Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

A Case Study on Risk Analysis of Large Construction Projects (대형건설공사의 리스크 분석에 관한 사례적용연구)

  • Kang In-Seok;Kim Chang-Hak;Son Chang-Baek;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.98-108
    • /
    • 2001
  • This research proposes a new risk analysis model in order to guarantee successful performance of construction projects. The risk analysis model, called Construction Risk Analysis System(CRAS), is introduced to help contractors Identify project risks through RBS and through the procedures in risk analysis model. The proposed CRAS model consists of three phases. First step, CRAS model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector - (현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로-)

  • Chung Myung-Woo;Lee Hwa-Young;Seo Yong-Chil;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2001
  • Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.

  • PDF

Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project (BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발)

  • Chung, Suwan;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • Previous studies reveal the need for a tool to cost estimation of building design in early design stages. This paper proposes an internal finishes cost model tool to address this need. The tool allows users to evaluate the functionality, economics and quality of finishes concurrently with high-rise building design. Lack of information in the early stages of the project enables a relatively accurate estimates of work to raise up. Measurements are automatically extracted from simple design information and profile driven estimates are revised in real-time. The data model uses a flexible unit rate system that can easily be extended to other estimate dimensions such as mix-use building surcharge rate estimation. The approach illustrated in this paper is applicable to BIM tool conceptual estimation that support for massing purposes other than the one chosen for this study.

A Case Study on Owner's Loss Incurred due to the Financial Cost of Public Construction Works in Korea (국내 공공공사에서 발주자 손실의 금융비용 사례연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.136-145
    • /
    • 2008
  • Occasionally an owner of public construction work pays financial costs in addition to progress payments. However, the overall scale of financial costs are not known. This research examines, based on a case study, the financial cost incurred in public construction works and the following issues: the overall scale of financial costs, the impact on financial costs on the owner, and the impact of timing on the overall sum of the financial costs. Annually, more than 2.3 trillion KRW are paid as progress payments for public construction work; yet, there is no research data showing the scale of financial costs thus incurred. The purpose of this research is to illustrate the scale of financial costs incurred due to progress payments for public construction works, and to suggest alternatives that would improve relevant regulations.

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

Research on the Normalization Schemes for Insolvent Development Site on Mutual Savings Banks (상호저축은행 부실PF사업장 정상화 방안)

  • Shin, Jong-Chil;Baik, Min-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.1
    • /
    • pp.195-204
    • /
    • 2015
  • This study analyzed the normalization cases of the mutual savings bank insolvency PF (MSBIPF) to suggest the appropriate improvements according to the purpose. The results were as follows. First, the original intention to normalize the MSBIPF was unsuccessful. This may be caused by the daunting situation of the real estate market along with the complex and shared interests. On the other hand, it can be responsible for the lack of evidence and related regulations as well as the lukewarm attitude on public projects. Active institutional settings are warranted to compensate the remaining insolvent businesses to PF even today and in the future. The data related to the recognized sites as the poorest 32 PF sites was compared primarily to normalize by KAMCO and the relevant sites. The area variable was the only significant variable according to the correlation analysis and logit analysis. The direct investment, diverse PF-backed bonds and the activation of the Ritz can be suggested as alternative ways of normalization with respect to the issue of the KAMCO.

Quantity-based Early Cost Estimation Model for Road Construction Projects (대표물량 기반의 도로공사 설계단계의 개략공사비 예측모델)

  • Kim, Du Yon;Kim, Byungil;Yeo, Donghoon;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.373-379
    • /
    • 2009
  • Cost estimation in the early phase enables government to plan public budgeting more efficiently by providing information about construction cost. However, cost estimation in the early phase is difficult to predict because only a little information can be utilized. The cost estimation method now being used by the government is calculated by length of the road multiplied by unit cost per length and shows high error rate because it cannot reflect the unique characteristics of each project. As the project is being proceeded, level of available information also changed. So, reflecting available information of a project is important. This paper divided early phase into two parts : planning phase and early design phase, and developed cost estimation model considering level of available information of each phase. Total 143 cases are utilized to find influencing variables and develop cost estimation model and model validation is done by adopting required accuracy level. This cost estimation model reflecting level of available information can be applied to public budgeting, feasibility test, and comparison between routes.

The Necessity of Introducing Development Fee for Archaeology and Suggestions (매장문화재부담금제도의 도입 필요성과 방안)

  • Kim, Gwon Gu
    • Korean Journal of Heritage: History & Science
    • /
    • v.49 no.3
    • /
    • pp.224-239
    • /
    • 2016
  • This article aims to review the major problems of the present Korean management system of archaeology and to seek desirable suggestions in order to pursue the sustainable harmony between the recovery of academic excavations and economic development. In order to continue the sustainable harmony between preserving the values of archaeological resources as limited pure public goods and economic development, the present system of developer's payment for archaeology must be replaced by the introduction of the development fee for archaeology. The excavation of archaeological resources have been done according to the market principle, that is, the lower price principle. But the principle has produced a lot of serious problems in the Korean management system of archaeology, which must result in the market failure. So the governmental intervention is urgently required. By introducing the development fee, the archaeological field units and the developers can avoid direct contact. Instead, the Heritage Management Office will operate the excavation fund raised by the development fee for archaeology in order to avoid low-price contracts, degrading excavation quality, and other related residents' complaints and social conflicts in advance. In addition, the budget for purchasing the preserved excavation sites, which are the source of the landowners' enormous complaints, must be allocated to the Heritage Management Office by the Ministry of Planning and Finance. More budget for small-sized excavations must be allocated as well in order to solve many residents' complaints. These budget increase will be the fundamentals to decrease the residents' big complaints and social conflicts in relation with the archaeological management, which will be a challenge of the Korean government. Along with the governmental efforts, the archaeological field units must do their all-out efforts to overcome many problems in excavation including low-price contracts. Finally, the wage system and working status system must be revised. Excellent young excavators must be recruited appropriately and continue to work in a safe psychological condition, which are the basis to guarantee high-quality excavation.