measurements have been performed in order to improve the accuracy of digital vision measurement by establishing criteria of factors of various vision measurements. It is found that the digital vision measurement tends to show higher accuracy as the image size(resolution) and the focal length become larger and the distance to an object becomes closer. It is also observed that measurement error decreases with processing as many images as possible in various angles. Applicability on high-resolution displacement measurement is proved by applying the digital vision measurement developed in this study to a large scale loading test of concrete lining.

Suggestion for the improvement of the field measurements on the shotcrete lining (터널 숏크리트 계측의 개선방안)

  • Kim, Hak-Joon;Park, Si-Hyun;Bae, Gyu-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.177-192
    • /
    • 2010
  • The field measurements on the shotcrete lining are usually performed during the tunnel construction. However, the credibility of the measurements is not certain because of the non-stress related strains occurring in the shotcrete, the uncertainty of the deformation modulus of the shotcrete, and the intrinsic difficulties involved in the strain measurements in the shotcrete. The problem related to the field measurements on the shotcrete is investigated using the review of the previous studies and the field measurement performed for this study. A method for the correction of stress measurements at the shotcrete lining, considering the non-stress related strains, is suggested using the literature review and the actual measurements obtained from the non-stress shotcretes. The deformation modulus used for the calculation of the stress acting on the shotcrete is also suggested.