• Title/Summary/Keyword: 대형시공사

Search Result 35, Processing Time 0.021 seconds

Development of Precast Hollow Concrete Columns with Non-Shrink Mortar Grouting Type Splice Sleeve (무수축 모르타르 충진형 슬리브를 사용한 중공 프리캐스트 교각 개발)

  • Cho, Jae-Young;Lee, Young-Ho;Kim, Do-Hak;Park, Jong-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3A
    • /
    • pp.215-225
    • /
    • 2011
  • In general, the precast columns can obtain its homogeneous quality as they are produced in a factory with a hollow concrete block type by using high strength concrete, so that they can generate the reduction of dead load. Such a method of precast hollow concrete columns is already implemented in USA and Japan and used for connecting between blocks which use PC tendons. However, it is inevitable to have uneconomical construction with excessive cost in early stage when PC tendons are used. This study aims to develop an economical precast column with high quality and constructability which consists of only splice sleeve and general reinforcing bar without using PC tendons in order to reduce the construction period and cost. To achieve this goal, this study tested the performance of total 5 minimized models in the experiment with the variables such as hollowness, diameter of main reinforcement bar and cross-sectional size for the cross section of precast column by using grouting type splice sleeve which is a new type joint rebar. And it also verified the performance of column in the experiment for a large-sized model in order to overview its applicability by excluding large scale effect.

Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.

Mock-up Test of Temperature Crack Reduction Method Application by Setting Time Control of Mat Foundation Mass Concrete (응결시간조정에 의한 매트기초 매스 콘크리트의 온도균열저감 공법적용의 Mock-up Test)

  • Han, Cheon-Goo;Lee, Jae-Sam;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.55-61
    • /
    • 2009
  • Recently, the number of high-rise buildings being built in Korea by major construction companies for residential and commercial use has been increasing. When constructing a high-rise building, it is necessary to apply massive amounts of concrete to form a mat foundation that can withstand the huge load of the upper structure. However, it is of increasing concern that due to limitations in terms of the amount of placing equipment, available job-sites and systems for mass concrete placement in the construction field, it is not always possible to place a great quantity of concrete simultaneously in a large-scale mat foundation, and for this reason consistency between placement lift cannot be secured. In addition, a mat foundation Is likely to crack due to the stress caused by differences inhydration heat generation time. To derive a solution for these problems, this study provides test results of a hydration heat crack reduction method by applying placement lift change and setting time control with a super retarding agent for mass concrete in a large-scale mat foundation. Mock-up specimens with different mixtures and placement liftswere prepared at the job-site of a newly-constructed high-rise building. The test results show that slump flow of concrete before and after adding the super retarding agent somewhat Increases as the target retarding time gets longer, while the air content shows no great difference. The setting time was observed to be retarded as the target retarding time gets longer. As the target retarding time gets longer, compressive strength appears to be decreased at an early stage, but as time goes by, compressive strength gets higher, and the compressive strength at 28 days becomes equal or higher to that of plain concrete without a super retarding agent. For the effect of placement lift change and super retarding agent on the reduction of hydration heat, the application of 2 and 4 placement lifts and a super retarding agent makes it possible to secure consistency and reduce temperature difference between placement lifts, while also extending the time to reach peak temperature. This implies that the possibility of thermal crack induced by hydration heat is reduced. The best results are shown in the case of applying 4 placement lifts.

Brittle crack arrest design for shipbuilding welding structural with thick steel plate (고강도 극후물재 용접부 취성균열 전파 정지 기술 개발에 관한 연구)

