• Title/Summary/Keyword: 노무량 예측

Search Result 5, Processing Time 0.018 seconds

A Manpower Forecasting Regression Model for Apartment House Construction Project based on the Historical Data (실적자료 분석을 통한 공동주택공사 노무량 예측 회귀모델)

  • Son, Yong-Seok;Shim, In-Bo;Kwon, Jae-Sung;Jeon, Sang-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.85-93
    • /
    • 2006
  • This study is started from a situation of korean construction which has been undergoing diversity. And risk of construction project has been increased recently. The purpose of this study is to propose the model which is able to estimate the proper manpower by eliciting the variable which is offered in the pre-design and construction phase. The existing method of estimate has a problem with calculating exact costs. For this model, it was analyzed the existing manpower estimating model and used historical data of 38 apartment houses, constructed from 2000 to now. Based on these, the regression model of the construction manpower was built. And then the regression model was verified. The result of verification was relatively adequate in the statistics exept for some cases. This regression model will help make it possible for constructor to estimate the deduction of retirement more accurate than existing method.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

Prediction for the Spatial Distribution of Occupational Employment by Applying Markov Chain Model (마르코프 체인 모형을 이용한 직종별 취업자의 공간적 분포 변화 예측)

  • Park, So Hyun;Lee, Keumsook
    • Journal of the Korean Geographical Society
    • /
    • v.51 no.4
    • /
    • pp.525-539
    • /
    • 2016
  • This study attempts to predict the changes in the spatial distribution of occupational employment in Korea by applying Markov Chain Model. For the purpose we analyze the job-related migration pattern and estimate the transition probability with the last six years job-related migration data. By applying the Chapman-Kolmogorov equation based on the transition probability, we predict the changes in the spatial distribution of occupational employment for the next ten years. The result reveals that the employment of professional jobs is predicted to increase at every city and region except Seoul, while the employment of elementary labor jobs is predicted to increase slightly in Seoul. In particular, Gangwon-do and Chuncheongdo are predicted to increase in the employment of all occupational jobs.

  • PDF

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

Development of Defect-Repair Method-Cost Mapping Algorithm of Concrete Bridge Using BMS Data (BMS 데이터를 활용한 콘크리트 교량의 결함-공법-비용 매핑 알고리즘 개발)

  • Lee, Changjun;Park, Wonyoung;Cha, Yongwoon;Jang, Young-Hoon;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.267-275
    • /
    • 2023
  • As aged infrastructures have been increased, the importance of accurate maintenance costs and proper budget allocation for infrastructure become prominent under limited resources. This study proposed a mapping algorithm between representative defects, repair methods, and the estimated maintenance costs for concrete bridges. In this regard, using BMS (Bridge Management System) data analysis, bridge repair methods were classified and matched with defects according to their locations, types, and sizes. In addition, the maintenance costs were estimated based on the amount of work-load and quantity per unit using CSPR (Cost Standard Production Rate). As a result, the level of accuracy was an average of 85.1 % compared with the actual bill of quantity for Seoul bridge maintenance. The accuracy of maintenance costs is expected to be enhanced by considering the various site conditions such as pier height, extra charge conditions, additional equipment, etc.