Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.323-326
/
2002
Facing the rapid changes in business environment, construction companies have been required to improve their structures to reinforce the competitiveness. Construction companies have attempted the various management innovation and taken measures to enhance the productivity through the information systems. But compared to the efforts made in restructuring and process improvement, organization issues have not been considered sufficiently. So this study was executed to discuss the organization changes due to the innovation occurring in construction organization. This study was focused on the organization controlling the activities directly in construction site and the work process improvement in management.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2018.05a
/
pp.81-83
/
2018
국내 항만 공공시장이 침체된 상황에서 이라크 바스라주 남부지역내 컨테이너 전용부두와 일반화물부두를 조성하는 대형사업이 계획되었다. 그리스 주도의 다국적 기업인 아키로돈이 공사중인 동측방파제와 병행하여 대우건설은 15.85km 사석경사식의 서측방파제 공사를 2014년 2월부터 2018년 5월 현재까지 수행 중에 있으며 그 주된 설계, 시공현황을 요약하였다. 아울러, 시공 중 재료수급, 해양조건, 사업지 지반여건을 고려한 설계 최적화 과정도 소개하였다.
Journal of the Korea Institute of Building Construction
/
v.23
no.6
/
pp.785-796
/
2023
The adoption of Environmental, Social, and Governance(ESG) practices in domestic construction firms is predominantly driven by major corporations. These companies not only publish reports on their ESG management but also engage in a meticulous process of identifying key issues and setting priorities. This process entails an in-depth evaluation of the severity of various issues and the gathering of insights from experts in the field. Interestingly, a comparative analysis of ESG assessments for construction companies, both domestically and internationally, reveals significant discrepancies in outcomes. These differences stem from the varied evaluation methodologies and criteria employed by different assessing bodies. Addressing this gap, our study proposes a suite of strategies aimed at bolstering ESG management within the construction sector. We advocate for enhanced policy support and financial backing, especially targeting small and medium-sized enterprises(SMEs) to facilitate their engagement in ESG practices. A critical step forward involves the standardization and transparent disclosure of ESG evaluation criteria, tailored to reflect the unique aspects of the construction industry. Moreover, the standardization and publication of ESG assessments for subcontractors are essential, equipping them with the necessary tools for effective ESG management and evaluation. Given the global nature of construction projects, particularly those commissioned by the European Union in regions like Africa and East Asia, adherence to ESG standards is imperative. Our long-term vision includes the development of a comprehensive database detailing ESG regulations and their impacts, segmented by region and country. This repository will serve as a valuable resource for companies venturing into international construction projects.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.262-267
/
2008
The domestic construction market started to expand steadily since 1970s. The building market which utilizes a sandwich panel with advantages of economical construction expenses and convenient construction has grown rapidly in recent years. However, the companies which specialize in constructing sandwich panels are relatively small or medium size, compared with other construction companies. As a result, studies on the improvement of productivity have not been conducted sufficiently. In this study, the construction sites of sandwich panel are investigated, and the work processes by each team are analyzed. Additionally, the productivity and the construction cost of each construction team are analyzed by constructing a model using the Web-Cyclone. It is expected that the results of this study can be applied to estimate the productivity and the construction cost of a sandwich panel construction that is appropriate for the on-site characteristics of small and medium sized construction companies in Korea. Also, similar processes can be simulated based on the modeling constructed in this study.
Proceedings of the Korean Society of Disaster Information Conference
/
2017.11a
/
pp.183-184
/
2017
최근 사회 환경의 변화를 보면 혁신 기업도시 건설 등으로 인한 전국토의 도시화 및 도시구조물의 초고층화 및 밀집화 등으로 대형 재난발생의 가능성이 증가하고 있으며, 지구환경 변화에 따른 기상이변으로 인해 재해규모가 대형화 되는 추세이다. 이와 더불어 고령화 사화 도래와 생활수준의 향상으로 복지정책 강화와 재난에 대한 서비스 강화 요구가 증대되고 있는 실정이다. 이러한 재난환경의 변환은 기존 소방훈련 패러다임의 변화에 부응할 수 있는 보다 실질적이며, 다양한 재난상태에 대한 대응능력을 강화시킬 수 있는 훈련을 요구하게 된다. 본 연구에서는 재난환경의 변화와 교육 및 훈련 패러다임 변화에 부응할 수 있는 소방훈련을 국내외 현황분석을 통해 도출하여 향 후 소방훈련 시설 설계에 기준이 되도록 훈련 방안을 제시한다.
