Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.

A Study on the Establishment of the Policing Technology R&D Organization (치안과학기술 연구개발조직 설립에 관한 연구)

  • Kim, Yeon Soo
    • Convergence Security Journal
    • /
    • v.15 no.1
    • /
    • pp.59-68
    • /
    • 2015
  • Recently, the rapid development of science and technology is a new challenge and opportunity in the policing environment. In the major industrialized countries of the West presents a strategy called SMART Policing the police to strengthen police capacity in accordance with this social change and actively utilize the science and technology in policing field. In this study, we attempted to discuss our country for the establishment of security technology research and development organization. First, I propose that installed the R&D planning department at the Office of Planning and Coordination in the National Police Agency. Secondly, it is need to establish the (provisional) Police Science and Technology Center, that integrate the functions of each organization's R&D-related work. Finally, it should integrate Police Science Institute and the National Forensic Service in (provisional) Policing Technology Research Institute.

Evaluation of the Importance of Risk Factors in Real Estate Development Projects and Their Risk Management (부동산 개발사업의 위험요인 중요도 평가 및 위험관리 방안)

  • Park, Jae-Yong;Park, Won-Seok
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.13 no.4
    • /
    • pp.681-696
    • /
    • 2010
  • This paper aims to evaluate the importance of risk factors at each stage of real estate development projects, and to propose risk management plans. For this purpose, possible risk factors at each stage of real estate development projects are extracted through previous studies, questionnaire survey by real estate experts is conducted next. And finally, the importance of risk factors at each stage evaluated using the AHP method. The results of this study are as follows. First, according to the results of evaluating the risk factors by main categories, planning risks in predevelopment stage, licensing risks in developing preparation stage, and cash flow risk in development stage are appreciated as most important risks. Second, according to the results by sub categories, changes in consumer preferences in pre-development stage, contracts and licensing-related work in developing preparation stage, bankruptcy of developers and construction companies in development stage, and compensation for any kinds of accidents in management and operation stage are appreciated as most important risks. Third, the major risk management plans at each stage based on the analysis results are suggested.

  • PDF

A Study on Prediction of Earth Retaining Work Cost in the Project Planning Stage -Focusing on Apartment Construction Projects in Seoul- (사업기획단계에서 흙막이 공사비 예측에 관한 연구 -서울시내 아파트 건설사업을 중심으로-)

  • Lee, Jin-Kyu;Yang, Kyung-Jin;Park, Ki-Hyeon;Kim, Chan-kee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.385-392
    • /
    • 2021
  • In general, earth retaining work in construction works enables the construction of structures, prevents the displacement of the surrounding ground to the maximum extent, and plays an important role in ensuring the safety of the surrounding structures and field workers. The earth retaining work and the construction method differ according to the various ground characteristics, surrounding topographical characteristics, repair environment, and design conditions. In particular, in the case of Seoul city, the environments and ground conditions differ according to the area. This study analyzed the earth retaining work cost mainly for the apartment construction project in Seoul and calculated the approximate earth retaining work cost at the project planning stage. A model was developed to predict the cost of earth retaining work that matches the characteristics of Seoul City and predict the construction cost for earth retaining work. This paper presents the predicted earth retaining work cost using a multiple regression model that applies 10 project outlines as independent variables. The error rate of the prediction result of the earth retaining work cost of the apartment construction project in Seoul using multiple regression models was 10.75%.

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

Evaluation of CM Capability based on Business Functions for International Plant Construction (해외 플랜트 건설사업관리 업무기능별 역량분석)

  • Ha, Jiwon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.3-15
    • /
    • 2014
  • Ever expanding overseas construction is one of the most important issues for Korean construction companies. Among these issues, strategies for overseas plant construction have widely been discussed, because the plant construction has features of low competitiveness and high ripple effects when compared with other construction sectors. In this sense, the purpose of this research is to evaluate the CM capability of Korean construction industry for overseas plant construction. Fourteen construction business functions and four techniques were defined first. Based on these functions and techniques, CM capability was quantified for As-Is (2013), To-Be (2018) and Gap analyses. Findings of this research reveal that 1) capability for construction is quite competent, 2) capabilities for planning, design management, contracting, and risk management are found to be relatively low, where higher value can be added. In addition, it is found that R&D needs to be extended to develop systemized management techniques. It is also required to secure specialists and original technologies at national industrial level.

