• Title/Summary/Keyword: 도로 계획

Search Result 3,300, Processing Time 0.031 seconds

Consideration about the Fire Lane Plan and the Conformability - A Case Study on Daegu Metropolitan City Buk-gu - (소방차전용출동경로의 계획기법 및 적합성 검토에 관한 연구 - 대구광역시 북구를 대상으로 -)

  • Jeong, Gun-Sik;Kim, Han -Su
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.5
    • /
    • pp.83-90
    • /
    • 2010
  • The purpose of this study is to establish the standard of fire lane design to improve the performance of disaster prevention in local area. To accomplish it, we have focused on three research methods as below: first, we have expected disaster occurrence based on emergency tendency in local area; second, we have verified fire lane routes design through fire lane modeling and network analysis; third, we have quantitatively examined a possibility of danger of fire lanes through current road network modeling and analysis. The result of this study could be helpful to effective fire lane designs and quantitative analyses.

A Study on the Validity and Utility of Urban Plan Facilities for Prevention of Disaster (재해예방을 위한 도시계획시설의 타당성과 효용성에 관한 연구)

  • Choi, Woong;Park, Jeong Yong;Kim, Young Gyun
    • Journal of Korean Society of societal Security
    • /
    • v.4 no.1
    • /
    • pp.57-65
    • /
    • 2011
  • Studying the operation of urban control plan and control program of urban plan facilities to present development direction of urban plan in the future by performing multi-variate analysis, the research acquired the following conclusion. It is required to institutionally activate the inhabitants' participation by reflecting spontaneous participation and opinion of inhabitants to adminstration so that the effect of business can be maximized in the stage of establishing urban control plan. Furthermore, the participation of role dividing type is necessary to adjust and connect the interest of expert that has experience in practical business of overall urban plan, inhabitant and self-governing body. It is required to reduce the service supplied by government so as to enhance policy of plan-first and development last for facilities with high importance and utility such as road, park and water supply/sewage, etc as well as to seek control program that expands the participation of private sector for administration for which private service is possible.

  • PDF

플로팅 다중이용건축물 방재계획 특성에 관한 연구

  • Gang, Yeong-Hun;Do, Geun-Yeong;Lee, Han-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.10a
    • /
    • pp.300-301
    • /
    • 2012
  • 불특정 다수의 사람들이 다양한 목적으로 이용할 수 있는 플로팅 다중이용건축물 활용에 대한 요구가 점차 증가하고 있으며 관련된 다양한 계획이 시도되고 있다. 하지만 관련 사례의 부족과 법제도의 미비로 인하여 예상되는 재해에 대한 방재측면의 고려는 미비한 실정이다. 따라서 본 논문에서는 플로팅 다중이용시설에서 향후 발생할 수 있는 재해의 유형을 플로팅 다중이용건축물 특성 분석, 선박 및 건축물 재해사례 조사등을 통해 파악하였으며 특히 시설물의 안전 및 이용자의 안전에 가장 큰 영향을 미치는 화재에 대하여 계획단계에서 고려되어야 하는 방재계획 특성에 대하여 고찰하였으며 이를 통해 방재계획 기본방침을 제안하였다.

  • PDF

A Study on Expression Interpolation Algorithm of Hazard Mapping for Damaged from flood According to Real Rainfall Linkage (실측 강우 연계에 따른 호우피해예상도 표출 보간 알고리즘에 관한 연구)

