• Title/Summary/Keyword: 동원물자

Search Result 10, Processing Time 0.022 seconds

Method of Location Decision far a Transfer Center Distributing a Necessary Resource Item while Considering Characteristics of the Material in Wartime (전시 군수물자의 효율적 분배와 수송을 위한 TC 위치선정 방법론 연구)

  • Jung, Byung-Ho;Kim, Ik-Ki
    • Journal of the military operations research society of Korea
    • /
    • v.35 no.2
    • /
    • pp.1-14
    • /
    • 2009
  • During wartime, the Air Force have to plan where, and how much, and what need to be distributed to surrounding local area from a chosen central bases. Each base, which has surplus more than needed amount of a certain material collected from near area of the base, is expected to distribute such surplus to other bases in shortage of it. By sending such surplus to other bases in shortage of the material, every base may get sufficient amount of all kinds of materials needed for each base during wartime. Because number of items of materials needed in each military bases during wartime are usually quite large and the frequencies of delivery from a place to other place are also pretty large if each item is delivered from a surplus place to other places in shortage, the Head Quarter of Air Force or the Logistics Command will face to difficulty to decide a reasonable delivery plan between bases for efficient and fast allocation of all materials needed to all bases during wartime. Therefore, this study suggests a solving algorithm with an established TC (transfer center: collecting and distributing center for all materials) to solve such a distribution and transportation problem.

Analysis on the Wartime Airlift Capability of Strategic Materials (전시 전략물자 항공수송 능력분석)

  • Lee, Myung-Wo;Lee, Sang-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.36-50
    • /
    • 2006
  • It is required to transport a considerable amount of wartime strategic materials from US to Korea via airlift operation. This study attempts to formulate the wartime airlift operation model and evaluate the airlift capability of mobilized resources, including civil aircrafts. Although an airlift plan has been annually updated by the Korea Transportation Command, it is necessary to evaluate the feasibility through simulation due to uncertainties in the process of airlift operation. Uncertain parameters are as follows; the inter-arrival time of materials in the US airfields, loading and unloading times, the distribution of aircraft's initial location at the time of mobilization order. The simulation is executed under two scenarios and the results are analyzed through a sensitivity analysis. Simulation result shows that the irregularity of inter-arrival time and the number of mobilized civil aircrafts are the most critical factors in influencing airlift capability.

Study on Utilization of Digital Tacho Graph in Construction Machinery Information Systemm (건설기계 정보화시스템 구축을 위한 운행기록장치 활용방안)

  • Yoon, Janet;Lee, Seung-Cheol
    • Journal of Auto-vehicle Safety Association
    • /
    • v.8 no.2
    • /
    • pp.17-23
    • /
    • 2016
  • Construction of our machine "Digital Tacho Graph" toghether with development and intergrated management system information is attached under Traffic Safety Law in article submission. This machine "Digital Tach Graph" has been mandated on a priority basis. The entire machine is constructed with specialised components to collect data that can retrive basic information. To obtain the components to perfect the information to optimize the device and system.

A Study on the Mobilization Simulation Mode of Government Exercise for Emergency (비상대비 정부연습의 동원 시뮬레이션 모형에 관한 연구)

  • Joo, Choong-Geun;Lee, Sung-Lyong
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.10
    • /
    • pp.476-493
    • /
    • 2021
  • This study is on the simulation conditions of the tentative 'mobilization simulation mode'(MOBSM) and the setting option of major simulation elements. The MOBSM is a training module that practices mobilization of various institutions through a simulation computer similar to actual situations. So far, mobilization exercise(Mob-Ex) is a message simulation method, so it is necessary to convert into a MOBSM because many problems such as fragmentary and practice only by some institutions are raised. Therefore, the theoretical background and previous studies on Mob-Ex and simulation were reviewed to derive the requirements and simulated elements of the MOBSM to meet the purpose of government level exercise and to suggest the critical concepts and the direction of application. The basic requirement is to simulate the main mobilization practices by institution and provide information on the mobilization execution in a nationwide scope. The simulation elements are simulated events and flow charts by mobilization type, simulated range and level by object, simulated contents of material mobilization by institution, key simulated items, DB application, and simulated period, etc. This study will be useful for policy establishment and follow-up research for technology development of MOBSM in the future, and will accelerate the transition to practical mobilization exercise by MOBSM.

