• Title/Summary/Keyword: 노선선정기법

Search Result 63, Processing Time 0.024 seconds

Economical aessesment of long tunnel route complex geological formations (복잡한 지질구조암반층에서의 장대터널노선 선정을 위한 경제성 평가에 대한 연구)

  • Kim, Sang-Hwan;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.239-247
    • /
    • 2005
  • A new railway line of about 17km length was planned between Dongbaeksan and the neighboring town Dokye to improve the existing decrepit railway system. New line about 17km of the distance will almost be in circular alignment tunnels owing to the difference of elevation about 380m. Since the geology of the area is rather unusual compared to the normal in South Korea, extensive geological investigations have been carried out to prepare geological maps and profiles along the planned tunnel routes. The tunnel will almost be in sedimentary rock formations, such as limestone, sandstone, shale, coal etc and be near abandoned mines Various rock formations have the complicated, alter ed those rocks, but are well developed with laminated formations. Each rock formations have been classified using the Q-system and the cost of tunnel excavation, support has been estimated and compared for three alternative routes in the design stage. Based on these estimates, the final route of t he railway line was chosen.

  • PDF

A Study on Bicycle Route Selection Considering Topographical Characteristics (지형적 특성을 고려한 자전거 경로 선정에 관한 연구)

  • Yang, Jung Lan;Jun, Chul Min
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.21 no.3
    • /
    • pp.3-9
    • /
    • 2013
  • As interest in green growth picks up, the importance of bicycles which are an environment friendly means of communication has been magnified. However, bicycle routes which are the base of bicycles are designed without considering topographic elements and thus many users are experiencing inconvenience in using bicycles. The present study presents a routing technique to select optimal routes when selecting routes in commuting to school utilizing bicycles. To this end, a formula for optimum route calculation considering slope and intersections was drawn and a method to select optimum routes by applying modified Dijkstra Algorithms was studied. According to the results, the bicycle routes for commuting to school should be selected by the shortest time rather than the shortest distances to the destination, because it required reach the destination faster. Therefore when selecting the routes, it must be based on the shortest time considering waiting time due to crosswalks or crossroads and speed variations due to slopes.

A Study On Choosing The Most Suitable Roadline Using Digital Photogrammetry and GIS in Mountain Area (산악지역에서의 수치사진측량에 의한 DEM추출과 GIS를 이용한 3차원 도로시뮬레이션에 관한 연구)

  • Quan He-Chun;Lee Byung-Gul
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.24 no.1
    • /
    • pp.123-130
    • /
    • 2006
  • The purpose of the paper is to make the three dimensional road simulation model based on the digital photogrammetry and GIS techniques in the middle of Halla mountain of Jeju island. To do this, we generate DEM (digital elevation model) and digital ortho image using GIS tools such as Arc View, Imagestation and MGE module. In GIS, the overlay map schemes combining of the hill shade, the land slope and aspect were applied. Based on the processes, we can build the best three dimensional road line along the hill side of the island. From the results, we also found that the derived DEM from digital ortho image and the GIS technique were very useful for choosing the best three dimensional road design before the real road construction works in Jeju island.

Planning of Train Operation with Different Objectives Utilizing Mixed-Integer Nonlinear Programming Models (비선형정수계획법을 이용한 운행전략에 따른 열차운영계획 수립)

  • 김기현;서선덕
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.7
    • /
    • pp.117-133
    • /
    • 2002
  • 열차운영계획은 수송수요 산정, 운행노선계획, 열차시간표 작성 기관차 및 인원의 할당 등 광범위한 내용을 포괄하고 있으나, 본 논문에서는 계획의 초기단계에서 결정 가능한 운행노선계획을 대상으로 범위를 설정하였다. 운영목표에 따른 전략은 사용자, 운영자, 사회전체의 입장에서 고려될 수 있는데, 이러한 전략에 의해 운행 될 수 있는 열차운행패턴을 운영비용의 최소화, 통행시간의 최소화. 운영자 수익의 최대화 모형으로 해결하고자 하였다. 2004년 이후에 운행이 예상되는 고속철도/기존철도는 운영계획의 변경이 예상되는 바, 상기의 목표에 따라 열차운영패턴을 작성하여 개발된 효과척도의 적용을 통해 정책적인 적용가능성을 평가하였으며 기존 계획된 철도청의 운영계획과도 아울러 비교, 최적대안을 선정하였다. 본 고에서는 수리계획모형인 비선형정수계획모형(MINLP)으로서 국내 철도망에 부합하는 운영계획을 작성하였으며, 이에 따른 열차-km는 수익최대화 모형, 인-km는 철도청의 열차운영계획이 가장 많은 것으로 나타났다. 인-hour는 수익 최대화 모형과 통행시간 최소화 모형이 가장 적은 것으로 나타났는데, 이는 장거리 노선의 편성이 증가된 것으로 사료된다. 이러한 결과를 산출함에 있어. 어려운 점은 각 구간의 기하급수적 증가, 결정변수의 초기값 선정 등이 있으나, 그동안 연구된 각종 경험적 기법의 적용과 실제 편성 가능한 변수의 적용을 통해 이를 해결하였다. 추후 설정된 모형의 비교에 적합한 효과척도의 개발과 전국적으로 사례구간의 확장 및 모형의 최적대안 선택 시 효과척도의 가중치에 대한 연구가 필요할 것으로 사료된다.