신관리기법으로서의 PERT.CPM

  • 이승영
    • Cement
    • /
    • s.37
    • /
    • pp.4-11
    • /
    • 1970
  • 최근 급속히 팽창된 산업 구조와 이에 따른 업무량의 증가는 종래의 관리기술로서는 이를 성공적으로 처리할 수 없게 되었으며 아울러 인간의 미래조작능력의 증대와 기업구상력의 개발, 사회변동에 대비한 예측적인 계획의 수립 등 관리기능의 신장은 새로운 관리기법을 요구하게 되었으므로 PERT/CPM 수법이 신관리기법의 하나로 등장하게 되었다. PERT/CPM 이란 Program Evaluation Review and Technique, Critical Path Method 의 약자로서 우리말로는 계획수립 집행 및 평가로 번역되는데 이의 직역은 종속 및 총합 $\ulcorner$시스템$\lrcorner$ 과업의 동시진행 및 집중관리라 할 수 있는 것으로 시간과 비용을 절감하려는 기법인 것이다. 또한 PERT 기법은 복잡한 작업형태를 상호관련성있는 Network로 구성하고 제종속작업을 하나의 통일된 목표로 진행시키는 것을 의미한다. 이와 같은 PERT/CPM 기법은 제한된 자원의 효율적인 투자 및 관리와 불필요한 시간과 비용을 제거하여 준다. 현재 정부(경제기획원)는 PERT/CPM 제도를 도입하여 건설공사에 대한 예산관리제도를 설정중에 있으며 민간 및 정부투자기관으로서 현대건설주식회사와 한국전력주식회사와 이미 PERT/CPM 제도화방책을 연구기관에 위촉하여 제2단계적용을 시도하고 있는 것은 시대적 당위성에 따른 타당한 전망이라 하겠다. 거금 한국양회공업협회가 본제도의 도입 적용을 추진하기 위한 일련의 조사활동을 시작한 것은 시멘트 공업계의 새로운 경영관리체제를 모색하고 업계를 선도하는 중요한 전환점이 되리라 믿는다.

  • PDF

Design of Information Model for an Integrated Management System of Civil Projects (토목 프로젝트 통합 관리 시스템 구축을 위한 정보 모델 설계)

  • Jeong, Seon-Hwa;Kang, Hyoung-Seok;Noh, Sang-Do;Lee, Chang-Woo;Lee, Kwang-Myong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.365-368
    • /
    • 2010
  • 건설 프로젝트 단계별로 생산되는 다양하고 방대한 정보에 대한 효율적인 관리와 정보의 상호 교환 및 공유는 건설 산업의 생산성을 좌우하는 중요한 요소이다. 최근 건설 정보 통합에 대한 관심이 높아짐에 따라, 기획, 설계, 시공, 유지보수 등의 프로세스 및 엔지니어링 어플리케이션 간의 정보 통합에 대한 연구가 수행되고 있다. 하지만 BIM(Building Information Model)과 같은 정보 모델을 활용하여 정보를 통합 관리하는 것에 대한 연구는 상대적으로 건축 분야에 집중적으로 이루어지고 있다. 따라서 토목 분야에서 프로젝트 정보의 통합적인 관리와 업무 프로세스 별 엔지니어링 어플리케이션 간의 교환 및 공유를 위한 통합관리 시스템이 필요하다. 본 연구에서는 토목 프로젝트 통합 관리 시스템 구축을 위하여 토목 프로젝트 정보를 담을 수 있는 정보 모델을 설계하고, 토목 구조물 가운데 교량을 대상으로 하는 토목 프로젝트를 정보 모델에 적용해 보았다.

  • PDF

A study on the Feasibility Analysis factor Model for Housing Development Projects (주택개발사업의 사업성분석인자 모델에 관한 연구;사업성 분석인자의 중요도 분석 및 타당성 검증을 증심으로)

  • Hong, Yeong-Geon;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.249-254
    • /
    • 2007
  • The main bodies of housing markets of today need to carry out a systematic and objective feasibility analysis even from the step of planning in order to succeed in a diverse and complex market environment. Therefore, it is meaningful to understand this housing market environment and propose a necessary model for the feasibility analysis of hosing business. In this vein, the aim of this study was to extract an actual and practical feasibility analysis factor and its importance for housing market, and then present and apply a feasibility analysis factor model to an on-site example, in order to verify the model's validity. For this, the investigator interviewed with and carried out a questionnaire survey of experts in housing development projects. Study findings are as follows:First, the feasibility analysis factor, derived in this study, could provide a ground to evaluate the feasibility of subject projects in the planning of development through an analysis index. Second, when feasibility is under the level of carrying out the projects, it is possible to reexamine the projects through extracting analysis factors of which points are under the standard and via a feedback process for improvable analysis factors. Therefore, the result of applying the feasibility analysis model of this study to actual housing development projects analytically shows that the model could provide a practical evaluation criterion to the person in charge of project development through an analysis index.

  • PDF

Weights for Construction Performance Impact Factors of Public Construction Project (공공건설사업 건설성과 영향요인 가중치 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.373-379
    • /
    • 2012
  • Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.