• Title/Summary/Keyword: 대형시공사

Search Result 35, Processing Time 0.022 seconds

A Study on the Presumption of Proper Construction Cost of Distribution Facilities by Analyzing Actual Construction Cost (실적공사비 분석을 통한 유통시설물의 적정공사비 추정에 관한 연구)

  • Go, Seong-Seok;Kim, Hyun-Sik;Lee, Hyun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.108-117
    • /
    • 2008
  • The appearance of the large distribution facility of large enterprise putting first reaches get to the various effect until change of leisure life and life pattern of the consumers from the distribution industry of the interior of a country. Competition of the distribution facility upgrade of the distribution facility and it shows the aspect which becomes the semi-department store, and construction cost is appearing different in proportion to each form or scale. Therefore, purpose of this study was to facilitate amicable construction progress between the owner and the builder through estimating the proper construction cost. This study investigated and analyzed the actual cost of 15 domestic distribution facilities and these datums were used to estimate the proper construction cost. This cost shows that from new project accomplishment through analysis of prediction construction cost for feasibility study from initial plan and design step and can be utilizable elementary data bH decision method to whether or not to propriety of distribution facilities business.

A Study on the Issue Analysis and the IFC Compatibility Review on BIM S/W for Application of BIM in National Road Project (국도 도로공사의 BIM적용을 위한 상용소프트웨어 간 IFC 호환성 검토 및 문제점 분석에 관한 연구)

  • Yang, Jung-Min;Yang, Sung-Hoon;Choi, Won Sik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1304-1306
    • /
    • 2012
  • 최근 건설 산업에서는 비용 절감과 공기 단축 등 건설 프로세스의 새로운 대안으로 BIM(Building Information Modeling)의 효용성이 널리 알려지며 대형건설사와 건축사사무소를 중심으로 BIM 적용을 위한 다양한 시도가 이뤄지고 있다. 이러한 과정은 다양한 분야의 전문가들의 협업으로 이루어지기 때문에 작업자간의 원활한 설계 정보 공유를 위해서는 각기 다른 BIM 소프트웨어에서 만들어 내는 데이터간의 정보호환이 필요하다. 이에 본 논문에서는 빌딩스마트(buildingSMART International, BSI)가 제시한 건축, 엔지니어링, 시공 분야(AEC)의 데이터 교환을 위한 국제 표준인 IFC(Industry Foundation Classes)를 이용하여 이기종 파일 간 호환성 검토 및 문제점 분석을 통해 정보모델개발의 기반자료로 활용하고자 한다.

Development of a PMIS Emphasizing On-Site Management Functions (현장 중심의 건설사업 관리시스템의 개발)

  • Shin Seung-Sik;Chun Jin-Yong;Kim Dae-Jin;Woo Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.545-548
    • /
    • 2003
  • In the past, there were problems in managing construction due to the lack of effective communication and sharing information between a constructor and an owner during construction works. To solve those problems, several major construction companies made great efforts to get a higher productivity through the systematic management, cumulating construction know-how. As a result of the endeavor, some of those companies developed the foundation of PMIS(Project Management Information System). However, it is thought that PMIS on the construction site was not effectively used in performing construction. Therefore, through the case of contractor's management system which is being used in 1-4 out field construction site in Incheon International Airport Rail of P construction company, this paper deals with the development of system supporting to the practical work of construction site and it'll provide to be the foundation of making effective PMIS.

  • PDF

An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

Carbon Emission Study of Transplanting Large Trees from Gangwon Province to Seoul (강원지역 대형 조경수 서울 이식에 따른 탄소 배출 연구)

  • Choi, Yoo;Ahn, Tong-Mahn;Lee, Jae-Won
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.4
    • /
    • pp.10-16
    • /
    • 2013
  • Korean housing developers are in a very competitive market and their way of attracting buyers is landscaping better than competing firms do. Thus, transplanting larger pine trees(Pinus densiflora S. et. Z.) is in vogue. A typical case is a pine tree about 30-year old, 35 diameters at breast height, transplanted 223 km afar from the Gangwon Province to Seoul. We estimated and compared carbon emissions during the whole transplanting works, and carbon intake by the tree if it survives 50 more years on site. Findings are; first, a large tree will take up and sequestrate approximately 90 kgC if it survives 50 more years. Second, transplanting works emit approximately 113.69 kgC, which is about 1.26 times of its possible future intake of carbon. Landscaping is a legal requirement for the purposes not only of aesthetics but also of environmental quality. Transplanting larger trees that came from a dam or a road building site may be inevitable and acceptable. However, transplanting larger trees long distance was evaluated to be harmful to the environment. It is strongly recommended to prohibit transplanting large trees. Landscape professionals need to guide clients to have desirable consumer attitude.

