• Title/Summary/Keyword: 대심도 복층터널

Search Result 29, Processing Time 0.027 seconds

A study on the maintenance methods of the multi-purpose double-deck tunnel (다목적 터널의 기능별 유지관리 방법에 대한 고찰)

  • Moon, Hoon-Ki;Song, In-Cheol;Kim, Jae-Won;Lee, Hye-Yoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.1
    • /
    • pp.83-93
    • /
    • 2017
  • Recently, the development of multi-purpose tunnel that has functions of roads and waterways has been attention for efficient utilization of underground space. However, there is no study on the multi-functional tunnels behavior for the convert of iterative function and change of water pressure. In this study, the vulnerable section was analyzed due to repeated functional change. A basic review was implemented for the operation of the multi-purpose double-deck tunnel. Also, the vulnerable section for convert of iterative function of multi-functional tunnel has been analyzed by simulation. Management of multi-functional tunnel should considered in various analyzed and some problems. The criteria for management of multi-functional tunnels is proposed.

Effect of widening excavation in divergence section of a double-deck tunnel on its stability (복층터널 분기구 확폭구간 굴착에 따른 안정성 영향)

  • La, You-Sung;Kim, Yunhee;Lee, Kangil;Kim, Yongseong;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.435-450
    • /
    • 2020
  • The divergence section of a double-deck tunnel can be divided into a 'widening pre-divergence section', a large cross-section with a cap shape and a 'post-divergence section' where the separation between the main and the branch tunnel is made. Since the cross-section of the widening pre-divergence section is considerably larger than that of the post-divergence section, the influence of excavation due to the different sizes and shapes in the cross-section should be considered in the examination of the tunnel stability. In this study, the effect of the preceding excavation, that is the excavation of the widening pre-divergence section, on excavation stability of the post-divergence section was examined by varying the excavation methods and bench lengths through 3D finite element analysis. The results showed that although the effects of the excavation methods and the bench lengths are not significant on the variation of principal stresses, the preceding excavation causes a relatively large variation on the stresses which may have an impact on the stability of the post-divergence section from the comparison of Stress-Strength Ratio (SSR) between the cases with and without the consideration of the preceding excavation effect by 2D finite element analysis.

The study on application of automatic monitor system for initial fire suppression in double-deck tunnel (대심도 복층터널 초기화재 진압을 위한 자동모니터 소화설비의 적용성 연구)

  • Yoo, Yong-Ho;Park, Sang-Heon;Han, Sang-Ju;Park, Jin-Ouk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.419-429
    • /
    • 2016
  • In a bid to avoid the economic loss resulting from traffic jam in urban area, a deep underground road at 40 m depth has been considered and the first class disaster prevention facilities shall be applied according to domestic guideline. Automatic-monitoring fire extinguishing system designed to use for fire fighting has been widely applied at home and abroad. Recently development and commercialization through theoretical and experimental research to apply to road/railroad sector have been underway. Based on such performance of automatic fire extinguishing system, technical/economic analysis of existing water spray systems was conducted and as a result, it has demonstrated the superiority in terms of fire suppression as well as in cost efficiency. Then to commercialize this system, more diverse studies that will incorporate the characteristics of domestic tunnels are needed and should the system be promoted through institutional improvement, it's expected to become one of the advanced nations with own original technology in a life safety system industry throughout the world.

Effect of Separation Between Main and Divergent Tunnels in Divergence Section of Double-Deck Tunnel on the Stability (복층터널 분기구에서의 터널 이격에 따른 안정성 영향)

  • La, You-Sung;Kim, Bum-Joo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.2
    • /
    • pp.45-54
    • /
    • 2016
  • Double deck tunnels are considered to have a large demand in a near future for solving traffic congestion problems and overcoming the limitations in constructing new tunnels. This study presents a numerical investigation using finite element (FE) analysis on the behaviors of the tunnels and the stability of pillars in a divergence section where single tunnel is diverged from a main line double deck tunnel. The effects of the separation distance between the diverged and the main tunnels and the ground condition were examined through the FE analysis by varying the separation distance from 0.1D to 2.0D (D: diameter of main tunnel) and the rock class from class I to V, respectively, and the analysis results were compared with those using empirical methods, strength-stress ratio, and the volume of interference. The FE analysis results indicated that the separation distance has a larger effect on tunnel behaviors, compared with the rock strength, and a single tunnel with a large cross section is more favorable than two separated tunnels for tunnel stability when the separation distance is below 0.7D.