  • Lim, So Mang;Yu, Wan Sik;Hwang, Eui Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.381-381
    • /
    • 2018
  • 우리나라에서는 지속적인 자연재해로 각기 다른 필요성과 목적에 따라 다양한 형태의 홍수 침수 관련 지도가 작성되어 왔다. 연구 성과로 작성된 계획 빈도 및 상위 2개 빈도의 호우피해예상도를 실측 강우와 연계하여 재난관리단계별 대응단계에 활용하기 위해 실시간 피해위험구역을 표출하고자 한다. 본 연구는 실시간으로 피해위험구역을 표출하기 위해 실측 강우와 연계된 호우피해예상도에 공간 보간 알고리즘을 적용하고자 한다. 호우피해예상도란 돌발호우나 태풍으로 인하여 홍수가 발생하면 인명 및 재산피해를 최소화하기 위해 홍수지역을 미리 예측 가능하도록 제작된 지도이다. 지형자료(DEM), 하천 중심선(Stream Centerline), 하천 횡단면(Cross-Section Line), 제방고(Bank), 수문기상 자료(Hydrological Data), 조도계수(Roughness) 등을 사용하여 하천법 제 21조와 하천법시행령 제 17조를 근거로 작성된다. 본 연구에서는 호우피해예상도에 IDW(Inverse Distance Weighted, 역거리가중법) 보간, TIN(Triangulated Irregular Network system, 불규칙삼각망) 보간, Kriging 보간 방법 적용 알고리즘을 제시하고자 하였다. 호우피해예상도에 보간 알고리즘을 적용하기 위해 보간 방법에 따른 적용사례를 분석하였으며 그 결과, 보간 알고리즘을 적용한 호우피해예상도 보간을 통하여 계획빈도 및 상위 2개 빈도 이외의 빈도(하위빈도-계획빈도, 계획빈도-상위빈도 구간)에 대한 호우피해예상도의 피해위험구역 구현 방안을 제시하였다. 호우피해예상도에 IDW, TIN, Kriging 보간 알고리즘을 적용하여 계획빈도 및 상위빈도 이외의 빈도에 대한 피해위험구역을 표출 할 수 있다. 표출된 계획빈도 및 상위빈도 이외의 빈도를 지점확률강우량-빈도에 대한 Matching table을 통하여 실측 강우와 연계 가능하다. 본 연구 결과는 추후 풍수해피해예측시스템에 활용하여 재난관리단계별 예방 및 대응 단계에 활용 할 수 있을 것으로 판단된다.

  • PDF

Development of District-level Planning Support System by using GIS (GIS를 활용한 상세계획 지원시스템의 개발)

  • 고준환;주용수
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.16 no.2
    • /
    • pp.251-258
    • /
    • 1998
  • The purpose of this study is to develop the District-level Planning Support System (DPSS) by using GIS. The district-level planning which is related for district-level control of city, needs the various parcel-level information which is composing the urban physical environment. The information has to be stored and analyzed for recognizing the study area, then the district-level planning will be efficiently managed. The use of GIS in the process of district-level planning is restricted for the creation of thematic map. GIS is not used for the analysis of spatial patterns and planning process. This study evaluates the characteristics of current district-level planning and the basic components of urban physical environment. And the database model is built. The topology among components is defined by using the spatial relationship. Then the spatial query machine for district-level planing is developed by using ArcView 3.1, Avenue and Dialog Extension. This spatial query machine is applied for case study. This study shows 1) the possibility of the district-level planning support system for analyzing spatial relationship, 2) the needs of the up-to-date topographic map showing current building's footlines and the complete integration with cadastral maps, it will reduce the uncertainty in the spatial decision making process, 3) the methodology for the construction of spatial decision making rules, 4) the further study for the using of raster, network, image and three dimension data.

