In the present study, the prediction methods of the crest settlement after impounding and the maximum internal settlement during dam construction were proposed through the analysis on settlement data at 38 monitored points of 36 Concrete-Faced Rockfill Dams (CFRDs). The results from this analysis provided that the crest settlement and the maximum internal settlement are increased in proportion to the dam height and the void ratio. However, the relationship between internal settlement and dam height for each void-ratio range plotted in semi-logarithmic scale is the nearly same. Also, the prediction of the crest settlement of the CFRD is possible through the maximum internal settlement during dam construction. In addition, it seems that the valley shape highly affects the dense dam body with high construction modulus. The results of this study will provide the useful tool for the design, construction and management of CFRDs.
Seepage analysis through unsaturated zone based on the theory of unsaturated flow is commonly performed to evaluate dam safety. However, the concepts of unsaturated soil behavior have not been transferred into the hands of practicing geotechnical engineers since the problems involving unsaturated soils often have the appearances of being extremely complex. The behavior of dam such as seepage rate and the pore water pressure distribution is different according to the unsaturated hydraulic properties, but nevertheless simply assumed properties have been used due to insufficient data from domestic soils. In this paper, the effect of unsaturated hydraulic properties on the behavior of dam was studied through a series of numerical analyses, and then the results were discussed. It is observed that water table moves at a (aster rate, as the values of unsaturated soil parameter a and n increase. The value of m showed opposite trend. The sensitivity calculated using the approximation form showed maximum values near the water table. And the value of n that is related to the slope of soil water characteristic curve gives greatest influence on the change of sensitivity with time.
Using 2D numerical analysis that covers the largest section of the dam body, a process is generally performed when evaluating its stability against seepage. The quantity of seepage is first obtained by assuming that its bottom topography is in the simple form of a rectangle, it is then calculated by reflecting its sectional shape during this process of analyzing the seepage quantity. Considering that various forms of dams are being constructed on various types of ground, thanks to more recent technological advances, it is judged more appropriate to draw a conclusion by means of the results on reflecting the realistic shape and topographical conditions of the dam body through 3D numerical analysis. Therefore, this study intends to present a method designed to carry out safety management by evaluating the correct quantity of water leakage that passes only through the dam body, having excluded other factors that include the amount of rainfall through the 3D FEM analysis.
Jong Wook Lee;Geun Soo Lee;Seong Bae Jo;Nam Ryong Kim;Jeong Yeul Lim
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.83-83
/
2023
댐의 침투수량은 준공이후 댐 안전성 확보를 나타내는 지표 중의 하나이며, 유지관리를 위해 침투수량 측정을 실시하여 관리를 하고 있다. 댐 타입별로 침투수량에 대한 허용치와 관리기준치는 다르지만, 기본적으로 댐에서 발생되는 침투수량은 측정범위를 넘지 않도록 관리를 하고 있다. 댐의 침투수량 측정은 댐 하류에 누수집수벽을 설치하고 댐에서 발생되는 침투수량을 집수한 후 삼각위어를 통하여 침투수량을 측정하고 있다. 이러한 침투수량 측정은 대부분의 댐에서 실시간으로 자동측정하고 있지만, 경우에 따라 미계측 구간이 발생되어 댐 유지관리 측면에서 미계측에 대한 원인분석이 필요한 실정이다. 일반적으로 침투수량의 미계측 원인은 계측기기, 삼각위어, 누수집수벽, 기초지반 등 다양한 원인이 있지만 명확한 원인을 찾기는 어려움이 많다. 특히, 댐 침투수량의 경우 지하수위, 댐 표면 우수, 침투수가 같이 측정되기 때문에 원인분석을 위해서는 다양한 검토가 필요하다. 본 연구의 표면차수벽형석괴댐은 누수집수벽을 통하여 침투수량을 측정하고 있으나, 일부 구간 미계측 부분이 발생하여 기초지반, 댐체 하류사면, 여수로와 댐체 접합부를 통한 누수를 원인으로 추정하였다. 이를 조사하기 위하여 전기비저항 탐사, 시추조사, 수압시험, 지하수위 측정 결과를 이용하여 누수발생 추정위치를 찾고, 침투수량이 미계측되는 원인을 분석하고자 하였다. 전기비저항 탐사는 여수로 접합부, 누수집수벽 상·하류 구간을 선정하여 측정한 결과 상·하류 저비저항대가 존재하는 구간을 추정할 수 있었다. 수압시험 결과 기초암반은 2.3 ~ 21.3 Lu(3.65×10-5 ~ 3.65×10-4 cm/sec)의 범위로 누수 가능성이 있는 높은 투수성을 갖는 부분을 확인할 수 있었다. 전기비저항 탐사, 수압시험, 지하수위 측정을 통해 누수집수벽 기초지반 누수발생 원인분석 결과 누수집수벽 기초암반을 통한 누수로 누수집수벽에 댐체를 통한 침투수량이 저류되지 못하는 현상이 발생하기 때문인 것으로 판단되었다. 침투수량계의 정상화를 위해서는 조사를 통해 확인된 누수집수벽 기초암반 누수구간의 그라우팅 보수보강이 필요함을 확인하였다.
