• Title/Summary/Keyword: 댐유입량

Search Result 618, Processing Time 0.037 seconds

A Hydrological Analysis on the Gate Operation Rule of Dams in Han River Basin (한강유역(漢江流域) 댐군(群)의 수문조작방안(水門操作方案)에 관한 수문(水文) 해석(解析))

  • Lee, Won Hwan;Cho, Won Cheol;Lee, Jae Joon;Heo, Jun Haeng
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.1
    • /
    • pp.91-100
    • /
    • 1985
  • This study is on the gate operation of dams, which are for the hydropower and multipurpose in Han River Basin, considering the safety under the emergency. The results of the study on the safety of dams in Han River Basin associated with the gate operation of dams against the design flood flow and the combined inflow are as follows; 1) The empirical formula (1) can be used for gate operation with the informations of reservoir's water level and the inflow. 2) The applicability of the multiple regression formula (2) among the gate opening area, inflow, water level, and outflow is assured. 3) From the safety analysis of dams for the emergency by the procedures developed in this study, six dams are safe except Soyanggang, Euiam, and Cheongpyung Dam, but the above three dams can be safe with the lowering of the starting water level of gate opening by the pre-discharges.

  • PDF

Influence Analysis for Natural River Bed with Dam Construction (댐 건설이 하류하천 하상에 미치는 영향 분석)

  • Choo, Tai Ho;Chae, Soo Kwon
    • Journal of Wetlands Research
    • /
    • v.14 no.4
    • /
    • pp.715-723
    • /
    • 2012
  • The Hoelyongpo in the Naeseong River as tributary basin of the Nakdong River is broadly well-known a tourist attraction, which is made of sandy beach, and is called "Island of Inland". But Construction of the Dam was planned at upstream of river. In other words, an influx of sediment is blocked from upstream of river. In this situation, through sediment discharge coming from tributary of the Naeseong river, the whether to go ahead of sand beach of the Hoelyongpo is analyzed by using 1-D and 2-D model. The sediment discharge is estimated through ratio raw with basin area, and the instream flow requirement of river coming from dam and the flow rate and sediment coming from tributary are inputted for model. The 1-D model uses HEC-6 and the 2-D model uses SMS(RMA2 and SED2D). The analysis using the HEC-6 is performed from cross section data 10 year ago to the present cross section. Consequently, Yang equation presenting similar result to the present cross section data is determined, using this, the prediction is conducted for the cross section after 20 years. The 2-D analysis is conducted for the present cross section data. The value of distinction between a deposition and erosion with the results presented in the 1, 2-D models is occur, however, the appearance between the deposition and the erosion is similar.

Assessing the Effect of Upstream Dam Outflows and River Water Uses on the Inflows to the Paldang Dam (상류 댐 방류량 및 하천수 사용량이 팔당댐 유입량에 미치는 영향 평가)

  • Kim, Chul Gyum;Kim, Nam Won;Lee, Jeong Eun
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.11
    • /
    • pp.1017-1026
    • /
    • 2014
  • To investigate the effect of upstream dam operation and river water use on the downstream flows, SWAT-K watershed model was applied to the Paldang Dam watershed of the Han River basin. Analysis results from 2001 to 2009 showed that outflows from the multi-purpose dams such as the Soyanggang Dam and Chungju Dam much have a strong influence on the downstream flows during both the low- and high-flow seasons. This resulted an increase of low-flow at the Paldang Dam, the end of Pukhangang, and the Yangpyeong stage station by $100.57m^3/s$, $33.01m^3/s$, and $49.66m^3/s$, respectively. Whereas, the impact of river water use was hardly found in the Pukhangang, and also was not significant in the (Nam)hangang. Therefore, the effect of small dam such as the Hoengseong Dam or river water use would be able be excluded for long-term runoff analysis. But, in the case of the areas with a large amount of water use, a sufficient information such water-intake and water movement also must be taken into account like this study.

