• Title/Summary/Keyword: 기존선 증속

Search Result 8, Processing Time 0.027 seconds

Development of Intelligent Planning and Analysis Method for Railroad Alignment Improvement (지능형 철도 선형개량 계획 및 분석 기술 개발)

  • Kim, Jeong Hyun;Lee, Jun;Oh, Jitaek;Lim, Joonbum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.5
    • /
    • pp.651-657
    • /
    • 2023
  • Railroad alignment improvements and operating speed increase occupy considerable portion in recent railroad market. Developing countries have limitations to construction of new high speed railroads due to the burden of budgets and the lack of demands, and the projects of operating speed increase arepracticallyrecommended. Thisstudy developed the methodologyto provide the railroad alignment design alternatives and the costs by upgrading the "Intelligent Railroad Alignment Design Program (ei-Rail)" which has been used to obtain the alignment plans and construction costs for railroad construction projects. The program provides the cost for alignment improvement, design drafts and the effects of operating speed increase with the input of target improvement speed and the prevailing railroad alignment on the numerical map. It is then expected for the ei-Rail program to be used for the supporting tool for the railroad alignment improvement projects.

Characteristics of Curved Track Behaviors according to Traveling Tilting Train (틸팅차량 주행에 따른 기존선 곡선 궤도의 거동 특성)

  • Park, Yong-Gul;Choi, Jung-Youl;Sung, Deok-Yong;Chun, Dae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.692-700
    • /
    • 2007
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the curve section, which is vulnerable to accelerated train speed. The analysis of tilting train test running the part of Chungbuk line and Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the movement behavior of each part of track while tilting train, high speed train and traditional train (Mugunghwa and freight train) were running the existing line, wheel load, lateral wheel load, rail bending stress, vertical and lateral displacement of rail and vertical displacement of sleeper were compared and analyzed so as to evaluate the expected impact by tilting train for improving the train speed.

Characteristics of Track Behaviors according to Accelerated Tilting Train Speed (틸팅차량 증속에 따른 기존선 궤도의 거동 특성)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1653-1661
    • /
    • 2008
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the conventional line(ballast track), which is vulnerable to accelerated train speed. The evaluation of tilting train test running the part of Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the performance of each part of track components while tilting train and high speed train were running the existing line, wheel load, rail bending stress, vertical displacement of rail and sleeper were compared so as to evaluate the expected impact by tilting train for improving the train speed.

  • PDF

The Study on Train Separation Control Technology using Balise for Conventional Line Speed Up (기존선 속도 향상을 위한 발리스를 이용하는 열차간격제어 기술에 대한 연구)

  • Baek, Jong-Hyen;Lee, Chang-Goo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.2
    • /
    • pp.256-263
    • /
    • 2009
  • KORAIL carries out an improvement project of railway signaling system for the conventional line from the existing method which permits a train to move within limited speed the ground signal of ATS(Automatic Train Stop) system. The proposed system makes possible that a train can be driven using a speed profile created by onboard signaling system(ATP) with the movement authority from ground balise. A driving test over 100,000km is being executed by developing a tilting train for the speed elevation on the conventional line. And, the introduction of the tilting train by ATP system to the Jung-ang line is expected. However, a speed elevation on a curved line section has a restriction. Therefore, research on safety braking model and train separation control technology for the localization of ATP system is required preferentially. In this paper, we presented a safety braking model of ATP system and a train separation control method that use ground balise as variable information provider, and executed a performance simulation.

Dynamic Performance Evaluation of New Type PSC Railroad Bridges (신형식 PSC 철도교량의 동적성능 평가)

  • Choi, Sanghyun
    • Journal of the Society of Disaster Information
    • /
    • v.7 no.4
    • /
    • pp.259-265
    • /
    • 2011
  • After the commercial opening of the KTX in 2005, the high speed railroad has been rapidly emerged as the major transportation means due to its high energy efficiency. Recently, the government has announced its plan to build the future transportation system around the high speed railroad. Based on this policy, the existing lines as well as the lines under construction or design are planning to increase design speed. In this paper, the suitability of the mid-span PSC girder bridges for the high speed railroad is evaluated via dynamic analysis. IT, Precom, and WPC girder bridges are considered for the purpose of this study and, for comparison, the identical modeling method and the analysis technique are utilized. The performance indices used for dynamic performance evaluation are the natural frequency, the vertical displacement, the end axial displacement, track irregularity, etc. The KTX train is utilized as a dynamic load, and the dynamic analysis is performed up to the train speed of 420km/hr with the increment of 10km/hr.

Dynamic Behavior of Composite Steel Girder Bridge Exceeding Train Speed 350km/h (차세대고속열차 운행에 따른 호남고속선 강합성교의 동특성 분석)

  • Kim, Eunsung;Park, JongWoong;Sim, SungHan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.7
    • /
    • pp.3518-3527
    • /
    • 2013
  • The new developed train(HEMU-430X) faces running at high speed over 400km/h. But The Korea railway design code gives guidelines below 350km/h speed. Honam HighSpeed Railway was also designed based on the design standard below 350km/h. Existing infra structures have to be reviewed at high speed running and the design guideline for the speed over 350km/h should be prepared as soon as possible. This paper presents (1) the simulation results of composite steel girder bridge(Kaya Bridge of Seoul-Pusan HighSpeed Railway), (2) values measured at this bridge and the comparison with simulation results, and (3) the prediction of Yonjung bridge being constructed in Honam HighSpeed Railway.

Stability Evaluation of Track on Conventional Line According to Traveling Tilting Train (틸팅차량 주행에 따른 기존선 궤도의 주행안정성 평가)

  • Park, Yong-Gul;Eum, Ki-Young;Choi, Jung-Youl;Sung, Deok-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.701-708
    • /
    • 2007
  • A tilting train, which was developed to run the curve section without reducing the speed and compromising the riding quality, can improve the speed so as to reduce the travel time, compared to the existing trains. Then the force generated by the train operation to the track is in proportion to train operation speed, which means the track shall bear the increased force as much as the increase in train operation speed. Particularly, wheel load and lateral wheel load generated by train operation and distributed to the rail tend to cause the track to suffer the strain and furthermore the severe disaster such as derailment. To deal with such problem and ensure the train will run safety and stably, the tolerance in wheel load change, lateral wheel load and derailment coefficient was determined for quantitative evaluation of the train operation stability. In this study, derailment coefficient of inner and outer rail at existing curve section of tilting train was determined to evaluate the curve radius, possibility of acceleration and the need of rail improvement, which was then compared with the existing traditional train and high speed train. Conducting the quantitative evaluation of dynamic wheel load and lateral wheel load of each train, which was based on field survey, derailment coefficient and static & dynamic wheel load change, which serve the evaluation criteria of train operation stability, were determined for comparison with the standards, thereby analyzing the stability of the tilting train.

Analysis of Occurrence Tendency of Rail Force According to Running the Hanvit 200 Train on Transition Curve Track (한국형 틸팅차량 완화곡선 주행시 궤도작용력 발생경향 분석)

  • Park, Yong-Gul;Choi, Sung-Yong;Kim, Youn-Tae;Choi, Jung-Youl
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.678-686
    • /
    • 2009
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured rail force data in transition curve track, and then evaluated probability the range of load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of rail force by occurred a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation. Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation by changed of cant.