• Title/Summary/Keyword: 도면 생성

Search Result 166, Processing Time 0.024 seconds

Automatic Detection System of Underground Pipe Using 3D GPR Exploration Data and Deep Convolutional Neural Networks

  • Son, Jeong-Woo;Moon, Gwi-Seong;Kim, Yoon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.2
    • /
    • pp.27-37
    • /
    • 2021
  • In this paper, we propose Automatic detection system of underground pipe which automatically detects underground pipe to help experts. Actual location of underground pipe does not match with blueprint due to various factors such as ground changes over time, construction discrepancies, etc. So, various accidents occur during excavation or just by ageing. Locating underground utilities is done through GPR exploration to prevent these accidents but there are shortage of experts, because GPR data is enormous and takes long time to analyze. In this paper, To analyze 3D GPR data automatically, we use 3D image segmentation, one of deep learning technique, and propose proper data generation algorithm. We also propose data augmentation technique and pre-processing module that are adequate to GPR data. In experiment results, we found the possibility for pipe analysis using image segmentation through our system recorded the performance of F1 score 40.4%.

Automated Measurement Method for Construction Errors of Reinforced Concrete Pile Foundation Using a Drones (드론을 활용한 철근콘크리트 말뚝기초 시공 오차 자동화 측정 방법)

  • Seong, Hyeonwoo;Kim, Jinho;Kang, HyunWook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.45-53
    • /
    • 2022
  • The purpose of this study is to present a model for analyzing construction errors of reinforced concrete pile foundations using drones. First, a drone is used to obtain an aerial image of the construction site, and an orthomosaic image is generated based on those images. Then, the circular pile foundation is automatically recognized from the orthomosaic image by using the Hough transform circle detection method. Finally, the distance is calculated based on the the center point of the reinforced concrete pile foundation in the overlapped data. As a case study, the proposed concrete concrete pile foundation construction quality control model was applied to the real construction site in Incheon to evaluate the proposed model.

Design and Implementation of a Blockchain System for Storing BIM Files in a Distributed Network Environment

  • Seo, Jungwon;Ko, Deokyoon;Park, Sooyong;Kim, Seong-jin;Kim, Bum-Soo;Kim, Do Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.12
    • /
    • pp.159-168
    • /
    • 2021
  • Building Information Modeling (BIM) data is a digitized construction design by worldwide construction design stands rules. Some research are being conducted to utilize blockchain for safe sharing and trade of BIM data, but there is no way to store BIM data directly in the blockchain due to the size of BIM data and technical limitation of the blockchain. In this paper, we propose a method of storing BIM data by combining a distributed file system and a blockchain. We propose two network overlays for storing BIM data, and we also propose generating the Level of Detail (LOD)-based merkle tree for efficient verification of BIM data. In addition, this paper proposes a system design for distributed storage of BIM data by using blockchain besu client and IPFS client. Our system design has a result that the processing speed stably increased despite the increase in data size.

PS-NC Genetic Algorithm Based Multi Objective Process Routing

  • Lee, Sung-Youl
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.14 no.4
    • /
    • pp.1-7
    • /
    • 2009
  • This paper presents a process routing (PR) algorithm with multiple objectives. PR determines the optimum sequence of operations for transforming a raw material into a completed part within the available machining resources. In any computer aided process planning (CAPP) system, selection of the machining operation sequence is one of the most critical activities for manufacturing a part and for the technical specification in the part drawing. Here, the goal could be to generate the sequence that optimizes production time, production cost, machine utilization or with multiple these criteria. The Pareto Stratum Niche Cubicle (PS NC) GA has been adopted to find the optimum sequence of operations that optimize two conflicting criteria; production cost and production quality. The numerical analysis shows that the proposed PS NC GA is both effective and efficient to the PR problem.

Application of Laser Scanner for Mine Management and Mining Plan (광산관리와 채굴계획 수립을 위한 레이저스캐너의 활용)

  • Park, Joon Kyu;Jung, Kap Yong
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.6
    • /
    • pp.693-700
    • /
    • 2017
  • The mines in our country are complex in geography and shape and because of its small scale, accurate surveying performance and 3D modeling are necessary for mine development and management and mining plans. However, due to the data acquisition and processing technology and economy, the existing methods are currently used. The structure, mining, and mining area of the mine are recorded and managed based on the 2D drawings. As a result, it is true that there is risk of accidents caused by problems of accuracy as well as waste of personnel and time. In recent years, research data on geology and geospatial information on mines have been integrated into a database in foreign countries, and they are used for mine management and mining planning. In this study, we tried to construct spatial information for mining management and mining plan using laser scanner. Through research, spatial information about the mine was effectively obtained and produced data modeled through data processing. The 3D model for mining mines is expected to be a valuable tool for establishing and operating a safe mining plan for mines.

Analyses on the Impact of Plastic Deformation on Change of the Road Surface Condition (소성변형 정도를 고려한 시간전개에 따른 노면상태 변화 분석)

  • SON, Young Tae;PARK, Sang-Hyun
    • Journal of Korean Society of Transportation
    • /
    • v.36 no.3
    • /
    • pp.216-228
    • /
    • 2018
  • In this study analyzed the ponding changing of plastic deformation section follwed time development to apply weather, geometry and traffic data in additon to time development to improve road management service and safety of roads during or after rain. After We selected an 8.3km section of old national highway the Seongnam-Janghowon section and created a three-demensional surface of terrain through the numerical transformantion of design drawing data, with reflection the linear data of the same coordinate system in order to describe more realistic roads, we design additional structures with shading above roads. The altitude and azimuth of the sun were calculated and set based on the longitude and latitude data of the survey line for the analysis of the sun rate, and the daylight impact zone was visualized by setting the shaded time to an interval of 1 hour and the shade rate of the corresponding section. In addition, the evaporation volume calculated from weather data such as temperature, humidity, radiant energy, and road temperature analyzes together, it will use the way of a safer and more efficient road management as grasping the ponding changing more efficent in time development.