Reservoir Management in Flood Period with Chance Constrained LP (위험도제약(危險度制約) 선형계획법(線形計劃法)에 위한 홍수기(洪水期) 저수지운영(貯水池運營))

  • Lee, Kil Seong;Kang, Bu Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.3
    • /
    • pp.139-151
    • /
    • 1992
  • A reservoir operation model was established under the varying restricted water level(r.w.l.) subject to the inflow distributions in flood period. The optimization model consists of 2 sub-models. One model minimizes deviations of releases from the expected release and the other minimizes capacity requirement for flood control. In order to make deterministic equivalents, the inflow distribution of reservoir is assumed to be 2-parameter Lognormal, and its parameters are estimated by the maximum likelihood method. The model is applied to joint operation of Soyang and Chungju dam. The results show that Soyang was designed for larger flood event than that for Chungju. The operation under the varying r.w.l. turns out to be more effective than one under the uniform r.w.l. Such effect is more obvious at Chungju compared with Soyang. Release pattern shows diminishing and delaying effect in a period of high inflows and larger discharges than actual in a period of low inflows.

  • PDF

Prediction of Andong Reservoir Inflow Using Ensemble Technique (앙상블 기법을 이용한 안동댐 유입량 예측)

  • Kang, Min Suk;Yu, Myungsu;Yi, Jaeeung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.795-804
    • /
    • 2014
  • In this study, Andong Reservoir monthly and ten days inflows from July 2011 to September 2011 are predicted using SWAT model and ensemble technique. The weight method using monthly and ten days rainfall forecasts from Korea Meteorological Administration is applied for accurate analysis. If the rainfall prediction announced by Korea Meteorological Administration is close to the actual rainfall, the PDF-Ratio Method shows the best result. If the past high rainfall occurrence is close to the actual rainfall, the modified PDF-Ratio method shows the best result. This method can improve the prediction accuracy even though the Korea Meteorological Administration forecast is not accurate. On the contrary, if Korea Meteorological Administration forecast is different from the actual rainfall and the past rainfall occurrence statistics of lower section, the uniform method shows the best result.

Hydrologic Regime Alteration Analysis in downward river by dam-specific(functions, size) through I.H.A (수문변화 지표법을 적용한 댐 특성 요소별 하류하천에 미치는 유황변화 분석)

  • Kang, Ki-Ho;Yum, Kyung-Taek;Jung, Kwan-Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1422-1426
    • /
    • 2009
  • 본 연구에서는 댐 특성(기능, 규모)별로 하류하천에 미치는 유량변화 문제를를 체계적으로 분석하고자 수문변 화지표법(Indicators of Hydrologic Alteration, Richter et al., 1996)을 적용하여 한국수자원공사에서 관리하는 소양강댐 등 11개 다목적댐과 광동댐 등 12개 용수전용댐의 일단위 유입량과 방류량 자료를 이용, 연최소 최대유량 크기와 지속기간, 유량변화정도 등을 분석하여 댐운영이 하류하천에 미치는 유량변화를 비교분석 하였다. 광동댐 등 12개 용수전용댐의 월 유량변화의 산정 결과, 갈수기에 해당하는 10월부터 다음해의 6월까지 8개월간은 댐건설전 월평균 방유량은 $0.64m^3/sec\sim3.05m^3/sec$이었으나, 댐건설후 월평균 방류량은 $0.33m^3/sec\sim2.99m^3/sec$로 -69.7%$\sim$167.8%의 분포를 나타내고 있으나 12월과 1월을 제외하면 댐 건설 이후 오히려 6.8%$\sim$69.7% 가 감소하였다. 우기철인 7월부터 9월까지 3개월간은 댐건설전 월평균 방류량이 $6.82m^3/sec\sim7.67m^3/sec$이었으나, 댐건설후 월평균 방류량은 $4.12m^3/sec\sim4.35m^3/sec$로 51.0%$\sim$55.1%가 감소하여 저수지 공용량을 이용한 저류효과가 다소 있었음을 알 수 있다. 용수전용댐과 다목적댐의 분석 결과를 비교하여 보면, 용수전용댐은 1일 최소유량의 경우는 평균적으로 76.52%가 증가하였으나 3일부터 90일 최소유량의 54.19%$\sim$67.19%까지 감소하여 갈수기 하류유량 개선효과는 없으나, 다목적댐의 경우는 1일 최소 유량은 743.76%가 증가하였으며 90일 최소 유량도 83.62%가 증가하여 갈수기 하류유량 개선 효과가 큰 것으로 분석되었다. 용수전용댐의 1일 최대유량의 경우는 37.8%가 감소되며 90일 최대유량은 38.5$\sim$51.0%까지 감소하여 홍수기 댐의 저류효과가 점차 증가하였다. 다목적댐의 경우는 1일 최대 유량은 59.4%가 감소하였으며 감소량은 점차 감소하여 90일 최대강우량은 30.1%가 감소하여 홍수기 댐 저류효과로 하류홍수량을 상당히 조절함을 알 수 있다.

