• Title/Summary/Keyword: 도로설계기준

Search Result 627, Processing Time 0.021 seconds

Seismic Performance Evaluation of RC Bridge Piers with Limited Ductility by the Pseudo-Dynamic Test (한정연성 철근콘크리트 교각의 유사동적 실험에 의한 내진 성능 평가)

  • Chung, Young-Soo;Park, Chang-Kyu;Park, Jin-Young
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.5
    • /
    • pp.705-714
    • /
    • 2003
  • Even though Korean peninsula is located in regions of moderate seismic risks, current seismic design provisions of the roadway bridge design code have adopted the AASHTO code which is based on the requirements for high seismic regions. The objective of this research is to investigate the seismic performance of circular reinforced concrete (RC) bridge piers with limited ductility, which may be desirable in low or moderate seismic regions, such as in Korea. Four test specimens were designed and constructed. The reference specimen was designed with longitudinal steel ratio as 1.01% and the confinement reinforcement ratio as 0.13% without considering earthquake, and three other test specimens were designed in accordance with a limited-ductility concept as 0.3% for the confinement steel ratio. This confinement ratio is 0.32 times of minimum lateral reinforcement specified in current seismic design provisions, and 2.3 times of lateral reinforcement required in nonseismic design provisions. The pseudo-dynamic test was carried out to evaluate the seismic performance of full-scale specimens in size of 1.2m diameter and 4.8m height. Judging from the experiment, the reference specimen was not satisfactory for the demand displacement ductility ${\mu}$=5.0, but three limited-ductility specimens appeared to have the displacement ductility of more than 5.

Minimum Design Thickness of Prestressed Concrete Deck Slabs for Composite Two-Girder Bridges (강합성 2거더교 프리스트레스트 바닥판의 설계 최소두께)

  • Hwang, Hoon Hee;Joh, Changbin;Kwark, Jong Won;Lee, Yong Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.183-190
    • /
    • 2006
  • Minimizing the self weight of long-span deck slabs is one of the key factors for the practical and economic design of a composite two-girder bridge. In this paper, the minimum design thickness and rebar details of prestressed concrete deck slabs for composite two-girder bridges with girder span length from 4 m to 12 m are studied based on the safety and serviceability. The bridge deck slab with minimum thickness is designed as a one-way slab considering orthotropic behavior. Then fatigue safety of the deck slab is examined. Serviceability requirements for the deck slab such as deflection and crack width limits are also examined. The result shows that rebars with diameter less than 16 mm is recommended for the improved fatigue behavior, and, for the deck slab with span length longer than 8 m, the deflection limit governs the minimum design thickness. The result also shows that, for the deck slab with span length longer than 4 m, the distribution rebar requirement in the current Korea Highway Bridge Design Code is not sufficient to maintain the structural continuity in bridge axis as expected from the deck slab with span length shorter than 3 m.

Shear Experiments on Concrete Filled PHC Pile with Composite Shear Connectors with Rebar Holes (보강 철근 정착 홀을 갖는 합성 전단연결재를 적용한 콘크리트 충전 PHC말뚝의 전단성능 평가)

  • Kim, Jeong-Hoi;Park, Young-Shik;Min, Chang-Shik
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.3
    • /
    • pp.259-266
    • /
    • 2017
  • The purpose of this study was to contribute to the field application cost effectively and reasonably by developing the functional piles that reinforces shear force. CFP pile (Concrete Filled Pretensioned Spun High Strength Concrete Pile with Ring type Composite shear connectors) developed in this study increases the shear stress by placing composite shear connector and filling the concrete into hollow part of the pile. By placing the reinforcement (H13-8ea) and the reinforcement (H19-8ea) into hollow section inside of PHC piles, it also improves the shear strength due to increasing steel ratio. It reinforces shear strength effectively by dowel force that is generated by putting reinforcement (H13-8) into the holes of composite shear connectors for the composite behavior of filled concrete and PHC pile. The study was reviewed and compared the calculated result of the shear strength by limit state design method highway bridge design standards (2012) and experiment result of the shear strength by KS F 4306. We can design the shear strength reasonably as the safety ratio of 2.20, 2.15, 2.05 is shown comparing to design shear strength, according to design shear strength on each cross sections and the experiment results of the CFP pile.

