Proceedings of the Korean Society of Disaster Information Conference
/
2023.11a
/
pp.219-220
/
2023
본 논문에서는 건축물의 고층화, 대형화로 외벽 청소, 도장, 견출, 검사등 작업시 손쉽고, 빠르며 경제적으로 작업을 위한 방법으로 작업의자형 달비계를 사용 하고 있으나 최근 3년간 유지·보수공사 작업시 근로자의 중대재해가 36명으로 신축·증축·재건축공사 2명으로 유지·보수공사에서 많은 중대재해가 발생되고 있는 실정으로 50억이상 신축 작업에서는 산업안전보건법에 의하여 관리감독자 및 안전관리자가 선임 되어 현장의 전반적인 안전관리 활동을 하고 있으나 50억 이하 소규모 작업장에서는 안전관리 할동이 전무한 실정이고 저가수주, 적정 공사기간 불가 및 산업안전보건관리비 미계상 등 근로자들에 대한 안전대책이 없고 외부 안전점검기관의 사각지대로 근로자의 안전 확보에 어려움이 있은 실정으로 사업주 및 근로자에 대한 안전교육 및 관리감독이 철저히 이루어져야 할 것이다
In this study, an analysis is carried out on the acoustic design for an indoor gymnasium scheduled to be built at Buan County, Chonbuk Province. By way of background, the study examines the case of a large-scale indoor gymnasium that has been constructed in the local area of Hangan-myeon. There are many examples whereby this gymnasium could be used not only as a sporting facility for the residents, but also as a multipurpose space for public performances such as leisure activities, lectures, assembling activities, theatre and concerts etc. In order to maximize the functional utilization of such an indoor gymnasium, it is important to simultaneously verify the acoustic capabilities of the space in terms of Definition of both Voice and Music. However, as a large-scaled athletic facility, the building was designed with a high ceiling-height to accommodate its functional characteristics. The space forms a Sound Focus whereby the sound is concentrated at a specific part, and because the vibration of sound is too loud due to its broad volume, acoustic defects arise such as a significant number of Echoes. Using this gymnasium as a precedent, this study proposes an acoustic design based on the drawings of the indoor gymnasium that is scheduled to be built at B County, Chonbuk Province. The gymnasium is equipped with an optimized acoustic condition passing through the Acoustic Simulation Phase. From the results of an Acoustic Simulation, we can design an indoor gymnasium that is equipped with a considerably satisfying and improved acoustic performance compared with the building before it was reformed. It is also considered that the use of such materials can fundamentally reduce construction costs and can improve acoustic performance, at the planning and design stages for similar sporting facilities in the future.
The number of large and complex buildings is growing and they are usually concentrated in metropolitan cities. There is a possibility in such buildings that a small accident can expand to a massive disaster since their scale and complexity. To deal with this issue, a research on gas sensors which can detect multiple gases and early-warning systems has been conducted. Proper criteria or standards are necessary for effective application and operation of such sensor-based disaster monitoring system. In this study, we have proposed the alarm criteria of concentration of hazardous gases for the detection and the alarm release. For each alarm level, systematic disaster response plans consist of responsive actions and information delivery have been prepared. These disaster monitoring criteria can help the detection of hazardous gas-related disaster in the early stage of accident and the provision of appropriate emergency responses.
Journal of the Korea Institute of Information and Communication Engineering
/
v.22
no.6
/
pp.874-880
/
2018
3D modeling is extensively used in the field of architecture, machinery and contents production such as movies. Modeling is a time-consuming task. In order to compensate for these drawbacks, attempts have recently been made to reduce the production period by applying 3D scanning technology. 3D scanning for small objects can be done directly with laser or optics, but large buildings and sculptures require expensive equipment, which makes it difficult to acquire data directly. In this study, 3D modeling data for a large object is acquired using photometry with using drones to acquire the image data. The maintenance method for uniform spacing between the sculpture and the drone, the measurement method for the flight line were presented. In addition, we presented a production environment that can utilize the obtained 3D point cloud data for animation and a rendered animation result to find ways to make it in various environments.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.37-44
/
2006
The construction management has been applied for the first time in South Korea on the New Catholic Medical Center. The construction of the project has been controlled and managed by the CMr, as Client's agent from the very beginning stage of construction when the block plan is being established by the Contractor's design consultant. As CMr generally gets involved in the project throughout the entire construction phases on behalf of the Client, Parsons Brinckerhoff has been delivering high quality solutions that satisfy the Client's requirements in Pre-construction stage and also brought practical and innovative engineering solutions in a time and cost effective method. The objective of this case study is to describe works executed by CMr in Pre-construction stage ; and, analyze the positive effects by applying CM to the project. Therefore, it is anticipated that CM procedure might be introduced and adapted to the up-coming hospital construction projects.
