• Title/Summary/Keyword: 다중복합프로젝트

Search Result 8, Processing Time 0.023 seconds

A Platform Design Study of Intelligent Program Management Information System (iPMIS) (지능형 종합사업관리 시스템 플랫폼 디자인 방안에 관한 연구)

  • Yeom, Ji-Woong;Kim, Ju-Hyung;Ahn, Byung-Ju;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.716-719
    • /
    • 2008
  • Yongsan International business Center, Incheon Songdo City, Roppongihill sand Midtown, including the most of latest internal and external construction projects become larger and more complicated than before. Mega project is one of most complicated project type as public and private sectors involve and the space will be construed in all directions i.e. horizontal, vertical, underground and ground. Therefore mega projects need a new program management information system to start the project's success. So this paper proposes a platform design study to intelligent program management information systems to mange mega projects.

  • PDF

Development of intranet-based Program Management Information System of multi-complex project with application of BIM (BIM을 활용한 다중복합 프로젝트의 인트라넷 기반 통합사업관리체계 구축 방안)

  • Song, Il-Bab;Hur, Young-Ran;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 2012
  • Public construction projects need complex and multi-functional management skill, since the most of public construction projects are comprised of multi-project and mega-projects. In order to effectively manage construction projects, PMIS is widely used. However the majority of the current PMIS have been developed as a single project-oriented business management system. Thus compatibility problems are encountered during the process of integrating the entire systems to manage the multi-complex projects. In addition, the form of orders applying BIM are increased recently, but the research and development of BIM based PMIS are still lacking. In this study, therefore, the functions of PMIS main objectives based on the analysis of PMIS As-Is and To-Be of PMIS, the dual management system utilizing Internet and Intranet will be proposed to integrate the individual PMIS with Integrated Program Management System. Rather than combining commercial BIM tool and PMIS directly, which is the common method of failure, the sequential process model to adopt BIM based PMIS is also explained. Step-by-step development method of BIM based PMIS is suggested to prepare for the activation of BIM technology in the nearest future.

Proposal of Git's Commit Message Complex Classification Model for Efficient S/W Maintenance (효율적인 S/W 유지관리를 위한 Git의 커밋메시지 복합 분류모델 제안)

  • Choi, Ji-Hoon;Kim, Jae-Woong;Lee, Youn-Yeoul;Chae, Yi-Geun;Kim, Joon-Yong
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.07a
    • /
    • pp.123-125
    • /
    • 2022
  • Git의 커밋 메시지는 프로젝트가 진행되면서 발생하는 각종 이슈 및 코드의 변경이력을 저장하고 관리하고 있기 때문에 소프트웨어 유지관리와 프로젝트의 생명주기와 밀접한 연관성을 갖고 있다. 이러한 Git의 커밋 메시지에 대한 정확한 분석 결과는 소프트웨어 개발 및 유지관리 활동 시, 시간과 비용의 효율적인 관리에 많은 영향을 끼치고 있다. 이에 대한 기존 연구로 Git에서 발생하는 커밋 메시지를 소프트웨어 유지관리의 세 가지 형태로 분류하고 매핑하여 정확한 분석을 시도하려는 연구가 진행되었으나, 최대 87%의 정확도를 제시한 연구 결과가 있었다. 이러한 연구들은 정확도가 낮아 실제 프로젝트의 개발 및 유지관리에 적용하기에는 위험성과 어려움이 있는 현실이다. 본 논문에서는 커밋 메시지 분류에 대한 선행 연구 조사를 통해 각 연구들의 프로세스와 특징을 추출하였고, 이를 이용한 분류 정확도를 높일 수 있는 커밋 복합 분류 모델에 대해 제안한다.

  • PDF

Implementation of Git's Commit Message Complex Classification Model for Software Maintenance

  • Choi, Ji-Hoon;Kim, Joon-Yong;Park, Seong-Hyun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.11
    • /
    • pp.131-138
    • /
    • 2022
  • Git's commit message is closely related to the project life cycle, and by this characteristic, it can greatly contribute to cost reduction and improvement of work efficiency by identifying risk factors and project status of project operation activities. Among these related fields, there are many studies that classify commit messages as types of software maintenance, and the maximum accuracy among the studies is 87%. In this paper, the purpose of using a solution using the commit classification model is to design and implement a complex classification model that combines several models to increase the accuracy of the previously published models and increase the reliability of the model. In this paper, a dataset was constructed by extracting automated labeling and source changes and trained using the DistillBERT model. As a result of verification, reliability was secured by obtaining an F1 score of 95%, which is 8% higher than the maximum of 87% reported in previous studies. Using the results of this study, it is expected that the reliability of the model will be increased and it will be possible to apply it to solutions such as software and project management.

