• Title/Summary/Keyword: 긴장력 측정

Search Result 52, Processing Time 0.029 seconds

Experimental Relationship between Electrical Impedance of a Steel Wire and Applied Stress, Temperature, and Excited Frequency (강선의 전기적 임피던스와 응력, 온도 및 주파수 사이의 실험적 관계)

  • Nguyen, Duy-Hung;Kim, Byeong Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.2
    • /
    • pp.183-189
    • /
    • 2020
  • This paper presents an experimental investigation regarding the sensitivity of electrical impedance of a steel wire to tensile stress, ambient temperature and induced frequency. For various stress levels and temperatures, the electrical impedance of a steel wire has been measured on a self-sensing system. The three experimental cases are carried out at various temperature conditions, stress levels and applied frequencies. If the temperature increases and stress level decreases at a given frequency, the electrical impedance on the steel wire increases. The results show that the correlation between electrical impedance and temperature is a linear relationship at all stress levels. It is noted that the sensitivity of impedance to temperature is much higher than the stress.

Estimation of Vertical Load Capacity of PCFT Hybrid Composite Piles Using Dynamic Load Tests (동재하시험을 통한 긴장력이 도입된 콘크리트 충전 강관말뚝을 사용한 복합말뚝의 연직지지력 평가)

  • Park, Nowon;Paik, Kyuho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.3
    • /
    • pp.31-38
    • /
    • 2019
  • To determine the optimum dynamic load test analysis for PCFT (Prestressed Concrete Filled steel Tube) hybrid composite piles that PCFT piles are connected to the top of PHC piles, the dynamic load tests and CAPWAP analyses were performed on two hybrid composite piles with steel pipe and PCFT piles as upper piles. The results of the dynamic load tests and CAPWAP analyses showed that the particle velocity measured in PCFT hybrid composite piles was equal to the wave speed of PHC piles when the strain gauges and accelerometers are attached to the surface of inner composite PHC pile after removing the steel pipe in the upper PCFT pile. In addition, when assuming that the material of that upper PCFT pile was the same as that of the lower PHC pile and the cross-sectional area of the steel pipe in upper PCFT pile was converted to that for concrete through the pile model (PM) in CAPWAP analysis, the accuracy of the CAPWAP analysis result for PCFT hybrid composite piles was very high.

A Study on the Effect of Neurofeedback Traing on the hearing impairments Student about Resistance Stress (청각장애 학생들의 일상적 스트레스 저항능력에 뉴로피드백 훈련이 미치는 영향 분석 연구)

  • Bak, Ki-Ja
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3318-3324
    • /
    • 2010
  • This study was to examine the effectiveness of neurofeedback training by observing the pre and post brainwave measurement results of about 16(Primary Student 6, middle school student10) student who have shown resistance stress and body stress, mental stress. The study was examined at S city M dong A hearing impairments student, from Mar. 2008 and to Feb. 2009. The methodology used in the study is the Coloring Analysis Program of the Brain Quotient Test. As the brain waves are adjusted by timeseries linear analysis, the brain function quotients can reflect the functional states of the brain. The training took place two times a week, for about 40 minutes per session. The result confirmed the differences of both resistance stress quotient and body stress, mental stress. The results of the analysis show that neurofeedback training plays positive role in changing the brain function. Therefore, the result of the study shows that there is possibility that Neuro Feedback technique might be positively affecting resistance stress of the hearing impairments student, relationship between neurofeedback training and stress among several categories.