  • PDF

Study for coping with water shortage analysis: Imjin-River Basin in dry season (임진강 유역 갈수기 물 부족 원인 분석에 따른 대응 방안 연구)

  • JANG, Suk-Hwan;LEE, Jae-Kyung;LEE, Hyo-Sang;OH, Ji-Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.261-261
    • /
    • 2016
  • 임진강 유역은 우리나라와 북한과의 접경지역에 속하는 유역으로서 임진강은 북한에서 발원하여 남한으로 흘러 한강으로 유입되는 공유하천으로 볼 수 있다. 본 연구 유역은 이수, 치수, 수질, 환경 측면에서 타 유역에 비해 불안요소가 많은 지역이므로 남북한의 관계 개선을 통한 효과적인 대책 수립에서 공동의 노력이 필요한 지역이라 할 수 있다. 과거에 집중호우와 태풍의 영향 등으로 인하여 많은 피해로 인하여 이에 따른 대책과 많은 계획 등이 수립되었고, 북한의 무단방류에 따른 사고로 인하여 피해로 인하여 이를 극복하고, 홍수를 조절하는 목적으로 군남홍수조절지, 한탄강홍수조절댐을 건설하여 홍수에 따른 선제적 대응과 주민 피해 등을 방지하고자 하였다. 그러나 최근 경기북부를 포함한 임진강 유역의 가뭄으로 인한 유량의 감소로 인하여, 2014~2015년의 파주 장단반도 일대의 농업용수 부족과 하구의 조위, 즉 염도에 의한 영향으로 하류부 급수 불량 등 이수적 측면에서 주민들의 피해 문제가 속출하고 있는 실정이다. 위와 같은 배경을 바탕으로 본 연구에서는 임진강 유역에 위치한 기상 수문관측자료(2000년~2015년)를 이용하여 다음 내용을 연구하였다. 첫째로 수문기상인자들의 경향성 분석을 통하여 임진강 유역의 유량 감소 원인을 파악하였으며, 수문기상인자들의 감소에 따른 영향과 북한 댐건설에 따른 유역변경 영향에 대하여 분석을 수행하였다. 전체적으로 임진강 유역의 유량은 감소추세에 있으며, 북한 댐건설의 영향이 있는 것으로 파악되었다. 또한 최근 2014년과 2015년의 유량 감소는 강수량의 감소 영향이 큰 것으로 나타났다. 두 번째로 북한 댐건설에 의한 영향을 살펴보기 위해 임진강 상류를 대상으로 하천유출모형인 PDM을 이용하여 장기유출모의를 수행하였으며, 모의결과 북한 댐건설에 의해 유출특성이 변하였음을 확인하였다. 세 번째로 임진강 유역 갈수량을 추정하고 물 부족량 및 필요수량을 분석하였다. 분석결과, 북한 댐건설 이후를 기준으로 물 부족량이 발생하였으며, 이에 필요한 필요 수량을 제안하였다. 또한 최근 2014년과 2015년과 같은 비상시에 대한 필요 수량도 제안하였다. 마지막으로 앞서 제안한 필요 수량을 확보하기 위해 기존댐 담수 및 연계운영, 신규 수자원 확보 방안, 남북 공유하천 공동 관리 방안 등의 대응방안을 제안하였다.

