• Title/Summary/Keyword: 도로점용

Search Result 28, Processing Time 0.022 seconds

A study on the on-the-spot survey of Road occupation Information using mobile techniques (모바일 기술을 활용한 도로점용민원 현장조사 방안 연구)

  • Kim, Byung-Kon;Kim, Jin-Uk;Jeong, Seong-Yun;Kim, Young-Jin;Kim, Tae-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.832-835
    • /
    • 2007
  • The purpose of this study is to suggest the on-the-spot survey method of road occupation information. The on-the-spot survey method is proposed through the analysis of information searching function, document and process. The decision of road occupation permission and the grasp of illegal occupation status are closely connected with national rights and interests. To keep the road occupation permission and illegal occupation status, the easy acquisition of road occupation information is very important. But the person in charge of road occupation have a difficulty in obtaining occupation information because that information is still managed by paper drawing. Accordingly. this study develop the on-the-spot survey tool of road occupation using the occupation information that is managed by Construction Authorization & Permission System and the mobile techniques like UMPC. As the result of this study. the efficiency on the authorization. permission. and public grievance of construction project has improved

  • PDF

A Study on the Diagnosis and Improvement of the Road Work Zone (도로점용공사장 교통관리방안의 문제점 및 개선방안 (서울시를 중심으로))

  • 김종민;이상용
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.5
    • /
    • pp.119-133
    • /
    • 2003
  • 도로는 교통기능 외에 여러 시설물을 수용할 수 있는 사회 인프라구축의 공간으로 활용될 수 있기 때문에 서울시뿐만 아니라 각 지방자치단체에서는 이러한 공간을 활용하기 위한 도로점용공사는 매년 전국적으로 수만 건에 달하고 있다. 따라서. 매년 발생하는 도로점용공사의 차로과다 점용, 교통시설물 설치 부적절, 보행자 안전무시, 공사안내표지 부적절, 공사구간에서의 불법 주.정차 등의 문제점이 계속하여 발생.지적되고 있으나 이에 따른 관련 규정이 미흡하여 도로점용공사 시행자의 불법을 초래하고 있는 실정이다. 또한 서울시의 경우 시스템적 접근방법인 관련조례에 의해서 수행되기보다는, 교통자문회의로 운영되고 있으며, 관련 인원 및 법적 제재조치가 미약하여 도로점용공사의 효과적인 관리가 어려운 실정이다. 따라서 서울시 및 각 지방자치단체에서는 도로점용공사로 인한 보행자와 운전자의 통행권 확보와 안전상의 문제 등을 하루빨리 인식하여 도로점용공사에 따른 도로공사장 교통관리 규정을 법규화 하여 체계적으로 관리할 필요가 있다. 이에 따라, 본 논문에서는 도로점용공사에 따른 관련법 및 적용대상, 관련보고서 검토, 서울시를 사례로 한 공사중 교통처리방안 운영실태 및 문제점의 진단을 통하여 향후 도로공사장 교통관리 규정의 운영적 및 제도적 측면의 개선방안과 향후 추진방향을 제시하고자 한다.

An application on tools for on-the-spot inspection of road occupation information (모바일 장비를 이용한 도로점용정보 현장점검도구 적용)

  • Young-Jin Kim;Byung-Kon Kim;Jin-Uk Kim;Tae-Hak Kim
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.718-721
    • /
    • 2008
  • 본 연구에서는 도로점용업무 현장점검 시 종이서류를 지참하는 등의 애로사항을 해결하기 위해, GIS 맵 정보와 UMPC, RFID 등 모바일기기를 이용하여 현장에서 활용할 수 있는 도구를 개발하여 적용하였다. 도로점용업무는 불법점용물 관리, 도로점용 허가신청에 관한 현장조사를 통해 적부여부 판단 등 현장 업무가 많음에도 불구하고, 기존 정보들이 종이로 관리되며 현장점검 체크리스트 작성 등이 수기로 이루어짐에 따라 시간 등 많은 비용이 소요되고 있다. 이러한 작업 중 점용물의 허가 적부 여부관리에 모바일 장비를 이용한 도로점용정보 현장점검도구 적용을 통해 현장조사 및 업무보고의 효율적 관리가 가능하다. 이에 본 논문에서는 GIS 맵 정보 및 건설인허가시스템에서 관리하는 도로점용정보와 UMPC 등 모바일 기기를 활용하여 도로점용업무의 효율성을 높였다.

