Development of Simple Construction Method for Curbs and L-Type Gutter (경계석과 L형 측구의 간편 시공법 개발)

  • Paik, Kyu Ho;Shin, Young Ok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.961-968
    • /
    • 2006
  • Curbs and L-type gutters installed at the edge of a road are very important structures to protect pedestrians from traffic accidents and to restraint slip of cars due to rain. However, existing construction method where great parts of the construction progress are done by human power has many problems in workability, quality and cost etc. In this paper, a new construction method for improvement in workability and quality for curbs and L-type gutters is developed. In order to investigate the structural safety and quality of curbs and gutters installed by the new method, tensile and lateral load tests are performed on curbs installed by existing and new methods and uniaxial compression tests are also performed on concrete samples of gutters constructed by existing and new methods. The test results show that the alignment of curbs and the strength of gutter concrete are very much improved by applying the new method. The tensile and lateral load capacities of the curbs installed by the new method are 10.7 and 2.5 times higher than those of curbs by existing method, respectively.

A study on the enlargement of 2-lane road tunnel under construction (시공중인 2차로 도로터널의 확장 방안에 대한 연구)

  • Choi, Hae-Jun;Kim, Dae-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.33-50
    • /
    • 2011
  • Recently interest in enlargement of existing tunnel located in downtown or mountain area have been considerably increased along with requirements and discussion on the road-widening. Therefore, it is necessary to study the construction method and stability of tunnel to enlarge the existing tunnel in design. In this study, the design concept on the alignment, excavation method, reinforcement to enlarge the existing tunnel is described on the basis of the enlargement of 2-lane road tunnel under construction. This paper suggests a proper design method for the enlargement of an existing tunnel in useful practice.

Analysis of Behaviors of SPS Underground Composite Frames Considering the Rigidity of RC Wale-Steel Beam Joint (RC 띠장-철골 보 접합부의 고정도에 따른 SPS 지하복합골조 거동 해석)

  • Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.3
    • /
    • pp.243-250
    • /
    • 2004
  • In SPS system, steel beams are used as not only temporary struts supporting the wale but main flexural members of building. Previous experimental works show that RC wale-steel beam joints have some flexural rigidity. In this paper, nonlinear analysis is performed using DRAIN-2DX program to investigate the behaviors of the underground composite frames constructed with SPS system when the rigidity of RC wale-steel beam joints change. Analysis variables are the procedure of construction, magnitude of lateral forces, and flexural rigidity of the RC wale-steel beam joint with stud connector. Analysis results show the effects of joint rigidity for the yielding process of frame and the moment and deflection at the mid-span of beam.

Research on the use of BIM for smart construction of Complex Geometry buildings (비정형 건축물의 스마트건설을 위한 BIM 활용에 대한 연구 - 세종포천선 처인휴게소 시공사례)

  • Park, Yang-Heum;Nam, Dong-Hun;Kim, Byung-Soo;Park, Jungjoon;Kim, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.53-54
    • /
    • 2023
  • Because irregular shaped buildings are designed with various three-dimensional curves, the difficulty of design and construction is very high, and more construction drawings are needed to reduce construction errors. General 2D drawings may have limitations in conveying the information necessary for construction. By utilizing BIM, it is possible to three-dimensionally design parts that are not expressed on 2D drawings and additional structurall components required for the construction of the curved exterior finishing materials. This study examines the necessity of BIM at the construction stage, its performance through it, and how it can be linked to smart construction technology through construction BIM being applied to the new construction site of Sejong-Pocheon Line Cheoin Rest Area.

  • PDF

Design of Lightweight Fill Method on Soft Ground using Expanded Polystyrene (연약지반상 스치로폴 경량성토공법의 설계)

  • 유기송
    • Journal of the Korean Professional Engineers Association
    • /
    • v.27 no.5
    • /
    • pp.39-45
    • /
    • 1994
  • 스치로폴은 발포폴리스티렌(EPS : Expanded Poly-Styrene)을 말하며, 이것은 스티렌모노머(Stone Monomer)를 중합하여 만든 플리스티렌과 여기에 첨가한 발포제가 주원료로 되어 있다. 폴리스티렌은 1930년대에 미국과 독일에서 공업화되었고 스치로폴은 1943년 초에 미국에서 공업화가 이루어져 건물의 단열재, 물품포장재 등으로 이용되어 왔다. 1972년에는 노르웨이에서 연약지반상 교량의 접속도로 보수공사에 처음 스치로폴 성토공법이 이용되어 교대의 측방유동 방지대책으로 성공을 거둠에 따라 연약지반상의 경량성 토재 및 토압을 받는 옹벽, 교대 등 구조물의 경량 뒷채움재로서 각광을 받게 되었다. 한편 우리나라에서는 1994. 6월에 한국지반 공학회 주최로 개최된 "발포폴리스티렌(EPS) 이용 성토공법 국제심포지엄"에서 양산-구포간 고속도로성토(L=70m) 및 서해안고속도로의 교대 뒷채움에 스치로폴 경량성토재가 이용된 문헌이 발표된 바 있으며, 시중에서 단열재용으로 판매되고 있는 스티로폴 평판의 규격은 표 1과 같다. 스치로폴은 그 가격이 비싼 편이지만 단위중량(20-40kgf/m$^3$)이 흑의 50/1-100/1 밖에 안되는 초경량재로서 강도, 내구성 및 시공성이 우수한 성토용 신재료이기 때문에 연약지반상에서 구조물 시공시 지반의 과대한 침하, 측방유동 및 사면활동 등이 생길 경우 도로성 토재 또는 교대, 옹벽 등 구조물의 뒷채움재로서 스치로폴을 사용하면 이를 방지할 수 있으므로 매우 효과적인 토목자재라 할 수 있다. 따라서 본고에서는 지금까지의 연구결과, 시험시공 및 시공실적 등을 토대로 발표된 참고문헌을 중심으로 연약지반상 스치로폴 성토공법의 설계방법에 대하여 간단히 소개하고자 한다. 소개하고자 한다.