The Influence of Traffic Islands on Pedestrian Safety (교통섬 설치가 보행자 교통사고에 미치는 영향 연구)

  • Lee, Su-Beom;Kim, Myeong-Suk;Jang, Il-Jun;Kim, Jang-Uk
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.2
    • /
    • pp.107-115
    • /
    • 2009
  • Traffic islands were introduced for drivers and pedestrians to use the road in a safe and orderly way and were also a specified zone between traffic lanes to divide conflicting traffic flows and to provide pedestrian refuge. However, existing research and relevant standards described its purpose and effects only but not a safety standard to decide whether the traffic island warranted. This study was to introduce a parameter which had a high relationship with accidents by analyzing road and traffic conditions and traffic accident data at urban intersections. Based on the relationship between the parameter and the traffic accidents at the intersection, a pedestrian accident probability model was made by using a logit model. In addition, the study reviewed a pedestrian accident probability corresponding to traffic volume and size of the intersection during design of the intersection and then suggested the effectiveness of the traffic island in terms of traffic safety. In conclusion, when a large-scale intersection has significant traffic volumes, a high probability of traffic island-induced pedestrian accidents appears, while in the case of small volumes, the probability is low. Targeted design and operations of a traffic islands is necessary, because its introduction itself does not enhance pedestrian safety in all cases at all intersections. This study can be a useful reference for further development to set up a scheme of the traffic islands in terms of traffic safety.

Improvement of the HCM Delay Estimation Model for Exclusive Permitted Left Turns (비보호 좌회전 지체도 추정모형의 개선)

  • 김진태
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.2
    • /
    • pp.107-118
    • /
    • 2003
  • Highway Capacity Manual (HCM) provides an analytical delay estimation model to assist the evaluation of traffic at a signalized intersection. The model revised and included in the HCM published in the year 2000 reflects the results of recent studies and is utilized in various fields of transportation studies. For the implementation of the model in the case of permitted left turns, the HCM supplement provides a computational procedure to adjust the saturation flow rate of permitted left toms. The model however, is originally designed for a protected movement and thus underestimates the delay of permitted left turns due to its difference right-of-way nature. This document describes (1) a review of the theoretical background of the HCM delay estimation model, (2) problems embedded in the model for the delay estimation of permitted left turns, (3) a proposed model developed in this study to improve the delay estimation for permitted left turns and (4) a set of verification tests. In order to reflect various traffic and control conditions in the test, simulation studies were performed to by using the field data based on 120 different permitted left-turn scenarios. Comparison studies conducted between sets of delays estimated by the HCM and the proposed models against a set of the CORSIM delays and showed that the proposed model improved the estimation of the permitted left-turn delays. The explanatory variable of the relationship between the HCM delay and the simulation delay was 0.47 and the one between the delay estimated by the proposed model and the simulation delay was 0.77.

Estimation of Design Wind Speed Compatible for Long-span Bridge in Western and Southern Sea (서남해안 장대교량에 적합한 설계 풍속 산정)

  • Kim, Han Soo;Lee, Hyun Ho;Cho, Doo Young;Park, Sun Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.153-160
    • /
    • 2011
  • Recently there are many long span cable supported bridges like Cable Stayed Bridge and Suspension Bridge already constructed or planned. Reconsidering of proper design wind load of long span bridge is required since the meteorological value based on the data only from 1960s to 1995 has been used when we estimate the wind load for designing long span bridges. In this paper, the research area was confined to western and southern coasts where many long span bridges have constructed. The method of moment and the least-squares method were used to estimate the expected wind speeds of 100 year's return period for girder bridges and for 200 year's return period for long span bridges based on the Gumbel's distribution. As the return-period wind speed on the land face was revised because of recent high speed velocity, the revised return-period wind speed is increased by 17%. Compatibility of return-period wind speed was also evaluated using RMS (Root Mean Square) error method. Aa a result of this paper, the least-squares method is more compatible than the method of moment in the case of western and southern coasts in Korea.

A Comparison Study of Direct Impact Analysis of Vehicle to Concrete Pier and In-Direct Impact Analysis using Load-Time History Functions (차량과 콘크리트 교각의 직접충돌해석법과 충돌하중이력곡선을 이용한 간접충돌해석법 비교연구)

  • Kim, WooSeok;Kim, Kyeongjin;Lee, Jaeha
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.6
    • /
    • pp.533-542
    • /
    • 2014
  • In design standards such as AASHTO LRFD and Korea Highway Bridge Design, the dynamic behaviors under the impact loading has not been considered and it recommends of using a static force for designing bridge column against vehicle collisions. Accordingly, in this study, models of vehicle collisions to concrete bridge column were developed with various boundary conditions in order to take into account dynamic behaviour of the column. Cargo trucks of 10tons, 16tons and 38tons were selected and a typical type of concrete bridge pier column along the Kyungbu highway in Korea was selected for this study. Results from this study indicate that the static load specified in the design standards are too small compared to results obtained in this study. It was also found that a consideration of the bridge superstructure allowed smaller damages of concrete bridge pier column under truck impact loadings. Furthermore, a comparison study of direct impact analysis of vehicle to bridge-column with in-direct impact analysis using load-time history functions was performed. The in-direct impact analysis shows that the use of load-time history graph improves the computational cost up to 92% and predict the behaviors of the bridge column under the impact loadings well. The obtained load-time history graph could be easily applied to several existing models.