Study on the Classification of the Disaster Prevention Resources for Effective Disaster Management (효율적 재난관리를 위한 방재자원 분류체계 구축에 관한 연구)

  • Lee, Chang-Hee;Jung, Woo-Young;Lee, Chang-Yeol;Kang, Byung-Hwa
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.153-163
    • /
    • 2013
  • The damage caused by natural and human disasters has been increasing year by year. While the damage from these disasters are unavoidable, reduction of damage level by proper establishment of control measures could be sufficiently achievable. Disaster prevention resources include resources introduced in the event of disaster, such as human, materials, equipments and facilities. Rapid yet proper inputs of these resources are the key factor to minimize any damages from the disaster. Currently, however, the standard and/or criteria for mobilization of the disaster prevention resources have not yet systematically established. Therefore, proper resource management as well as efficient resource input has not been in place. This research is an early stage construction of efficient mobilization resources, which had been irregularly loaded and applied before. Also this study has tried to provide a classification rule for efficient disaster prevention resource management and mobilization, and indeed, provide a foundation for efficient resource management system.

특별인터뷰 - 이기중 농림축산식품부 조류인프루엔자 방역과장

  • 한국오리협회
    • Monthly Duck's Village
    • /
    • s.197
    • /
    • pp.26-29
    • /
    • 2019
  • 철새가 대한민국 땅을 찾아 오는 겨울이 어김없이 다가오고 있다. 철새 도래와 함께 AI 발생 위험도가 높아지고 있는 가운데 지난 10월 23일 천안시 병천천의 야생조류 분변시료에서 H5형 AI 항원이 검출됐다. 최종 바이러스에서는 AI가 미검출됐지만 본격적인 AI 위험시기가 도래했음을 예고하고 있다. 농림축산식품부는 '19.10월부터 '20.2월가지 AI 특별방역대책기간으로 정하고 강도 높은 방역에 돌입했다. 농식품부에 따르면 대만, 중국, 러시아 등 주변국에서는 AI가 지속적으로 발생하고 있으며, 이들 국가에서 우리나라로 오는 겨울철새는 '19.10.22일 기준 지난해 동기보다 34%나 증가('18년 455천수${\rightarrow}$'19년 611천수)한 것으로 조사됐다. 충북, 충남 등 철새도래지에서 AI 항원이 지속적으로 검출되고 있으며, 겨울 철새는 내년 초까지 계속 늘어날 전망이다. 설상가상 ASF(아프리카돼지열병)가 국내 최초로 발생됨에 따라 모든 방역 인력과 장비 등 물자가 총 동원되고 있는 실정이다. 국경방역의 중요성이 그 어느 때보다 강조되는 지금 가금농가, 지자체, 농식품부는 혼신을 다해 AI 차단방역에 신경을 써야 한다. 이에 이기중 농림축산식품부 조류인플루엔자 방역과장으로부터 오리농가가 알아야 할 기분적인 방역수칙과 달라진 고강도 방역정책에 대해 들어본다.

  • PDF

Study on the Organization of Government-managed Constructions at Dongnae Province in the 19c (19세기 동래 지역의 관영공사조직에 관한 연구)

  • Kim, Sook kyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.39
    • /
    • pp.165-189
    • /
    • 2006
  • The purpose of this study is to examine process and organization of local government-managed construction by reviewing official documents and materials in regard to the official residences and castles officially constructed in Dongnae in the 19c Chosun Dynasty. Results of this study can be described as follows. 1) The construction of official residences requires exchanges of official documents among upper and lower governmental agencies concerned. Previously prepared for some 1 or 2 months, the construction was proceeded through proceeded from Paok to Gaegi, Ipju, Sangryang, Gaeok and to Iptaek. Such construction was carried out independently and concurrently Gijang and Yangsan neighboring Dongnae provided cooperation by way of supplying labor and timbers. 2) Dongnaebu castle was constructed under local autonomy system, like other government-oriented works, as governor of Dongnae became responsible for defending such establishment in 1739. The castle was built up in 1731 as an establishment with 6 gated and 15 forts. Directly controlled by governor of Dongnae, the castle continued to be partially repaired until the 19th century. Under the regime of Daewongun, the castle was enlarged and extended for military strengthening. Besides the gate having double-gated structure for the outside wall, the other five gates came to have bastions and 30 forts were additionally established, dramatically changing the structure of the castle as whole. 3) Government-managed construction was often implemented by an organization whose members included local government officials, lower administrative agencies and local influential persons. The construction of official residences was implemented by Gamyeokdogam which was headed by Jwasu of Hyangcheong. In the construction, chief of military officials became supervisor, who was responsibly supported by Saekri. The construction of castled were divided into several works, for example, establishments of fortress, tower gate and quarrying stone were implemented by the organization of Paejang, Gamkwan and Saekri. As a military official, Gamkwan supervised the construction. Saekri was in charge of related internal affairs. Paejang was an technical expert leading several workers. The construction of castles in 1870 were organized as a general rule having particularity of social conditions on Dongnae.