A Study of the Reduction of the Floor Impact Sound by Applying RC structural frames (Girders and Stirrups) to the Wall Structures of Apartment Buildings (철근 콘크리트 라멘조 보 배근과 스트럽을 적용한 공동주택 벽식 구조의 슬래브 바닥충격음 저감 방안)

  • Shin, Ki Jun;Lee, Kyung Ryun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.95-101
    • /
    • 2022
  • This study attempts to identify the ways of reducing the floor impact sound, by applying six different types of the reinforced bar girders and stirrup arrangements to the Structure: (1) the longer-direction girder arrangements (2) the shorter-direction girder arrangements (3) the diagonal-direction arrangements (4) the longer-direction girder arrangements with stirrups (5) the shorter-direction girder arrangements with stirrups (6) the diagonal-direction arrangements with stirrups. In order to identify the most effective structural changes, each slab was tested with bang machines, measuring the level of the sound impact. The results showed that the longer-direction girder arrangements with stirrups were the most effective one. In addition, the effectiveness of slab was found to be remarkable, showing the level of minimum 1dB to maximum 5dB, where the slab was compared with the control models without girders and stirrups. In conclusion, it is suggested that the longer-direction girder arrangements with stirrups could possibly be applied to the Wall Structures to minimize the floor impact sound.

The Status and Prospect of Technical Development of CTL (Coal-to-Liquid) in Korea (CTL (Coal-to-Liquid) 국내 기술 개발 현황)

  • Kim, Hak-Joo;Jung, Heon;Lee, Ho-Tae;Chun, Dong-Hyun;Lee, Chang-Keun;Lee, Jea-Goo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.461-461
    • /
    • 2007
  • 석탄을 합성석유로 전환시키는 석탄액화(CTL) 공장은 2차 세계대전시 독일 및 영국에서 가동되어 대량의 연료를 공급한 바 있다. 전후 대형 유전이 발견되어 값싼 석유가 공급되면서 CTL 공장의 운전은 중단되었다. 남아프리카공화국의 Sasol사만이 유일하게 1955년에 CTL공장의 조업을 시작하여 현재 하루 15만배럴의 석탄합성석유를 생산하고 있다. 최근 고유가가 지속되고 석유공급에 대한 불안감 때문에 여러 개의 석탄액화 프로젝트가 진행되고 있다. 중국은 2030년까지 석탄합성석유를 연간 3천만톤(60만배렬/일) 생산할 계획을 수립하였고, 2만배럴/일 규모의 석탄직접액화공장이 2008년 완공될 예정이다. 미국에서도 8개의 CTL 프로젝트가 진행되고 있다. 호주, 필리핀, 인도네시아, 인도 등에서도 석탄액화 프로젝트를 추진하고 있다. 석유를 전량 수입하는 우리나라도 에너지안보 차원에서 CTL에 대한 접근이 필요하다. 본고에서는 한국에너지기술연구원에서 추진되고 있는 석탄 기준 10톤/일급 석탄 합성석유 생산 공정 설계, 설비 시공 현황 및 향후 계획에 대하여 기술하였다.

  • PDF

A Study on the Building of Defect Information DB Management System of Apartment House for Defect Prevention (하자예방을 위한 공동주택의 하자정보DB관리시스템 구축에 관한 연구)

  • Jang, Hyo-Seong
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.3
    • /
    • pp.300-314
    • /
    • 2013
  • Defects on apartment which is one of the major residential types in Korea have produced unexpected inconveniences to owners of apartments. If construction companies paid more careful attention to defect information management, a lot of flaws could be prevented. In this situation, this study attempted to seek improved defect information DB management system. First, research on defect information DB management system of large construction firms was conducted to confirm necessities of improved system. Following survey showed problems of current defect information DB management system and the need of improvement. The study came up with remedies expected to contribute to preventing faults.

A Study on Estimating Time for PRD (Percussion Rotary Drill) Piling Work (도심지 토공사 PRD (Percussion Rotary Drill) 공법의 천공작업 소요시간 산정 방안에 관한 연구)

  • Kim, Yong-Gyu;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.3-10
    • /
    • 2018
  • In recent years, mechanized construction has become commonplace due to increases in the scale and complexity of construction, and construction machinery is a major factor in successful construction. However, even though the proportion of construction machinery is increasing, analysis of the work capacity of construction machinery is inadequate. In addition, since the standards for all construction machines are currently not defined in quantity-per-unit, the construction period is arbitrarily applied according to the operator at the time of the construction plan. As a result, the construction period of the actual construction is insufficient, and rushed work or construction delays occur. Therefore, in this study, in order to calculate the construction period of the piling work of the pile driver used in the PRD method more accurately than the existing method, the formula for calculating the time required for the piling work of the pile driver was established by collecting piling time data from the daily task reports through the field survey. If the precise construction period of piling work is estimated based on the results of this study, it will be possible to prevent the rushed work and construction delays that occur due to the short construction period.

An Analysis of Profitability Study of Overseas Construction Projects using Multiple-Regression (다중회귀분석을 통한 해외 건설 프로젝트 특성요인이 손익율에 미치는 영향 분석)

  • Kim, Jineon;Kim, Yeasang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.95-103
    • /
    • 2014
  • From $1960^{th}$ Korean construction industry has been rapidly grown due to Meddle-East construction market growth. To earn foreign currency and to raise overall Korean industry government has encouraged construction frontiers. As construction industry could grow up for its labour based originity but the time passes by and overseas construction market requests engineering know-how and technology for productivity to earn more profit. Over last 20 years overseas construction market share has been dramatically raised but its profit share is gradually declining. This study analyzed data sets of over 180 overseas construction projects for last 30 years of domestic contractor by using multiple-regression analysis and derived an output how input variables of characters explaining the construction project effects its profit.