Evaluation of Land Surface Model Ensemble GLDAS for drought monitoring (가뭄감시를 위한 지면모델 앙상블 GLDAS의 활용성 평가)

  • Park, Junehyeong;Kim, Moon-Hyun;Park, Hyang Suk;Kim, Yeon-Hee;Kim, Baek-Jo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.227-227
    • /
    • 2016
  • 일반적으로 가뭄은 신뢰성 높고 활용이 쉬운 강수량 자료를 활용하여 판단되고 있으나, 복합적인 대응을 하기 위해서는 증발산량, 토양수분 등 다양한 변수를 고려해야 한다. 이러한 수문기상정보들은 관측자료의 자료 확보기간이 통계 분석을 하기에 짧거나, 시공간적 대표성 부족 등의 단점이 있다. 이러한 문제점을 극복하기 위해 지면모델이 대안으로 널리 활용중이나, 이를 실제로 가뭄에 활용한 응용연구는 상대적으로 부족한 실정이다. 본 연구에서는 미국 NASA의 전지구지표자료동화체계 GLDAS (Global Land Data Assimilation System) 산출물을 활용하여 지면모델 기반의 수문기상정보를 국내 가뭄감시 연구에 적용하고자 하였다. 이를 위해, GLDAS 프로젝트를 통해 제공되는 다중모델 기반의 증발산량, 토양수분 결과를 비교 분석하고 이를 직접 활용할 수 있는 가뭄판단 지수에 적용하여 성능을 검토하였다. 이를 통해 GLDAS 산출 정보가 가뭄판단에 있어 발휘하는 성능을 평가함으로써, 향후 본원에서 구축할 지면 모델 앙상블 시스템의 가뭄감시정보 산출의 효과를 간접적으로 검토하고자 한다.

  • PDF

A Study on Improving Concrete Quality Control using Customized Checklist (맞춤식 체크리스트를 응용한 콘크리트 품질관리 개선방안)

  • Park Sangmin;Kim Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.53-62
    • /
    • 2000
  • A concrete element is obtained through multi-steps, and its quality is affected by site conditions and control constituents of procedures. In these regards, in order to assure designed qualities of concrete and associated materials of the element good quality control method is necessary in various procedures. The existing quality control measures do not satisfy the requirements for the quality control activities at each production step. This study provides a more effective checklist for each phase of concrete work, which improves existing quality control checklist through extensive research on current practices and surveys from expertises. This paper also proposes the application of multi-facet codes to develop a customized checklist to improve the efficiency in field practices and the effectiveness in assuring the designed performance of concrete. This study finally provides a more effective checklist for each phase of concrete work by improving usability of the developed project sensitive matric quality control checklist through application experiments on construction project sites.

  • PDF

Decision Making Model using Multiple Matrix Analysis for Optimum Construction Method Selection (다중 매트릭스 분석 기법을 이용한 최적 건축공법 선정 의사결정지원 모델)

  • Lee, Jong-Sik;Lim, Myung-Kwan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.331-339
    • /
    • 2016
  • According to high-rise, complexation, and enlargement of buildings, various construction methods are being developed, and the significance of construction method selection about main work types has emerged as a major interest. However, it has been pointed out that hand-on workers cannot consider project characteristics carefully, and they lack an objective standard or reference for main construction method selection. Hence, the selection is being made depending on hand-on workers' experience and intuition. To solve this problem, various studies have proceeded for construction method selection of main work types using Artificial Intelligence like Fuzzy, AHP and Case-based reasoning. It is difficult to apply many different kinds of construction method selection to every main work type with consideration for characteristics of work types and condition of a construction site when selecting construction method in the field. Accordingly, this study proposed the decision-making model which can apply to fields easily. Using matrix analysis and liner transformation, this study verified consistency of study models applied in the process of soil retaining selection with a case study.

International Case Studies on the Eco-friendly Energy Towns with Hybrid Thermal Energy Supply System and Borehole Thermal Energy Storage (BTES) (친환경에너지타운에서 보어홀지중열 저장(BTES) 활용 융복합 열에너지 공급 시스템 사례 연구)

  • Shim, Byoung Ohan
    • Economic and Environmental Geology
    • /
    • v.51 no.1
    • /
    • pp.67-76
    • /
    • 2018
  • This study reviews three eco-friendly energy towns with hybrid thermal energy supply systems and borehole thermal energy storage (BTES) in Canada and Denmark. The district heating and cooling systems were designed by using multi-source energy for the higher efficiency and reliability as well as environment. ADEU (Alexandra District Energy Utility) located at the developing area in the city of Richmond, Canada was designed to supply district energy with the installation of 726 borehole heat exchangers (BHEs) and a backup boiler using natural gas. DLSC (Drake Landing Solar Community) located in the town of Okotoks, Canada is a district system to store solar thermal energy underground during the summer season by seasonal BTES with 144 BHEs. Brædstrup Solpark district heating system located in Denmark has been conducted energy supply from multiple energy sources of solar thermal, heat pump, boiler plants and seasonal BTES with 48 BHEs. These systems are designed based on social and economic benefits as well as nature-friendly living space according to the city based energy perspective. Each system has the energy center which distribute the stored thermal energy to each house for heating during the winter season. The BHE depth and ground thermal storage volume are designed by the heating and cooling load as well as the condition of ground water flow and thermophysical properties of the ground. These systems have been proved the reliance and economic benefits by providing consistent energy supply with competitive energy price for many years. In addition, the several expansions of the service area in ADEU and Brædstrup Solpark have been processed based on energy supply master plan. In order to implement this kind of project in our country, the regulation and policy support of government or related federal organization are required. As well as the government have to make a energy management agency associated with long-term supply energy plan.