A study on the design of tunnel lining insulation based on measurement of temperature in tunnel (터널 온도계측을 통한 라이닝 단열 설계에 관한 연구)

  • Kim, Dea-Young;Lee, Hong-Sung;Sim, Bo-Kyoung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.4
    • /
    • pp.319-345
    • /
    • 2011
  • In case of tunnels in cold regions, a freeze of groundwater around tunnel may act as a barrier of tunnel drainage in winter, or may cause the inner extrusion of lining. In spite of that, a design of insulation for preventing the frost damage of tunnel lining has not been introduced in Korea, while foreign countries such as Norway and so on have a standard on insulation. In this study, a few freezing cases of road tunnels have been reviewed, and the results show that the freezing protection is necessary. In order to characterize the thermal distribution in the tunnel, following measurements have been performed at Hwa-ak tunnel; the temperature distribution by longitudinal lengths, the internal temperature of lining and the temperature distribution of the ground under pavement. From these measurements, the characteristics of the tunnel's internal temperature distribution due to temperature change in the air has been analyzed. Based on the measurement results on the temperature distribution at Hwa-ak tunnel, thermal flow tests on the rock specimen with and without insulation have been performed in the artificial climate chamber to investigate the performance of the insulation. Also, a number of 3D numerical analyses have been performed to propose appropriate insulation and insulation thicknesses for different conditions, which could prevent the frost damage of tunnel lining. As a result of the numerical analysis, air freezing index of 291$^{\circ}C{\cdot}$ Hr has been suggested as the threshold value for freezing criteria of groundwater behind the tunnel lining.

A Study on the Improvement of 3D Slope Modeling for BIM Designing Site Construction (택지조성공사 BIM을 위한 비탈면 3차원 모델링 효율화 방안에 관한 연구)

  • Kwon, Yongkyu;Ha, Dahyun;Kim, Jeonghwan;Seo, Joonwon;Shim, Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.29-40
    • /
    • 2021
  • Recently, interest in Building Information Modeling (BIM) has increased globally, and 3D modeling is a start for the application of BIM at construction sites. However, while many studies have been conducted on the efficiency of 3D modeling focused on civil facilities, there is a lack of research on the earthwork BIM. In particular, since 3D slope often has complex shapes depending on the ground models, the efficiency method for 3D slope are needed. This study analyzed the interfaces and procedures of other software to find out what functions users need. Then the functions to enter intervals between 3D faces, select multiple ground models, and improve the interface are reflected on the developed system and is able to efficiently perform modeling with only five steps, and reduce the number of clicks and inputs. As a result of conducting the test to verify the efficiency, using the developed system made skilled users complete modeling at least 1.8 times faster and unskilled people at least 2.4 times faster than using other software. This is expected to perform 3D slope modeling more efficiently, as well as to contribute to the activation of future BIM adoption for housing construction projects.

Light Pollution Survey of Outdoor Lighting in Shopping Complex (쇼핑용 복합빌딩의 옥외조명으로 인한 광공해발생 실태조사)

  • Ahn, Hyun-Tae;Kim, Jeong-Tai
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.5
    • /
    • pp.16-26
    • /
    • 2004
  • As the importance of outdoor lighting become more widely recognized, outdoor lighting has been installed in many buildings, plazas, landscape, and historical monuments in Korea, Outdoor lighting on showing complex, in particular, express its values as local landmarks. However, the excessive outdoor lighting in the large-scale shopping complex tends to cause light pollution. Many advanced countries are trying to create a comfortable lighting environment by the guidlines and regulations on outdoor lighting to prevent light pollution. For this research backgrounds, the light pollution of three showing complexes in Seoul have been investigated. For the purpose, luminance of building facade, horizontal illuminance, and vertical illuminance were measured with proper measurement instruments and compared the results with the CIE recommendations. The results of the study are as follows. As no cut-off luminaries are currently installed on pedestrian walks, some glare were occured partially. It also shows that the luminance of building facades are high to improve the degree of public awareness of buildings and advertisements. In other words, the luminance of the building facade, when compared with that of the CIE recommendations, is twice as high and the vatical illuminance of pedestrian walks is far higher than that of the CIE recommendations, which proves the existence of light pollution. As Korea has not yet provided proper regulations or guidelines for the control of light pollution, it is necessary to make appropriate codes for it.