• Title/Summary/Keyword: 기술사업화 소요 기간

Search Result 25, Processing Time 0.024 seconds

PRT Benefit Estimation Study; Focused on Nan-Gok line (PRT시스템 도입시 편익산정 연구; 난곡노선을 중심으로)

  • Lee, Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.4
    • /
    • pp.370-375
    • /
    • 2011
  • In this paper, as a follow-up PRT studies of "J. Lee & K. Kim[2]", in terms of public transportation systems, economic feasibility of PRT systems was investigated. Based on previous studies, PRT demand was estimated and the required number of PRT vehicles has been calculated and the benefit was estimated. To ensure the economic feasibility, construction cost of a PRT system should be the level of 8 billion won per km, and the annual operating costs of the PRT system construction should be approximately 4.63% level. As a result, how much to reduce PRT construction costs, depending on whether decisions are considered to be economically feasible. Thus, PRT technology development will be conducted by targeting the most lightweight and by minimizing the infrastructure and vehicles of PRT.

The Study on the Elaboration of Technology Valuation Model and the Adequacy of Volatility based on Real Options (실물옵션 기반 기술가치 평가모델 정교화와 변동성 유효구간에 관한 연구)

  • Sung, Tae-Eung;Lee, Jongtaik;Kim, Byunghoon;Jun, Seung-Pyo;Park, Hyun-Woo
    • Journal of Korea Technology Innovation Society
    • /
    • v.20 no.3
    • /
    • pp.732-753
    • /
    • 2017
  • Recently, when evaluating the technology values in the fields of biotechnology, pharmaceuticals and medicine, we have needed more to estimate those values in consideration of the period and cost for the commercialization to be put into in future. The existing discounted cash flow (DCF) method has limitations in that it can not consider consecutive investment or does not reflect the probabilistic property of commercialized input cost of technology-applied products. However, since the value of technology and investment should be considered as opportunity value and the information of decision-making for resource allocation should be taken into account, it is regarded desirable to apply the concept of real options, and in order to reflect the characteristics of business model for the target technology into the concept of volatility in terms of stock price which we usually apply to in evaluation of a firm's value, we need to consider 'the continuity of stock price (relatively minor change)' and 'positive condition'. Thus, as discussed in a lot of literature, it is necessary to investigate the relationship among volatility, underlying asset values, and cost of commercialization in the Black-Scholes model for estimating the technology value based on real options. This study is expected to provide more elaborated real options model, by mathematically deriving whether the ratio of the present value of the underlying asset to the present value of the commercialization cost, which reflects the uncertainty in the option pricing model (OPM), is divided into the "no action taken" (NAT) area under certain threshold conditions or not, and also presenting the estimation logic for option values according to the observation variables (or input values).

지중선의 변천과 추세

  • 윤형희
    • 전기의세계
    • /
    • v.46 no.7
    • /
    • pp.68-71
    • /
    • 1997
  • 지중선은 가공선에 비해 공급신뢰성이 높고, 설비보안에 유리하며, 도시미관을 저해하지 않는 장점이 있지만 공사비가 가공선의 12-20배 정도 고가이어서 공사에 막대한 투자비가 소요되기 때문에 가공선건설이 곤란한 도심지역을 제외하고는 지중선건설을 지양하고 있다. 그러나 국가경제가 성장함에 따라 국민생활권이 도심지로 집중하면서 도시가 와밀해졌고 이로 인해 도심부하가 급증하여 오히려 지중선건설은 날로 증가하고 있는 실정이다. 또한 지중선건설에는 막대한 투자재원 확보외에도 사업에 어려움이 많은데 그중에 대표적인 것이 지중토목설비를 적기에 건설하는 것으로서 이 어려움은 앞으로의 차량증가에 따른 도로혼잡과 함께 더욱 심화될 전망이며 이에 대한 근본대책 마련이 시급하다. 이상과 같은 관점에서 볼 때 향후 지중선분야 기술은 케이블 compact화 및 저손실 대용량 케이블 및 신공법 개발에 주력해야 할 것이다. 특히 막대한 투자비를 들여 건설한 지중선은 그 수명기간동안에 고장없이 고품질의 전력을 수용가에 공급하는데 이상이 없어야 하며, 이는 설비운영의 과학화를 통하여 지속적으로 케이블 성능을 보존하므로서 가능하다고 하겠다.