Reproducibility of non-invasive measurement for left ventricular contractility using gated myocardial SPECT (게이트 심근 SPECT를 이용한 비침습적 심실 수축력 측정방법의 재현성)

  • Kim, Kyeong-Min;Lee, Dong-Soo;Kim, Yu-Kyeong;Cheon, Gi-Jeong;Kim, Seok-Ki;Chung, June-Key;Lee, Myung-Chul
    • The Korean Journal of Nuclear Medicine
    • /
    • v.35 no.3
    • /
    • pp.152-160
    • /
    • 2001
  • Purpose: We tried to establish the reproducibility of the measurement of maximal elastance (Emax) and to compare the degree of the reproducibility of two estimation methods: single pressure-volume loop method and parameter optimization method. Materials and methods: In 47 patients (42 males and 5 females, $53{\pm}10$ years old) with suspected coronary artery disease (election fraction; 22-68%), gated Tc-99m MIBI myocardial SPECT and arterial tonometry were acquired. In 11 patients among these 47 patients, gated SPECT and tonometry were performed twice consecutively with patients in situ. Emax and void volume (Vo) were estimated using single pressure-volume loop method of Lee and parameter optimization method based on linear approximation of Yoshizawa. Correlation between the consecutive measurements by each method and correlation between the two estimation methods were compared. Results: Reproducibility of Emax (r=0.96) and Vo (r=0.99) by single pressure-volume method was better than the reproducibility of Emax (r=0.89) and Vo (r=0.64) by parameter optimization method. Correlations of Emax and Vo were fair between the two methods. The correlation of Emax (r=0.77) was better than that of Vo (r=0.55). Conclusion: Reproducibility of Emax measurement by single pressure-volume loop method using gated myocardial SPECT and arterial tonometry was excellent. Reproducibility by parameter optimization method was also fair but was less than that achieved by single pressure-volume method.

  • PDF

Estimation of Flexural Strength of Hollow Prestressed Concrete Filled Steel Tube Piles (긴장력이 도입된 중공형 콘크리트 충전 강관말뚝의 휨강도 산정)

  • Paik, Kyu-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.12
    • /
    • pp.91-100
    • /
    • 2019
  • Hollow prestressed concrete-filled steel tube (HCFT) piles, which combines PHC piles inside thin-wall steel tubes, were developed to increase the flexural strength of the pile with respect to the lateral load. Since P-M curves are needed for evaluating the structural safety of piles when applying HCFT piles to fields, equations for plotting P-M curves of HCFT piles in limit states were proposed. When the yield strength is applied to the steel tube and PC steel bar of HCFT piles, the proposed equations significantly underestimated the flexural strength of HCFT piles. Unlike the flexural strength test results, the proposed equations also provide greater flexural strengths for 12 mm thick steel pipe piles with the same diameter than for HCFT piles. However, when the ultimate strengths are used instead of the yield strengths for the steel tube and PC steel bar, the proposed equations provide the flexural strengths very close to the flexural strength test results.

Evaluation of Reinforcement Effect of Deteriorated PSC Beam through Cutting Its External Tendons (외부강선 파단실험을 통한 노후 PSC 교량의 보강효과 평가)

  • Park, Chang-Ho;Lee, Byeong-Ju;Lee, Won-Tae;Ku, Bon-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.3
    • /
    • pp.178-186
    • /
    • 2005
  • In this study, the PSC girder bridge retrofitted with external tendons is tested to verify the strengthening effects. We measure the variations of the displacement and strain at mid-span of each beam as external tendons are removed in sequence. The structural behavior of the bridge are examined using controlled truck load tests for the systems before and after all external tendons were removed. From the test results, the characteristics of structural behavior of the bridge do not change significantly, but the natural frequency is decreased after the external tendons are removed. The strengthening effects of bridges can be exactly estimated by analytical methods some extent. As a result of this study, when a PSC girder bridge is deteriorated, the bridge can be retrofitted effectively by External Prestressing Strengthening Method, and the strengthening effects can be predicted through accurate structural analysis.