Analyses on Sunshine Influence and Surface Freezing Section of Road using GIS (GIS를 이용한 도로의 일조영향 및 노면결빙구간 분석)

  • Lee Hyung Seok
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.3
    • /
    • pp.293-301
    • /
    • 2005
  • In case of the roads that pass the mountain area, the cut sections or the tunnels are constructed. And In winter season it appears sunshine few in the specific segment, the shade is continued last and the freezing sections occur. So, the attention is necessary in traffic safety. This study was to evaluate the influence of sunshine and surface freezing sections expected in route plans of roads using GIS and makes alternative ideas in road stability security. After selecting 29 km sections of Donghae highway and creating a 3 dimensional terrain surface through the digital conversion of design plan data, it reflects the road alignment data of the same coordinates and a 3 dimensional road modeling is created. It set shadow time of road surface for the solar trace in the winter solstice in 20 minute interval. Shade areas are displayed and inputed in polygon data by manual vertorizing. Graphic and attribute data of this shade section is constructed in geodatabase of ArcCatalog. And it extracted the freezing section using intersect fuction of the GIS spatial analysis. By analyzing the winter meteorological data of temperature, rainfall, snowfall, humidity, and etc. and grasping dangerous freezing section of the road surface effectively, it will be able to make alternative ideas of the preliminary stability evaluation reflected in basic design.

Usability Evaluation of the Drone LiDAR Data for River Surveying (하천측량을 위한 드론라이다 데이터의 활용성 평가)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.5
    • /
    • pp.592-597
    • /
    • 2020
  • Currently, river survey data is mainly performed by acquiring longitudinal and cross-sectional data of rivers using total stations or the GNSS(Global Navigation Satellite System). There is not much research that addresses the use of LiDAR(Light Detection and Ranging)systems for surveying rivers. This study evaluates the applicability of using LiDAR data for surveying rivers The Ministry of Land, Infrastructure and Transport recently launched a drone-based river fluctuation survey. Pilot survey projects were conducted in major rivers nationwide. Studies related to river surveying were performed using the ground LiDAR(Light Detection And Ranging)system.Accuracy was ensured by extracting the linearity of the object and comparing it with the total station survey performance. Data on trees and other features were extracted to generate three-dimensional geospatial information for the point-cloud data on the ground.Deviations were 0.008~0.048m. and compared with the results of surveying GNSS and the use of drone LiDAR data. Drone LiDAR provided accurate three-dimensional spatial information on the entire target area. It was able to reduce the shaded area caused by the lack of surveying results of the target area. Analyses such as those of area and slope of the target sites are possible. Uses of drones may therefore be anticipated for terrain analyses in the future.

Developing the District Unit Plan Simulation using Procedural Modeling (절차적 모델링을 활용한 지구단위계획 시뮬레이션 개발)

  • Jun, Jin Hwan;Kim, Chung Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.3
    • /
    • pp.546-559
    • /
    • 2021
  • This research aimed to develop the district unit plan simulation using procedural modeling based on shape grammar. For this, Esri's CityEngine 2020.0 was selected as a main development tool, and Inside Commercial Area in Bangi-dong, Songpa-gu, Seoul as the research site where about 25% of the total area was developed over the past five years. Specifically, the research developed the simulation through the following three phases of Data-Information-Knowledge after selecting necessary parameters. In the Data phase, 2 and 3 dimensional data were obtained by utilizing data sharing platforms. In the next Information phase, the acquired data were generated into various procedural models according to the shape grammar, and the 2D and 3D layers were then integrated using relevant applications. In the final Knowledge phase, three-dimensional spatial analysis and storytelling contents were produced based on the integrated layer. As a result, the research suggests the following three implications for the simulation development. First, data accuracy and improvement of sharing platforms are needed in order to effectively carry out the simulation development. Second, the guidelines for district unit plans could be utilized and developed into shape grammar for procedural modeling. Third, procedural modeling is expected to be used as an alternative tool for communication and information delivery.

Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments (수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.879-892
    • /
    • 2021
  • In a make-to-order manufacturing environment, the manufacturer's quotation information is important information used as basic information for bidding, receiving orders, and producing products in response to various customer demands. This quotation information is changed according to various factors such as customer demands, changes in product production environment, changes in drawing information of technical partners, and technological improvement of products. Due to this change, various changes occur in the quotation information that the manufacturer is preparing to reflect the customer's requirements. The change of quotation information according to these various change factors puts a lot of burden on the quotation management work from the standpoint of a make-to-order manufacturing company. In particular, the change of quotation information due to the change factors of quotation is inevitable and frequently occurs due to the requirements of the customer in the customer-oriented make-to-order production environment. In this paper, we propose a quotation change process based on the quotation creation process and propose a consistent and efficient quotation change processing method. To this end, the factors causing the change of quotation were defined, and the types of changes for each factor were defined. And it shows the procedure of applying the quotation change process to the quotation management system through the cases of each cause of the quotation change. In addition, in order to show the usefulness of the quotation change factors, the type of quotation change, the quotation change process, and the quotation system management, the proposed quotation change process and function was applied in the integrated quotation management system for the ship engine division of a typical make-to-order manufacturing company 'H'. As a result, it was confirmed that the proposed quotation change process and management system according to the quotation change factors were efficiently performed.