Planning of Alternative Forest Road Network Using GIS (GIS를 이용한 대안별 임도노망의 계획에 관한 연구)

  • Jeon, Kwon-Seok
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.11 no.1 s.24
    • /
    • pp.21-28
    • /
    • 2003
  • This study was aimed at suggest a proper planning method to select a optimal forest road network in mountains forest using GIS(Geographic Information System). To examine the field applicability, the method was applied to the National Forest at Mt. Kumsan in Namhae-gun, Gyungsangnam-do. The main results from altogether six alternative road route plans were derived from these criteria obtained the alternative route plan No.2 has two layout criteria, longitudinal gradient and earth work volume, and it showed similar pattern of existing forest road network which was designed mainly ground slope and longitudinal gradient. The alternative route plan No.6 has four criteria, longitudinal gradient, earth work volume, investment effect and landscape impact. It was different for the lowest forest road density among the alternatives and the pattern of the forest road layout was radial form, which was also quite different to other alternatives. For optimal forest road network planning, GIS provide the efficient and resonable solutions for decision making to provide the support for evaluation about various alternative road networks. If detailed inventory and relevant data are provided and also clear and objective indicators for evaluations are set up, it could be applied to preliminary analysis and detail planning stage to prevent undesirable effect such the land slide and soil erosion due to inadequate planning for forest road network.

  • PDF

A Study on the Planning of Railway Route Adjacent to the Preservation Area of Cultural Assets (문화재 보호구역 주변 근접통과 구간의 철도노선 계획 사례에 대한 연구)

  • Roh, Byoung-Kuk;Kim, Jae-Bok
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.370-375
    • /
    • 2009
  • This study draws from the hands-on experience of designing railway routes that pass very close to the Cultural Heritage Protection Areas. There have been many cases where the rail route plan is rejected during the deliberation process of National Cultural Heritage Alteration although it has been selected as the best alternative after much time and expenses are spent and public consensus is obtained. When the route has to be realigned, this often leads to project delay and possible counter protest from the local public. In an effort to prevent such problems from occurring over again, this study looks at the projects where railways pass close to the Cultural Heritage Protection Areas. We examine the nature of public protests and the route selection process that reflects these protests into consideration. Based on the experiences drawn from these cases, we offer a few suggestions that we hope will contribute to the success of the project. The suggestions include the right timing for the application of Cultural Heritage Alteration and route alignment technique.

Three-Dimensional GSIS for Determination of Optimal Route (3차원 GSIS를 이용한 최적노선 선정)

  • Kang, In-Joon;Choi, Hyun;Park, Hun-Shik
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.11 no.1 s.24
    • /
    • pp.71-75
    • /
    • 2003
  • The highway is greatly changed by the constant economic growth for a long times the traffic situation such as the large volumes and the performance vehicles, the performance enlargement of vehicles, the high speedization, etc., due to growth economic. A study of an optimal route selection model is researched over late 1980s by development of computer and GSIS, and consisted including research about the optimal route that uses digital terrain model in domestic such as the earth volume calculations, the mass curve output and the automation system construction. Lately, the study of the driving simulation of the highway and the virtual reality using VGIS(Virtual Geographic Information System) is researched. This study shows when the alternative highway selection considered surrounding facilities, development plan and according to estimate amount of traffic and the additional possibility of view analysis and environment effect analysis element will study through 3D simulation method.

  • PDF

Generating Multiple Paths by Using Multi-label Vine-building Shortest Path Algorithm (수정형 덩굴망 최단경로 탐색 알고리즘을 이용한 다경로 생성 알고리즘의 개발)

  • Kim, Ik-Ki
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.2 s.73
    • /
    • pp.121-130
    • /
    • 2004
  • In these days, multiple-path generation method is highly demanded in practice and research areas, which can represents realistically travelers behavior in choosing possible alternative paths. The multiple-path generation algorithm is one of the key components for policy analysis related to ATIS, DRGS and ATMS in ITS. This study suggested a method to generate multiple Possible paths from an origin to a destination. The approach of the suggested method is different from an other existing methods(K-shortest path algorithm) such as link elimination approach, link penalty approach and simulation approach. The result of the multi-label vine-building shortest path algorithm(MVA) by Kim (1998) and Kim(2001) was used to generate multiple reasonable possible paths with the concept of the rational upper boundary. Because the MVA algorithm records the cost, back-node and back-back node of the minimum path from the origin to the concerned node(intersection) for each direction to the node, many potential possible paths can be generated by tracing back. Among such large number of the potential possible paths, the algorithm distinguishes reasonable alternative paths from the unrealistic potential possible paths by using the concept of the rational upper boundary. The study also shows the very simple network examples to help the concept of the suggested path generation algorithm.

Development of Route Selecting System based on GIS for Prior Environmental Review using AHP (AHP 기법을 활용한 GIS기반의 사전환경성검토 노선선정시스템 개발)

  • Kim, Sang-Seok;Jang, Yong-Gu;Yang, Seung-Tae;Kang, In-Joon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.2
    • /
    • pp.152-163
    • /
    • 2007
  • The on-going pre-environmental investigation at present is performed by separate numerical analysis of each provision which makes integrated pre-environmental investigation is difficult. The application of numerical data is insufficient, which results to the deterioration of environmental investigation result's objectivity. A lot of time and money is required for the investigation. In this study, the spacial analysis function of GIS was applied on the 8 pre-environmental investigation factors. Pre-environmental investigation GIS DMS(Decision Making System) using AHP was constructed to make integrated investigation possible through the use of investigation results for each factor. Through the use of the developed pre-environmental investigation GIS DMS and the pre-constructed GIS data, the objectivity of environmental investigation is sufficient and time and cost are reduced. Therefore, this system can be used for pre-environmental investigation during route selection in the initial stages of road construction. Through the numerical and visual data obtained from the system developed in this paper, it is easier to gain the approval of the public. Furthermore, environmental problems due to road construction can be investigated with less time and money during the initial stages of road construction.

  • PDF