  • An, Gyu-Baek;Ryu, Kang-Mook;Lee, Jong-Sub;Park, Tae-Dong;Shin, Yong-Taek;Han, Ki-Hyung;Jeong, Sang-Hoon;Kang, Sung-Ku
    • Proceedings of the KWS Conference
    • /
    • 2009.11a
    • /
    • pp.92-92
    • /
    • 2009
  • 조선업을 포함한 다양한 산업 분야에서 후판 강재의 수요량 증가와 함께 사용 범위 또한 폭넓게 되고 있다. 특히, 선박의 수송효율의 극대화를 위하여 컨테이너선의 대형화가 급속하게 진행되고 있으며, 2009년 현재1,300TEU 이상의 초대형 컨테이너선이 건조되고 이다. 이처럼 용접구조물의 초대형화에 따른 사용강재 또한 고강도 극후물화 되고 있다. 현재 선박에 적용중인 고강도 강재는 EH47 강재로 YP 460MPa 급의 강재가 Hatch Coamming부에 적용중에 있으며, 강재의 두께 또한 70mm 이상이다. 이러한 고강도 극후물재의 강구조물에 적용에 따른 선급협회에서는 용접부에서의 취성균열 전파에 의한 취성파괴의 위험성이 있으므로 강재의 두께를 제한하고 더욱 엄격한 파괴인성값을 요구하고 있다. 일본선급협회(NK)를 중심으로 취성균열의 정지를 위한 모재의 요구 성능등에 관한 연구들이 진행되고 있다. 이 연구의 대부분의 전제 조건은 선박의 블럭과 블럭의 조립시에 용접부가 직선형이 아닌 계단형(Butt shift)를 하는 것으로 하고 있으므로, 국내의 조선건조 공법의 현실과는 거리감이 있다. 본 연구에서는 국내 조선사에서 수행중인 직선 이음부에 대한 시공 공법에서 취성균열이 발생하여 진전 되더라도 균열을 정지 시킬 수 있는 기술에 관한 연구를 수행하였다. 균열의 진전은 대부부의 연속면에서는 정지를 시키지 못하고 직진 전파 하여서 파괴에 도달하게 된다. 따라서 뭔가의 불연속적인 면을 임의로 생성하여야 균열을 정지 시킬 수 있다. 본 연구에서는 이러한 균열의 정지 방법으로 형상적인 측면과 재료적인 측면에서 검토를 수행하였다. 형상적인 측면에서는 균열을 정지 시키고자 하는 위치에 불연속적인 면을 만들기 위하여 일정 크기의 hole을 만들어서 균열을 정지시켰으며, 재료적인 측면에서는 고인성의 용접재료를 사용하여서 취성균열이 진행하는 경로에 인성을 높은 재료를 적용하여 불연속적인 면의 생성과 함께 인성을 높여서 균열을 정지 시키는 기술을 개발하였다. 이러한 기술의 개발을 통하여 취성균열의 전파에 의한 파괴를 방지 할 수 있으며, 용접구조물의 안전성 확보를 가능하게 하였다.

  • PDF

Design of Truck Escape Ramps (자동차 긴급 피난 차선의 계획 설계)

  • 구본충
    • Journal of the Korean Professional Engineers Association
    • /
    • v.28 no.4
    • /
    • pp.54-75
    • /
    • 1995
  • This synthesis has been prepared from a review of literature on Truck Escape Ramps technology and a survey of current practice by state department of transportation. Their locations have been determined usually from a combination of accident experience and en-gineering judgement, but new tools are emerging that can identify needs and sites without waiting for catastrophic accidents to happen. The Grade Severity Rating Systems holds promise in this regard. Design Procedures for truck excape ramps continue to evolve. Gravel arrester beds are clearly the preferred choice across the country Rounded aggregate, uniformly graded in the approximate size range of 13 to 18mm. Tech-nical publications typically have dassified TER types as paved gravity, sandpile, and ar-rester bed ramps. The design speed for vehicle entry into the ramp in critical to the deter-mination of ramp length. An escape ramp should be designed for a minimum entry speed of 130km/hr, a 145km/hr design being preferred. The ramps should be straight and their angle to the roadway align-ment should be as possible. The grade of truck escape ramps show the adjustment of ramp design to local topography, such as the tradeoff of ramp length against earthwork requirements. A width of 9 to 12m would more safety acommodate two or more outof con-trol vehicles. Reguarding comments on the most effective material, most respondents cited their own specification or referred to single graded, rounded pea gravel. The consensus essentially Is that single graded, well -rounded gravel is the most desirable material for use in arrester beds. The arrester beds should be constructed with a minimum aggregate depth of 30cm. Successful ramps have used depths between 30 and 90cm.

  • PDF