A study on the selection of optimal cross section according to the ventilation system in TBM road tunnels (TBM 도로터널의 환기방식에 따른 최적단면 선정에 관한 연구)

  • Lee, Ho-Keun;Kang, Hyun-Wook;Kim, Hyun-Soo;Kim, Hong-Moon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.135-148
    • /
    • 2013
  • Recently, road tunnels have become longer and the plans for long and deep road tunnel have been underway in urban areas. These long and deep tunnel excavations include NATM and TBM. Shield TBM is applied to around 80% of traffic tunnels in Europe, and approximately 30% of them in other developed countries. However, as much of equipment is imported from foreign countries at high prices and distribution rate of TBM tunnel is considerably low in Korea, NATM excavation method is commonly used. To increase TBM tunnel, it is necessary to do assure economic feasibility with the supply-demand of TBM equipment. For this, the selection of standardized TBM diameter is urgently needed. Therefore, the study aims to estimate the standardized optimum section properties of TBM by examining TBM excavation cross section utilization depending on the volume of traffic, the number of lane and its cross-section type(single or double deck), and ventilation system.

A study on the program development for area optimizing of damper ports in road tunnels with transverse ventilation system (횡류식 도로터널의 급, 배기구 포트 개구면적 최적화 프로그램 개발 연구)

  • Jo, Hyeong-Je;Chun, Kyu-Myung;Min, Dea-Kee;Kim, Jong-Won;Beak, Jong-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.177-188
    • /
    • 2019
  • The purpose of the optimization of the installation of supply/exhaust ports for tunnels with transverse ventilation system is to supply fresh air from outside to inside of tunnels uniformly and exhaust pollutant from tunnels properly for creating safe and clean environment for tunnel users. For this purpose, a ventilation port area optimization program was developed to obtain a uniform supply or exhaust air volume inside a great depth double deck tunnel with transverse ventilation system. In order to area optimize the developed port sizing program, the wind velocity was measured in the duct of the currently operated tunnel with semi-transverse ventilation. Also 3D cfd was performed on the same tunnel and cfd results were compared to the measured value. As a result, the error rate between the predicted value from the program and measured value was 6.72%, while the error rate between the predicted value from the program and 3D cfd analysis value was 4.86%. Both of comparison results show less than 10% of error rate. Thus It is expected that supply/exhaust port optimization design of transverse ventilation tunnel can be possible with using this large exhaust port area optimization program.

A Design Focuses on the Internal Structure of Double-level Tunnel (도심지 대심도 복층터널의 내부구조물 계획)

  • Park, Shin-Young;Jeong, Jae-Ho;Cho, Nam-Kak;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1314-1321
    • /
    • 2010
  • The west express way which links south west area of the central city of Seoul has been notorious for extremely heavy traffics since its first opening in 1991(i.e. the average vehicle speed is less than 25km/h, a daily traffic is 112,000 and among them, more than 94% of the vehicles are the light vehicles). The city government recently initiated a new BTO(Build-Transfer-Operate) project as an alternative in releasing heavy traffic and a high construction cost. The proposed underground express road is the first double-level tunnel (i.e. a total length of road is 10,91km and the tunnel is 9.308km long) ever built in South Korea, while such tunnel system is not new worldwide as such A86 East tunnel in France, SMART tunnel in Malaysia, and Fuxing tunnel in China. This paper discusses major design issues regarding the internal structures such as deck slab, and secondary liner.

  • PDF

A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea (국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례)

  • Kim, Gyoung-Hun;Choi, Jun-Dong;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

Reinforcement of shield tunnel diverged section with longitudinal member stiffness effect (종방향 부재의 강성효과를 고려한 쉴드 터널 분기부 보강 및 해석기법)

  • Lee, Gyu-Phil;Kim, Do
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.5
    • /
    • pp.675-687
    • /
    • 2019
  • In recent years, the needs for double deck-tunnels have increased in large cities due to the increase in traffic volume and high land compensation costs. In Korea, a network type tunnel which is smaller than general road tunnels and crosses another tunnel underground is planned. In the shield tunnel joints between the existing shield tunnel and the box-type enlargement section, a partial steel-concrete joint is proposed where the bending moment is large instead of the existing full-section steel joint. In order to analysis the enlargement section of the shield tunnel diverged section to reflect the three-dimensional effect, the two-dimensional analysis model is considered to consider the column effect and the stiffness effect of the longitudinal member. A two-dimensional analysis method is proposed to reflect the stiffness of the longitudinal member and the column effect of the longitudinal point by considering the rigidity of the longitudinal member as the elastic spring point of the connecting part in the lateral model. As a result of the analysis of the model using the longitudinal member, it was considered that the structural safety of the partial steel-concrete joint can be secured by reducing the bending moment of the joint and the box member by introducing the longitudinal member having the stiffness equal to or greater than a certain value.