  • PDF

SWMM 모형을 이용한 상습침수 지구 개선방안 연구

  • Park, Sung-Chun;Kim, Yong-Gu;Yang, Dong-Hyun;Roh, Kyong-Bum
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.264-268
    • /
    • 2011
  • 급속한 도시화 및 이상강우의 발생은 우수 량을 증가시켜 하류부의 천변주변과 저지대에 대한 침수위험을 증대시키므로 풍수해 예방을 위해 각 시 도 지자체에서는 이러한 지역을 방재지역으로 지정하여 방재대책을 수립하고 있다. 본 연구는 침수피해 위험이 높은 광영동 하광마을을 연구대상지역으로 선정하여 상습침수구역을 토대로 현장조사를 실시하였다. 현장조사에서 과거 1988년 6월 택지 조성이 준공도면과 현 주택가 침수지역 침하량 분석결과 택지조성 당시보다 대략 0.4m이상 침하가 발생한 것을 확인할 수 있었다. 또한 우수관거에 대해 침하조사를 실시하였으며, 그 결과 1998년 우수관거 정비 사업을 실시하여 현재 관거침하 및 관거유실은 발생하지 않는 것으로 조사되었다. 그러나 현재 관가 실태는 우수발생시 약간의 토사유입으로 인해 부분적으로 퇴적된 구간이 조사되었으나, 일반적인 모래 질이며 퇴적깊이는 5~15cm정도이고 이는 강우발생시 우수 관거의 일반적인 토사 퇴적 침식 작용의 현상으로 판단되었다. 외수침수는 해안도로 지반침하와 조성당시의 조위에 의한 계획 고는 적용되었으나 하천 계획홍수위의 미적용으로 인해 강우발생시 조위 상승과 하천유출과의 관계에 있어 상습침수지역의 천변 해안도로로 외수유입이 발생 하는 것으로 분석되었다. 본 연구에서는 과거 침수실적을 바탕으로 기상조건 및 조위조건 등을 고려하여 HEC-HMS모형을 적용하여 9개의 소유역으로 분할된 유역에서 홍수유출량을 분석하였으며, 외수위 조건을 SWMM모형에 적용하여 우수관거 검토를 실시하였다. 그 결과 대상구역 조위 상승으로 우수관거의 내수배제가 되지 않는 것을 확인할 수 있었다. 이러한 분석들로 외수유입 방지대책으로 조위영향 및 하천 계획홍수위를 고려하여 20년, 100년 빈도별 외수위를 산정하고 방지대책으로 도로 숭상 및 파라펫 설치방안을 검토하였다. 내수침수 방지대책으로 저류조+배수펌프+게이트펌프 또는 관로신설+게이트펌프를 설치, 복합방식 (지하저류조+승수로(도로 또는 산지)+게이트펌프장)설치, 도수터널계획 방안을 제시하여 상류지역에 발생하는 유출량을 유출부로 직접 배출하거나 침수영향이 없는 타 지역으로 연계 방류하여 총 유출량을 저감시키는 방안을 제시하였다. 이와 같은 여러 방안을 제시함으로써 관련 지자체에서는 보다 효과적인 침수방지 대책계획에 활용될 수 있을 것으로 판단된다.

  • PDF

Route Planning Considering Risk Factors Based on GIS (GIS 기반의 리스크 요인을 고려한 노선 계획)

  • Roh Tae-Ho;Jang Ho-Sik
    • International Journal of Highway Engineering
    • /
    • v.8 no.3 s.29
    • /
    • pp.1-19
    • /
    • 2006
  • Researches on method for quantitative analysis applied with decision-making in consideration of variation in risk factors based on GIS(Geographic Information System) concluded as follows. Firstly, by way of decision-making in consideration of variation in risk factors, quantitative analysis performed for the existing route was applied to the new route, which would bring about reliable criteria in route planning and basic design stage. Secondly, horizontal and vertical alignment were easily available out of GIS for relatively speedy design and analysis with three dimensional alignment by decision-making in route planning. Thirdly, automation of route alignment is possible by utilizing quantitative evaluation system established in this research so that a risk analysis can be carried out in a relatively short time. Therefore it will eventually contribute to further development of road design technology.

  • PDF

The Study on the Optimized Earthwork Transfer Path Algorithm Considering the Precluded Area of Massive Cutting and Banking (대규모 절성토 지역의 제척지를 고려한 최적화된 토량이동 경로 알고리즘 개발에 관한 연구)

  • Kang, Tae-Wook;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.1-8
    • /
    • 2011
  • The purpose of this study is to suggest the optimized transfer algorithm of earthwork considering the precluded area such as the lake, bogs. The earthwork transfer plan in massive cutting and banking should be established because of affecting the construction cost highly. Until now, there was the study about the optimized earthwork transfer model considering the OR(Operating Research). but isn't the study about the model considering the precluded area such as the lake, bogs. In most cases, the engineer adjusts the earthwork transfer path considering the precluded area, manually. The presented model suggests to calculate various visibility paths with $A^*$algorithm after converting the precluded area to polygon topology. By using this paths, the minimum cost path to optimize the earthwork transfer can be obtained. In this study, the validity of the model was proved as implementing the system for the optimized earthwork transfer considering the precluded area.