  • PDF

Evaluation of Performance and Construction the New National Test Road Sites of Modified Asphalt (신설국도의 시험시공을 통한 표층용 개질 아스팔트 공용성 평가)

  • Cho, Gyu-Tae
    • International Journal of Highway Engineering
    • /
    • v.4 no.3 s.13
    • /
    • pp.43-49
    • /
    • 2002
  • Asphalt pavements have to perform under the conditions of heavily-loaded vehicles due to the industrialization and large temperature variance between the summer and the winter. Due to these factors, a characteristics change of early permanent deformation becomes a big issue, and to remedy this problem many research to use modified asphalt are being widely conducted. However, most of the modified asphalt is being paved after milling the surface course and applying tackcoating, and it is being used mostly for the repair and maintenance purpose rather than pavement of new national road. The purpose of this investigation is to obtain some fundamental data for the evaluation of the performance and long-term performance of the construction material mixtures by the laboratory test and field experiments. For the field experiment, 200m of two-lanes national road, that is being paved for the new national road under the direction of Pusan Regional Construction Management Office, was paved with SBS PMA and PSMA asphalt mixtures, which are an modified asphalt mixtures used for the surface course, on top of the base course paved with other modified asphalt mixtures. The remaining section of the new national road was paved with dense grade mixture. The laboratory tests assessed and analyzed the mixture characteristics by Marshall's stability test, strength tests and wheel-tracking test. On the basis of the evaluation result of the temperature control and roughness of the newly constructed road at the field experiment site, it is desired to evaluate and identify the most economic modified asphalt mixtures by long-term performance evaluation and LCC(Life Cycle Cost) analysis in order to apply the test result to the design of new road construction in the future.

  • PDF

Characteristics of Negative Skin Friction of Foundation Pile and Construction Management by Experimental Field Test (현장시험을 통한 기초 말뚝 부마찰력의 특성과 시공관리)

  • Hong, Seok-Woo
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.41-48
    • /
    • 2012
  • In this study the negative skin friction test of foundation pile was performed in order to monitor the negative skin frictional force acting on the steel pipe pile installed in soft soil. The monitored frictional stresses obtained from the long-term loading test. Through the long-term frictional stress monitoring test, the economical period for the construction of the superstructure was determined. The following conclusion were derived from this study: (1) In soft soil, negative skin friction increases with the increase in the rate of settlement. (2) In the friction relationship graph, the period where there is no frictional strain increase is verified and the time for the construction of the superstructure is determined. (3) The pile loading test was performed and the negative skin friction was compared with the test results. It was determined that the negative skin friction after driving was larger than the negative skin friction obtained from the loading test. 15 days after the construction, the monitored value was similar with the theoretical data. (4) It was determined that even during the occurrence of negative skin friction an economical construction management can be performed using the long-term monitoring method of negative skin friction.

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

석탄층을 협재한 연암을 대상으로 한 도로터널 시공사례

  • 김주화;김선기;신경진
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2002.10a
    • /
    • pp.1-15
    • /
    • 2002
  • 동복터널의 현장지질은 편마암과 석탄층(Coal Beds)이 협재된 암질이 매우 불량한 편암으로 구성되어 있으며, 설계 시에는 석탄층의 발달이 확인되지 않아 그 영향을 충분히 고려되지 않았다. 석탄층(두께 2~8m)은 편암의 Rock Cleavage와 같은 방향과 45~55도의 경사를 가지며 pinch out and swelling 형태로 발달이 불규칙하다. 하행선굴착 중 약 290m구간에 걸쳐 석탄층이 나타났으며, 90m 구간은 천단 및 측벽부에서 집중 발달되어 쳐대일변위가 20mm이상인 지점이 발생하는 등 상반굴착 시 111.2mm의 수평방향 내공변위가, 하반굴착 시에는 최대 127.8mm의 내공변위가 발생하였고 하반관통이후 수렴되었다. 내공변위 과다발생에 대한 대책으로 지보타입을 하향 조정하였고 측벽부는 하향 록볼트를 포함한 추가록볼트 보강을 실시하였다. 한편 터널 바닥부의 석탄층은 도로포장 후 침하문제가 예상되어 인버트를 기존 강지보공과 H-beam으로 연결.폐합한 후 콘크리트로 치환(140m구간)하여 추가변위를 최소화하였으며 무근콘크리트로 설계된 라이닝은 철근콘크리트 라이닝으로 변경 시공하였다.

  • PDF