Flexural Strength Evaluation of PSC Beam with Loss of PS Tendon Area (PS강재의 단면적 감소에 따른 PSC보의 휨강도 평가)

  • Park, Soon-Hyung;Kim, Yong-Tae;Youn, Seok-Goo;Kim, Eun-Kyum
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.309-312
    • /
    • 2008
  • This paper describes ultimate load tests which were performed to show the effects of prestress loss and tendon corrosion on the flexural strength of post-tensioned concrete beams and the occurrence of wire fracture. Five test specimens were fabricated in laboratory with the variations of the prestress of tendons and the loss of tendon area. For two specimens, small area of tendon at the center of the beam was exposed by using diameter 25mm drill and the exposed tendon was corroded using accelerated corrosion equipment. During the tests, deflections, crack width, and strain changes were measured and acoustic events were monitored with two acoustic sensors. Tests results show that the ultimate flexural strength of test specimens with corroded tendons is smaller than the predicted flexural strength which is calculated considering the loss of tendon area. It is considered that estimation of flexural strength of PSC beams with corroded tendons is very complicated just based on the loss of tendon area obtained by one-side visual inspection.

  • PDF

Applicability estimation for cable assembling method of shield tunnel using field test construction (현장 조립 시험시공을 통한 쉴드터널 강연선 체결 기술의 적용성 평가)

  • Kim, Dong-Min;Ma, Sang-Joon;Lee, Young-Sub
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.11-23
    • /
    • 2015
  • In this study, the new segment assembling method using cable tensible force was developed to improve the problem of bolt assembling method of shield tunnel. In the field test construction, cable assembling method reduced the assembling time of segment in comparison with bolt assembling method because of guide role of segment shear-key. In the result of measuring the necessary time for segment assembling process, it took 420sec to assemble one segment in bolt method and 400sec to assemble one segment in cable method, but in case of using the cable automatic feeder, it could reduce the necessary time as 60sec in comparison with bolt assembling method. The cable automatic system modeling using BIM, that connected shield TBM also will be utilized in the area of design TBM, excavation plan, method process understanding, construction management and so on.

Analysis of Monitoring Results and Back Analysis for Rigid Diaphragm Wall Supported by Ground Anchor (지반앵커로 지지된 강성 지하연속벽체의 상세계측 결과분석 및 역해석 평가)

  • Lee, Jong-Sung;Hwang, Eui-Suk;Cho, Sung-Hwan;Lee, Jun-Hwan
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.5
    • /
    • pp.39-46
    • /
    • 2009
  • In this study, behavior of a rigid continuous wall, earth pressure distribution with construction stage, and axial force of earth anchors were evaluated based on field monitoring data and numerical analysis results. For this purpose, a construction site excavated using the diaphragm wall was selected and full instrumentation system was introduced. From monitoring results, it was found that the values of horizontal displacement of the wall measured from the inclinometers, which were installed within the diaphragm wall were similar to analytical value. The earth pressure increased with excavation progress due to jacking force of the ground anchors installed in previous excavation stages. When the excavation depth reached 60% of the final depth, observed earth pressure distribution was similar to that estimated from Peck's apparent earth pressure distribution. When the excavation depth was around 90% of the final depth, values of observed earth pressure showed middle values between those of Peck's and Tschebotarioffs apparent earth pressures. It was also observed that, when excavation depth is deep, values of the earth pressures from the rigid wall were similar to those estimated from conventional earth pressure distribution shape proposed for flexible walls.

Camber Reconstruction for a Prefab PSC Girder Using Collocated Strain Measurements (병치된 변형률 계측치를 이용한 프리팹 PSC 거더 캠버 재구성)

  • Kim, Hyun Young;Ko, Do Hyeon;Park, Hyun Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.151-162
    • /
    • 2022
  • Prefab members have attracted attention because they can be mass-produced in factories through smart construction technology. For prefab prestressed concrete girders, it is important to manage the shapes of the girders properly from production to the pre-installation stage for consistency with the prefab floor plate during the erection process. This paper presents a camber reconstruction method using collocated strain measurements from the top and bottom of the prefab girder. In particular, the camber reconstruction method is applied to measured strain data in which the time-dependent behavior of concrete is considered after the introduction of prestress. Through Monte Carlo numerical simulations, the statistical accuracy of the reconstructed camber for a limited number of sensors, measurement errors, and nonlinear time-dependent behaviors are analyzed and validated.