Priority Selection of Firearms and Ammunition for the Local Reserve Forces using Dynamic Programming (동적계획법에 기반한 지역예비군 총기, 탄약 분배 우선순위 선정에 관한 연구)

  • Cho, Sangjoon;Ma, Jungmok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.67-74
    • /
    • 2020
  • One of the missions of active-duty units in charge of managing reserve forces is providing combat supplies to reserve forces to exercise their combat capabilities quickly when declaring a mobilization order. Rear area active-duty units must support large local reserve forces. On the other hand, military units have difficulties due to a lack of forces and the storage of large quantities of firearms and ammunition. For this reason, local reserve forces should move to an integrated storing place and receive their firearms and ammunition. The existing distribution plan (existing plan) is a first-in-first-out plan that can produce inconsistent distribution orders. The inconsistent distribution orders can increase the complete distribution time, which will affect the combat power of local reserve forces. Therefore, firearms and ammunition should be distributed quickly. Accordingly, this paper proposes the priority selection of firearms and ammunition for local reserve forces with a minimum complete distribution time using Dynamic Programming. To verify the proposed model, the existing plan was compared with the proposed model using real data, and the result showed that the proposed model outperformed the existing plan.

The Burden of the Population and People during the Reign of Tang Taizong before His Invasion of Goguryeo in 645 (당 태종 '정관(貞觀)의 치'와 가정(苛政) - 645년 고당 전쟁 이전 조세·요역 수탈의 실상 -)

  • Choi Jin-yeoul
    • Journal of the Daesoon Academy of Sciences
    • /
    • v.49
    • /
    • pp.365-399
    • /
    • 2024
  • Tang Taizong was regarded as the emperor with the idea of cherishing the common people, paying close attention to his subjects' military service, and mobilizing of the people as recorded in Zhenguan Zhengyao (Essentials for Government), from the Zhenguan period during the reign of Tang Taizong. Contrary to the above, in reality, Li Shimin, the name of Tang Taizong, mobilized many subjects in the construction of Luoyang Palace in second capital city called Dongdu and Jiucheng Palace, a summer palace during Sui-Tang dynasty, and he requisitioned the subjects of Guannei Province and Longyou Province to install and protect provisional powers and a county in the Gaochang Kingdom. Given his antinomic behavior, the evaluation of Li Shimin as an ideal Confucian monarch should be reconsidered based on Zhenguan zhengyao and other historical records. Dividing the 19 years before Goguryeo-Tang War in 645 into two periods, from the throne to 637 and from 639-644, the subjects were burdened by the construction of Luoyang Palace and Jiucheng Palace in the former period. In the latter period, after the conquest of the Gaochang Kingdom, there was a requisition for the transport of troops and supplies to be stationed in Xizhou, a reorganized prefecture and counties in the Gaochang Kingdom territory; probably mainly limited to the provinces of Guannei and Lungyou, which were geographically close to the West Regin that is now known as Xinjiang Uygur Autonomous Region. The burden in the latter period was relatively less than in the former period. Even so, the number of households in 639, fourteenth year of Tang Taizong's reign, was only 34.1% and 26.8%, respectively, in 609, the sixth year of Sui Yangdi's reign. In this situation, Taizong's Goguryeo Invasion was not conducted in an economically situation during the early days of the Tang Dynasty.

A Study on Strategy of Forest Rehabilitation Support Corresponding to the Spread of Marketization in North Korea (북한의 시장화 확산에 대응한 대북 산림복구 지원전략 연구)

  • Song, Minkyung;Yi, Jong-Min;Park, Kyung-Seok
    • Journal of Korean Society of Forest Science
    • /
    • v.106 no.4
    • /
    • pp.487-496
    • /
    • 2017
  • The marketization in North Korea is spreading rapidly. This study proposes forest rehabilitation strategy for North Korea in light of their major shift toward market economy. This current trend of marketization in North Korea is now affecting the forest sector, especially the way the residents utilize small forest land. For analyzing the influence of marketization on forest management in North Korea, we reviewed the official documents issued by North Korea and related materials of North Korean marketization. The government of Kim Jong Eun has set up policies and systems regarding the spread of marketization, such as guaranteeing individuals a right to dispose certain products on their own and establishing a special economic zone to attract foreign investments. In the forestry sector, the North Korean government has been trying to fully implement its forest restoration plan by carrying out measures like re-claiming of sloping lands that had been previously used by residents. However, as marketization progresses, it is expected that there lies much difficulty in government-led massive mobilization for forest restoration due to the increase of illegal logging to meet high demand for timber, illegal firewood harvesting, collecting non-timber products for livelihoods and illegal crop cultivation to sell in the market. Therefore, South Korea's support for forest restoration should also consider the recent marketization phenomenon in North Korea. It is necessary to formulate strategic measures such as conducting joint commercialization project on agroforestry management using cooperative farming unit, helping to improve income source from small forest lands, and to activate a comprehensive mountain village special economic zone by utilizing forest business. We do hope that our proposed forest rehabilitation strategy in this paper regarding the changes in North Korea's marketization and forest policy can give a meaningful suggestion on supporting forest restoration in North Korea in an effective way.