Jong-Hyeok Park;Sang-Hyun Yoo;Soo-Hee Han;Kyeong-Jun Kim
The Journal of the Korea institute of electronic communication sciences
/
v.19
no.1
/
pp.119-126
/
2024
In building information model (BIM), it is difficult to train an artificial intelligence (AI) model due to the lack of sufficient data about individual projects in an architecture firm. In this paper, we present a methodology to correctly train an AI neural network model based on a large language model (LLM) to predict the steel structure product weight ratios in BIM. The proposed method, with the aid of the LLM, can overcome the inherent problem of limited data availability in BIM and handle a combination of natural language and numerical data. The experimental results showed that the proposed method demonstrated significantly higher accuracy than methods based on a smaller language model. The potential for effectively applying large language models in BIM is confirmed, leading to expectations of preventing building accidents and efficiently managing construction costs.
Park, Kyoung-Ah;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
Korean Journal of Construction Engineering and Management
/
v.9
no.5
/
pp.137-148
/
2008
Using PMIS(Project Management Information System) plays an important role in systematically planning and effectively managing the complex and large-sized construction projects. In spite of the importance of PMIS, on-site engineers, who are the main users of PMIS, have not used PMIS enthusiastically because PMIS has been evaluated and improved by not the viewpoint of the system users but the viewpoint of system managers and head office manager. Therefore, this study developed an assessment model to evaluate PMIS with the viewpoint of the on-site engineers, so previously developed PMIS can be evaluated by the on-site engineers with importance and satisfaction elements. It is anticipated that the effective use of the developed assessment model might increase the utilization of existing PMIS as well as develop the construction industry.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.105-116
/
2017
In recent years, large Korean construction companies have suffered serious losses in their overseas business. Many practitioners and researchers have analyzed causes of cost overrun in these projects. However, these arguments have not been empirically verified based on acutal project cases. This study investigated cost overrun rate, contingency, allowance, predicted risk before bidding, and actual and residual risk after award in the 67 international infrastructure projects conducted by 13 large construction companies. The causes of cost overruns are derived as follows. First, they identified the possibility of cost overrun to some extent before the bidding, but did not reflect the enough risk money to bid price. In particular, this behavior was more severe in badly cost-overrun projects. Second, the causes of cost overrun were more influenced by external environmental risk than internal capability risk. However, the internal risk in badly cost-overrun projects was relatively high compared to cost-underrun projects. Third, badly cost-overrun projects failed to mitigate risk. However, cost underrun projects were affected more by low exterior risk conditions than by well mitigated risk. This study provides more informed knowledge in controlling project costs in international infrastructure projects.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.8
/
pp.147-156
/
2016
This study analyzed the impact of changes in the construction business on construction company insolvency according to their size using the vector error correction model. First, this study applied EDF (Expected Default Frequency), which was calculated by KMV (Kealhofer, McQuown and Vasicek) model, as a variable to indicate the insolvency of construction companies. This study set 30 construction companies listed to KOSPI/KOSDAQ for estimating the EDF by size and construction companies were divided into two groups according to their size. To examine the construction business cycles, the amount of construction orders according to the type-residential, non-residential, and civil work- was used as a variable. The serial data was retrieved from TS2000 established by the Korea Listed Companies Association (KLCA), Statistics Korea. The analysis period was between the second quarter of 2001 and fourth quarter of 2015. As a result of calculating the EDF of construction companies by size, as it is generally known, the large-sized construction companies showed lower levels of insolvency than relatively smaller-sized construction companies. On the other hand, impulse response analysis based on VECM confirmed that the level of insolvency of large-scaled companies is more sensitive to business fluctuations than relatively smaller-sized construction companies, particularly changes in the residential construction market. Hence it is a major factor affecting the changes in insolvency of large-sized construction companies.
Journal of the Korea Institute of Construction Safety
/
v.5
no.1
/
pp.17-24
/
2023
The purpose of this study is to clearly recognize critical issues and to suggest relevant solutions for the issues since too many deaths and injuries due to industrial accidents has been going on for a long time, also the deaths of workers is a problem that affects not only one person's death but also many people connected with it and society as a whole. And the need for a strict Serious Accidents Punishment Act is sympathetic. However, the current Severe Accident Punishment Act is not welcomed by both labor and management due to its ambiguity, and it is suggested that the punishment and legislative content of the management manager who violated the duty to ensure safety and health is abstract and the level of punishment is excessive. In addition, due to the ambiguous part of the management manager's interpretation and serious industrial accidents, most companies appoint large law firms to receive legal interpretation and advice, so only law firms are getting full, and the cost that companies invest to protect the CEO is actually a safety accident. It is suggested that the current enforcement ordinance, which has ambiguity, needs to be revised because it must be entered into as a preventive cost.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.