Proceeding of Spring/Autumn Annual Conference of KHA
/
2008.04a
/
pp.421-426
/
2008
In case of the large-scaled indoor gymnasium that has been constructed in the local area, there are many instances for the use as multipurpose space where the public performances are possible such as leisure activity, lecture, assembling activity, drama, concert and so on for the resident together with the purpose of sporting facility. In order for utilization to the maximum of the function of such indoor gymnasium, the acoustic capabilities concerned with Definition of both Voice and Music are simultaneously required. However, in case of the large-scaled athletic facility, since it was designed with high ceiling-height in view of its characteristics, it forms a Sound Focus and then the sound is concentrating to the specific part, and because the vibration of sound is too loud due to its broad volume, the acoustic defects such as many Echoes are arising. On such viewpoint, based on the drawing of the indoor gymnasium that is scheduled to be built at B County, Chonbuk Province, this Study has proposed such indoor gymnasium equipped with the optimized acoustic condition passing through Acoustic Simulation Phase. As the result of Acoustic Simulation, we could design the indoor gymnasium that equipped with really satisfying acoustic performance 'after' reformation compared with 'before' reformation, and it is considering that such material could be utilized as the fundamental material that brings a curtailment effect of the construction cost and also enables us to improve the acoustic performance, at the stage of planning and designing for the similar sporting facility in the future.
Journal of the Economic Geographical Society of Korea
/
v.15
no.1
/
pp.131-145
/
2012
During the 1980s and 1990s, most of the old industrial cities of advanced countries have experienced serious de-industrialisation. This has caused many problems, such as economic decline, increasing unemployment, environmental degradation and social unrests. Since the mid-1980s, some of these cities have started to tackle the problems by urban regeneration programs with cultural and artistic activities, new industries, and implementing housing projects. The cities of Newcastle and Gateshead in Northeastern England were the examples of the ones which have created major development projects, such as building condominiums, renovating old factory building, and promoting cultural and art activities. This paper introduces policies and programs of the cities' urban regeneration, analyses their governance structure, and articulates factors contributing to the success of the policies and programs.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.106-114
/
2004
As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.
The plane-wave shielding effectiveness is typically measured for horizontal and vertical polarizations using a linearly polarized antenna. However, this typical measurement method results in big evaluation fees due to very long measurement time as well as huge idle space for maintenance, these problems is more severe especially in large shielded enclosures such as EMP protection facilities to be built in indoor buildings and underground. This paper describes the design and fabrication process and results of a planar log-spiral antenna applicable to the evaluation of the electromagnetic shielding effectiveness of a large EMP protection facility. Since the proposed antenna has a circular polarization, there is no need to separately measure the horizontal and vertical polarizations. Therefore, the measurement time can be shortened by more than 1/2, and further, its small volume with a planar structure can reduce greatly idle space required for the maintenance.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.3
/
pp.607-616
/
2015
The demand for cars has been so steadily increasing based on the economic growth that the number of registered cars reached 18,870,000 as of the end of December, 2012. Due to this, the demand for the parking lots also rises continuously. Because of the limited ground space, the buildings ever becoming larger, and the trend of underground parking spaces, recent parking spaces are generally constructed underground. Accordingly, the parking lot ramps slope is limited to less than 17% by relevant laws to ensure the driver safety. However, when a driver enters a parking lot ramps whose slope is slightly steep, he frequently experiences his car body colliding with ramp brackets and often sees the scratches on ramp floor. Thus, this study is intended to prevent any damage to a structure and to contribute to ensuring the riding comfort and safety of drivers and passengers by presenting the details of proper vertical curve to prevent the collision of vehicles with ramp brackets through a vertical analysis of the first and last parts of a parking lot ramps. Because it is necessary to decide the appropriate and suitable vertical slope of a parking lot ramps, this study first identified the problems through site inspection, targeting the parking lot ramps of large buildings frequently that are used by many random people. Next, the possibility of mutual collision was assessed through a theoretical analysis of the first and last parts of a parking lot ramps. Lastly, the vertical curve of a parking ramp was analyzed to estimate its details, which was presented in this study. In conclusion, if the vertical curve presented through this study is used, it will help prevent any damage to the cars and structures, ensure the riding comfort and safety of the drivers, and further reestablish the criteria for vertical installation of a parking lot ramps.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.