• Title/Summary/Keyword: 더블 사이클

Search Result 7, Processing Time 0.023 seconds

Efficient Yard Operation for the Dual Cycling in Container Terminal (컨테이너 터미널의 효율적인 듀얼 사이클을 위한 야드 운영)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.35 no.1
    • /
    • pp.71-76
    • /
    • 2011
  • Recently, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for increasing the productivity of quay side. If, however, we make an experiment on dual cycle operation in a real job site, the efficiency is poor up to terminal operation method as YTs(Yard Tractors)' allocation method, QCs(Quay Cranes)' working speed, and position of export containers. Especially, using the existing yard operation method, it is difficult to support to dual and double cycle operation. Therefore, this paper examine more efficient terminal operation method, when terminal uses dual cycle operation. We developed a simulation model using simulation analysis software, Arena.

Conatiner Terminal Operation Method for the Efficient Dual Cycle Operation (효율적인 듀얼 사이클을 위한 터미널 운영방법)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2010.10a
    • /
    • pp.110-111
    • /
    • 2010
  • Recently, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for increasing the productivity of quay side. However, if we make an experiment on dual cycle operation in a real job site, the efficiency is poor up to terminal operation method as YTs(Yard Tractors)' allocation method, QCs(Quay Cranes)' working speed, and position of export containers. So, this paper examine more efficient terminal operation method, when terminal uses dual cycle operation.

  • PDF

Efficient Yard Tractor Control Systems for the Dual Cycling (효율적인 듀얼 사이클을 위한 야드 트랙터 통제 시스템)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.11a
    • /
    • pp.170-171
    • /
    • 2011
  • Recently, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for increasing the productivity of quay side. If, however, we make an experiment on dual cycle operation in a real job site, the efficiency is poor up to terminal operation method as YTs(Yard Tractors)' allocation method, QCs(Quay Cranes)' working speed, and position of export containers. Especially, using the existing yard operation method, it is difficult to support to dual and double cycle operation. Therefore, this paper examine more efficient terminal operation method, when terminal uses dual cycle operation. We developed a simulation model using simulation analysis software, Arena.

  • PDF

Efficient Yard Tractor Control Method for the Dual Cycling in Container Terminal (효율적인 듀얼 사이클을 위한 야드 트랙터 통제 방법)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.36 no.1
    • /
    • pp.69-74
    • /
    • 2012
  • Recent global supply chain, improving the efficiency of container shipping process is very important. In the overseas shipping of goods, the voyage of super containership is common to overcome amount of increasing cargo. Thus, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for maximizing the productivity of quay side. Yard Tractors(YTs) pooling methods also are introduced for increasing the efficiency of assignment of YTs. In this paper, we analyzed the efficiency of dual cycling through comparing existing pooling methods with the modified method for the dual cycling. We developed a simulation model using simulation analysis software, Arena. The result of experiment shown that the more dual cycling don't always increase the gross crane rate(GCR), which means productivity of quay cranes(QCs) per hour.

Quay Crane Dual-cycle Plan considering Yard Tractor waiting time (야드 트랙터 대기시간을 고려한 크레인 듀얼 사이클 계획)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.10a
    • /
    • pp.220-221
    • /
    • 2009
  • One of the important performance measure for productivity at container terminals is the working productivity in the quay. working scheduling of quay cranes (QCs) gives a significant impact on the quay working productivity. The recent managers of the terminals pay high interests in equipment investment and operation methods with a new concept in order to enhance the quay working productivity. The double cycle or dual cycle, which is a method to increase the quay productivity with no application of new equipment, but with the change of operations, has been received strong attention in academic research. The majority of studies until this time has been realized the quay work as the bottleneck and focused on those works. However, if the QCs do notver, it the Cs d-trotver,(CT) if t the Cs, there would be the pos ibilf tes that the effectiveness of them is decreasedveaused by the longer, if t the Cs. Thus, this paper, suggests the solutions on the con th scheduling for the dual cycle operation considering the YT.

  • PDF

Dual Cycle Plan for Efficient Ship Loading and Unloading in Container Terminals (컨테이너 터미널의 효율적인 선적 작업을 위한 Dual Cycle 계획)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.33 no.8
    • /
    • pp.555-562
    • /
    • 2009
  • At container terminals, a major measurement of productivity can be work-efficiency in quay-side. At the apron, containers are loaded onto the ship and unloaded to apron by Q/C(Quay Crane). For improving the productivity of quay crane, the more efficient Y/T(Yard Tractor) operation method is necessary in container terminals. Between quay-side and yard area, current transferring methods is single-cycling which doesn't start loading unless it finishes unloading. Dual-cycling is a technique that can be used to improve the productivity of quay-side and utility of yard tractor by ship loading and unloading simultaneously. Using the dual-cycling at terminals only necessitates an operational change without purchasing extra equipment. Exactly, Y/T operation method has to be changed the dedicate system to pooling system. This paper presents an efficient ship loading and unloading plan in container terminals, which use the dual-cycling. We propose genetic and tabu search algorithm for this problem.

The Effect Analysis on the Container Terminal Productivity according to Combination of YT Pooling and Dispatching Rules (이송장비 풀링(Pooling)과 우선순위 규칙(Dispatching rule) 조합에 따른 컨테이너 터미널 생산성 효과분석)

  • Chun, Seoyoung;Yoon, SungWook;Jeong, Sukjae
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.3
    • /
    • pp.25-40
    • /
    • 2019
  • Today, container terminals are fiercely competing to attract an increasing number of containers. As a way to improve terminal productivity, this study proposes two dispatching rules for yard truck allocation priorities. First, Multi-Attribute Dispatching Rule(MADR) is an allocation method to calculate the weighted sum of multiple factors affecting container terminal productivity and priority them. Especially, the workload of the quay crane was considered one of the factors to reduce the residence time of the ship. Second, Cycling Dispatching Rule(CDR) is the effective way to increase the number of double cycles that directly affect terminal productivity. To identify the effects of combinations of pooling and dispatching, a comparative experiments was performed on 8 scenarios that combined them. A simulation environment has been developed for experiments and the results have demonstrated that the combination of terminal level pooling and Multi-attribute Dispatching could be an excellent combination in KPIs consisting of GCR and delayed departure of ships, etc.