Proceedings of the Korea Water Resources Association Conference
/
2022.05a
/
pp.214-214
/
2022
감포댐은 2006년 준공하여 각종 시설 및 설비의 노후화가 진행중에 있으며, 최근 감포댐 인근 지역에서 발생한 경주지진(규모 5.8) 및 포항지진(규모 5.4)이 발생하여 지진시 시설물의 안전성에 대해 중요성이 대두되고 있었다. 이에 감포댐 안전성강화 사업을 추진하게 되었고, 주요 사업내용은 취수탑 관리교 내진보강, 댐체 심벽보강을 통한 댐체 안전성확보, 비상방류시설 개선이다. 취수탑 관리교는 교각단면의 변위연성도 및 교량받침에 의한 구조물 안전성 평가를 시행하였고, 단면강도는 모멘트-곡률해석법에서 탄성영역의 단면강도 대비 탄성지진력을 비교하여 안전성을 검토하였다. 검토결과 교량받침의 내진성능은 부족한 것으로 검토되어 유량제어형 멀티펌프와 안전잭을 이용한 변위제어 방식의 교량동시 인상공법이 가능하고 인상정밀도 ±0.5mm이내의 성능을 가진 교량인상공법 적용하여 보강을 하는 것으로 계획하였다. 댐체 심벽보강을 위해 먼저 전기비저항탐사를 수행하여 전기비저항대를 탐사하여 심벽부에서 포화대가 형성된 부위를 조사하였다. 그리고 댐 상·하류에 전극을 설치하고 전류를 발생시켜 측정 지점별 자기장을 측정을 통하여 댐체내 침투에 따른 유로 형성여부 파악을 위한 전자기장탐사를 시행하였다. 마지막으로 심벽 시추조사를 시행하여 공내수를 조사하였다. 조사결과 포화대의 위치 및 이상대가 다양한 것으로 나타났으며, 이는 불특정 지점에 연약대가 존재한다 판단하여 심벽부 보강계획을 전반적으로 적용하는 것으로 결정하였다. 비상방류시설은 최근 15년 실측자료의 홍수기(6~9월) 평균유입량을 적용하여 검토하였으며 검토결과 배제대상 높이 75%까지는 3.7일, 완전배제까지는 11.2일이 걸려 댐설계기준을 충족하는 것으로 검토되다. 다만 감포댐 비상방류시설이 하천제방과 직각방향으로 형성되어 있고, 하천의 폭이 좁아 과거 방류시에도 제방을 월류하는 것으로 조사되어 하천의 세굴을 방지하고 제방 안전성을 확보하기 위하여 비상방류시설에 감세공을 설치하고, 제방에 디플렉터 옹벽을 설치하는 것으로 계획하였다. 감세공은 2번에 걸친 감세효과로 방류시 하류바닥 및 옹벽 보호 효과가 큰 미국 USBR의 TypeVI를 적용하였으며, Flow-3D 모델링을 통하여 제방에 월류가 발생하지 않는 최적의 대안 옹벽규모를 산정하였다.
Journal of the Earthquake Engineering Society of Korea
/
v.14
no.3
/
pp.11-22
/
2010
An analysis method is proposed for the transient linear or nonlinear analysis of dynamic interactions between a flexible dam body and reservoir impounding compressible water under earthquake loadings. The coupled dam-reservoir system consists of three substructures: (1) a dam body with linear or nonlinear behavior; (2) a semi-infinite fluid region with constant depth; and (3) an irregular fluid region between the dam body and far field. The dam body is modeled with linear and/or nonlinear finite elements. The far field is formulated as a displacement-based transmitting boundary in the frequency domain that can radiate energy into infinity. Then the transmitting boundary is transformed for the direct coupling in the time domain. The near field region is modeled as a compressible fluid contained between two substructures. The developed method is verified and applied to various earthquake response analyses of dam-reservoir systems. Also, the method is applied to a nonlinear analysis of a concrete gravity dam. The results show the location and severity of damage demonstrating the applicability to the seismic evaluation of existing and new dams.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.27
no.1
/
pp.645-655
/
2009
Deformations of the dam have been monitored by control points buried in the upper and lower dam of Samrangjin pumped storage power plant. The horizontal and vertical deformation observations performed in 1997, 2002, 2007 are to identity movements of the dam body by comparing and analyzing control points. For that reason, it was difficult to analyze movements of the dam in detail. Therefore, this research has observed surface of the dam using terrestrial laser scanner and estimate movements of the dam by comparing and analyzing scanned and designed surfaces of the dam since building completion. Vertical deformation of upper dam took place in the middle of ridge of dam, maximum cross section, up to 1.5m. In the middle and middle bottom of the downstream slope, vertical deformation was produced 0.75m around SP4-2 point and 0.5m around SP4-4 point. The maximum subsidence of vertical deformation in the lower dam took place in the middle of ridge of dam and upper part of upstream slope and subsidence was analyzed from -0.4 to -1.0m respectively. The result of this research can be used as initial observation to analyze whole movement of the dam in the future.
Dam movements are identified in real-time with measuring instruments for dam maintenance. However, for dams that have aged, the measuring instruments that were installed during the dam construction are frequently malfunctioning or completely failing altogether. Precision safety diagnosis is being executed for dams that are national facilities Type 1. During the diagnosis, a safety assessment is conducted for the dam body. Normally, during the analysis of dam safety, the widest cross-section is selected and a two-dimensional numerical analysis is taken place for the cross-section. However, numerous researchers have recently looked into applying the 3-dimensional numerical analysis program developments to precisely analyze the structure of the dam, as well as the surrounding strata, and the lower dam strata. In this study, PLAXIS 3D, a geotechnical generic FEM analysis program, was used to conduct dam safety assessments for earthquakes. The following were compared and analyzed: considering the seismic properties of the dam body with all zoned structures reflected as one rock-fill zone together with the dam body, considering the dam body as the rock-fill zone and the core zone, and the numerical analysis results. Thus, the study was aimed to analyze the impact properties of seismic waves according to the different zones.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.