  • PDF

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( II ) - Simulation of Historical Flood Events - (퍼지제어모형을 이용한 다목적 댐의 홍수조절모형 (II) - 과거홍수사상에 대한 적용 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.1 s.12
    • /
    • pp.41-50
    • /
    • 2004
  • The objective of this study is to investigate the feasibility of the developed Fuzzy control techniques in dam operation. The simulated results for the 1984, 1990, and 1995 flood events are compared with historical operation results in the view of flood control and disaster prevention. The three models developed in this study determine the outflows based on the two conditions the first one is to consider only two inputs such as reservoir water level and inflow, for operation of the existing situations, the second one is that the possible maximum discharge from each dam does not exceed the allowable design maximum discharge for disaster prevention in downstream area. As the results, it was shown that the suggested models based on Fuzzy control technique could reduce both the peak water level and the maximum peak discharge compared with the historical operation results.

Spillway Design by Using Numerical Model Experiment - Case Study of AnDong Multipurpose Dam - (수치모형실험을 이용한 여수로 설계 - 안동다목적댐 -)

  • Kim, Dae-Geun;Park, Sun-Jung;Lee, Young-Sik;Hwang, Jong-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1604-1608
    • /
    • 2008
  • 최근 기상이변 등에 따라 빈번히 발생하는 이상홍수에 대비하여 댐의 안정성 확보를 위한 댐설계기준이 강화되었고, 이에 따라 가능최대홍수량(PMF) 유입시 댐의 항구적인 안전성 확보를 위하여 치수능력 증대사업이 필요하게 되었다. 본 연구에서는 안동댐의 치수능력 증대사업의 일환으로 계획된 비상여수로에 대하여 2차원, 3차원 수치모형실험을 통해 비상여수로의 수리학적 안정성과 기능성을 검토하였다. 최적의 설계안을 결정하는데 필요한 자료를 제공하기 위하여 접근수로의 유황, 월류위어의 방류능력, 급경사수로 및 감세공의 유황을 검토하였다. 특히, 월류위어의 교각형상에 따른 수면형상, 조절부의 제원에 따른 방류량 검토, 조절부의 평면형상에 따른 유황, 급경사수로의 종단경사에 따른 유황, 저유량 방류시 플립버킷부에서의 사출궤적 등에 대한 검토 등을 수행하였다. 본 연구결과, 수치모형실험은 설계자에게 실용적인 해석도구로 사용될 수 있음을 보일 수 있었다.

  • PDF

Down Stream Flood Forecasting and Warning Method Using Parellel River Stage (병렬 하천수위를 이용한 하류 홍수위 예경보기법)

  • Kwon, Ki-Dae;Choo, Yean-Moon;Jee, Hong-Kee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.393-397
    • /
    • 2012
  • 인접한 저수지 간의 연계운영을 통한 홍수조절 및 용수공급능력을 제고시키기 위해서 저수용한 공유기법의 일환인 병렬저수지 시스템을 연구대상으로 안동댐 및 임하댐 유역을 연계운영기법으로서 홍수조절능력을 제고시키고 안동댐의 저수량을 확보시켜 용수공급능력을 제고시킬 수 있는 방법을 연구하였다. 특히 유역추적과 하도추적을 통해 계산된 매개변수들을 실제 형태와 비교분석하여 산정하고, 이에 따른 가장 적합한 강우-유출해석을 통한 하류 지역의 홍수 피해를 최소화하기 위한 예 경보 기법을 제시하였다. 최적의 유수전환용량을 산정하기 위해 저수지간의 Swiching 기법을 고려하였으며, HEC-HMS 모형을 이용하여 재현기간별 유입량을 예측하여 결과를 도출하였다.

  • PDF