  • PDF

Real Option Valuation을 이용한 금융혁신의 성과 분석 : 방카슈랑스 금융겸업을 중심으로

  • 김세린;박용태
    • Proceedings of the Technology Innovation Conference
    • /
    • 2004.06a
    • /
    • pp.214-236
    • /
    • 2004
  • 최근 국제 금융시장은 컴퓨터 및 통신분야의 기술진보로 비 은행금융기관에서도 상업은행에 의해서만 독점적으로 제공되었던 거래서비스를 결합한 새로운 금융서비스를 제공할 수 있게 되었고, 이는 곧 은행과 비 은행금융기관의 벽을 무너뜨리는 양자 간 동질화 현상을 유도하였으며 활발한 금융 겸업화 현상으로 금융혁신이라고 부를 만한 서비스분야의 기술혁신 성과를 거두게 되었다. 본 연구는 금융권간 판매채널 통합의 시작이라 평가되는 방카슈랑스를 중심으로 금융기관 간 겸업의 활성화를 통해 산업 간 동질화를 이루는 시점에서 금융혁신이 이루어진다고 설정, 금융서비스의 기술혁신 성과를 예측해 보았다 이를 위해 먼저 우리나라 대표 금융기관 격인 은행과 보험, 증권회사가 금융겸업을 이루는 경우 각 겸업 주체 기관의 혁신적인 성과를 실증 분석하도록 한다. 분석대상은 표본기간 중 국내 주식시장에 연속으로 상장되어 있는 모든 은행, 증권, 손해보험 49개를 대상으로 수행하였으며, 표본자료는 KIS-LINE이 제공하는 재무제표자료와 한국증권거래소에서 제공하는 주가데이터에서 추출하였다. 본 연구의 금융혁신 성과 분석은 두 단계로 이루어진다. 먼저 금융기관 간 가상 합병을 이용, 시뮬레이션 분석을 하고 그 결과 각 금융기관의 ROA와 자기자본비율 및 안전성(위험성지표)을 분석한다 다음 단계로 안전성이 보장되지 않는 경우 적정하게 추정된 안전성 내에서 경영 성과를 이루는 최적 기간에 대해 실물옵션평가(Real Option Valuation) 분석을 한다. 그 결과 금융겸업을 통한 혁신 성과는 은행 주체로 비 은행금융기관과 겸영하는 경우 이상적으로 잘 보여지며, 증권 주체로 보험업을 겸업하는 경우는 ROA 와 자기자본비율 면에서는 혁신적이나 안전성 면에서는 저해된다는 결과를 알아내었다. 그리고 이 같은 안전성의 위험은 증권업을 실행하는데 요구되는 수준의 안전성을 유지하는 경우 3 년간의 투자기간 후에는 혁신사업으로 발전할 수 있는 발판을 마련하게 된다고 추정하였다.

  • PDF

Feasibility Study of the Northern Terengganu Rural Development Project, Phase II, Malaysia (말레이시아 북부(北部) 뜨렝가누 농촌개발(農村開發) 제(第)2단계사업(段階事業) 타당성(妥當性) 연구(硏究))