A Study on a Information Classification System for the Road Occupation System Development (도로점용시스템 개발을 위한 정보분류체계 연구)

  • Kim, Young-Jin;Kim, Byung-Kon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1405-1408
    • /
    • 2011
  • 도로의 일부구역을 일반시민이 특정목적으로 사용하기 위한 도로점용허가는 국민생활 및 재산권과 밀접한 관계가 있으나 설계도 등 구비서류가 다양하고 복잡하여 민원인이 신청하기에 불편하고, 이는 곧 민원행정에 대한 국민 신뢰도 저하로 이어지고 있다. 도로점용허가는 서류가 대부분 종이로 제출되어 보관 및 자료찾기 등 사후관리가 어렵고 민원 대응 등 업무처리가 힘들어 행정효율성 저하를 초래하고 있다. 본 연구는 도로점용허가 전반을 지원할 수 있는 온라인시스템(이하 '도로점용시스템'이라함)을 구축하기 위한 정보분류체계를 개발하여 대국민 서비스 및 업무효율성 향상을 도모하고자 한다.

A Study on the Development of the System for the Road Occupation Permit Information Management (도로점용허가 정보관리를 위한 도로점용시스템 개발에 관한 연구)

  • Kim, Young-Jin;Kim, Byung-Kon;Jeong, Seong-Yun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6495-6503
    • /
    • 2013
  • This paper presents a study on the development of a web-based system for the road occupation permit information management. For the development of this system, the survey of information system related to a road occupation permit, an analysis of road occupation business process, the definition of the road occupation permit data, the development of the system, and the application of the system to the work-related to road occupation permit were conducted consecutively. In an analysis of the road occupation business process, the statutes, such as the road act were investigated, work examples of the road management agent were reviewed, and a survey targeting staff and citizens was carried out. The information classification code to represent the attributes of the data was developed to manage the information in each road occupation permit process, and the metadata was defined considering the hierarchy relationship of the information. The road occupation and access system was developed based on the information classification code and metadata to reflect the user requirements. The System was applied to the Regional Construction and Management Administration and Branch Office belonging to the Ministry of Land, Infrastructure and Transport Affairs. By replacing the business process based on paper documents to the business process based on the information system, it is expected that the service of the civil petition be upgraded and the business process of the road occupation permit be reformed.

자료

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.2 s.167
    • /
    • pp.88-96
    • /
    • 1983
  • PDF

The Proper Length of Transition Area for Work Zones on Urban Freeways (도시고속도로 공사구간의 적정 완화구간 길이 산정)

  • Lee, Mi Ri;Lee, Chungwon;Kim, Do-Gyeong
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.4
    • /
    • pp.58-66
    • /
    • 2013
  • Due to the characteristics of urban freeways such as heavy traffic and high speed, work zone on urban freeways causes the increase of not only the likelihood of crash occurrence but also traffic congestion caused by lane drop, lane change, acceleration/deceleration, and etc. This paper aims to determine the proper length of transition area that satisfies two criteria, mobility and safety, to make the operation of work zone more efficient. For the analysis, three different scenarios were developed by the number of lanes and the proper length of transition area were determined by changing the length from 100m to 500m in 100m increments. The results showed that the proper length of transition area for 3- and 4-lane freeways is 300m, whereas the proper length of 2-lane freeways is 200m. The results indicated that the different length of transition area based on the number of lanes is more desirable and efficient.

Development of Saturation Flow Rate Estimation Models Considering Workzone in the Vicinity of Signalized Intersections (도시부 신호교차로 인근 도로점용공사를 고려한 포화교통류율 산정모형 개발에 관한 연구)

  • Eo, Hyo-Gyeong;Sin, Chi-Hyeon
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.6
    • /
    • pp.109-120
    • /
    • 2010
  • This study aims to develop mathematical models for estimating saturation flow rates at the stop line of signalized intersection due to Workzones in the vicinity, since the saturation flow rate is the most critical parameter in capacity analysis for signalized intersections. It was found by reference review that saturation flow rates are sensitively influenced by the location of Workzone, the number of lanes, cycle length and effective green time. Extensive microscopic simulation runs were also performed and compared to the those of mathematical models for model verification. Mathematical models were developed based on traffic flow theory and dualizing them by the location of workzones. And then each result produced by changing important parameter values was carefully examined and analyzed. Small but consistent differences in saturation flow rate values between mathematical models and simulations exist. However, the pattern of changes in saturation flow rates depending on each variable was similar.