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.19 no.2
    • /
    • pp.201-237
    • /
    • 1992
  • 본(本) 연구(硏究)는 1992년(年) 2월(月)부터 동년(同年) 8월(月)까지 한국(韓國)의 농어촌진흥공사(農漁村振興公社)(RDC)와 말레시아의 KTA기술용역단간(技術用役團間)의 기술제휴하(技術提携下)에 아세아개발은행(亞細亞開發銀行)의 기술협력기금(技術協力基金)에 의(依)한 말레지아북부(北部) Terengganu 농촌개발제(農村開發第)2단계사업(段階事業)의 타당성조사연구(妥當性調査硏究) 결과(結果) 중 말레시아정부(政府)의 경제정책방향(經濟政策方向), 농업개발(農業開發) 및 사업(事業)의 경제적(經濟的) 재무적(財務的) 타당성(妥當性)만을 발췌(拔萃)하여 본(本) 논문(論文)에 수록(收錄)하였다. 본(本) 농촌개발사업지구(農村開發事業地區)는 말레시아의 북동(北東)쪽에 위치(位置)하고 있는 Terengganu State의 Setiu-Besut양(兩) Distict가 포함(包含)되는데 경제적(經濟的)으로 가장 낙후(落後)된 지역(地域)으로 매년(每年) 행사(行事)처럼 찾아오는 홍수(洪水)때문에 농경지(農耕地)를 집약적(集約的)으로 경작(耕作)하지 못함으로써 지역농민(地域農民)들은 빈곤(貧困)에서 벗어나지 못하고 있고 침수기간중(浸水期間中)에는 지역(地域)의 경제활동(經濟活動)은 물론(勿論) 교통(交通)마저 불통(不通)되고 농촌하부구조(農村下部構造)의 손실(損失)은 물론(勿論) 사회경제적(社會經濟的)인 손실(損失)이 크며 Setiu River의 하구(河口)가 침전(沈澱)되어 어선(漁船)의 출입(出入)이 점점(漸漸) 곤란(困難)해지므로써 어민(漁民)들의 생계(生計)에도 위협(威脅)을 주는 지역(地域)이다. 따라서 본(本) 타당성(妥當性) 조사연구(調査硏究)의 근본적(根本的)인 목적(目的)은 농촌(農村)의 빈곤(貧困)을 타파(打破)하기 위하여 (1) 홍수(洪水)를 방지(防止)하고, 배수(排水) 및 관개개선(灌漑改善)을 하며, 하구(河口)를 개발(開發)하여 어민(漁民)들의 생산활동(生産活動)을 돕고 지역주민(地域住民) 및 농민(農民)들의 경제활동(經濟活動) 및 농업생산성(農業生産性)을 제고(提高)시키며 (2) 환경보호(環境保護) 및 관리(管理)를 통(通)하여 지역주민(地域住民)에게 쾌적(快適)한 농촌생활환경(農村生活環境)을 제공(提供)하고 생태계(生態系)의 변화(變化)를 방지(防止)하며 (3) 다각적(多角的)인 영농활동(榮農活動)을 통(通)하여 지역농민(地域農民)의 소득(所得)을 극대화(極大化) 할 수 있는 개발(開發)의 기본구상(基本構想)과 이에 대한 기술적(技術的) 경제적(經濟的) 타당성(妥當性)을 구명(究明)하는 것이다. 본(本) 사업지역(事業地域)의 총면적(總面積)은 9,500ha이며 이는 4,680ha의 기설지구(旣設地區)의 개보수관개사업(改補修灌漑事業)과 500ha의 과수단지(果樹團地), 200ha의 채소단지(菜蔬團地), 500ha의 옥수수단지(團地), 250ha의 엽연초생산단지(葉煙草生産團地), 2,760ha의 오일팜 및 고무나무단지에 소, 염소 및 양(洋)을 사육(飼育)하는 종합적(綜合的)인 농촌개발(農村開發)로서 농가(農家)의 농업소득제고(農業所得提高)에 큰 기여(寄與)를 하게 되며 Setiu강(江)의 유역(流域) 4,090ha에 대한 홍수경감대책(洪水輕減對策)으로 지역주민(地域住民)의 생활안정(生活安定) 및 교통(交通), 관광(觀光), 사회경제적(社會經濟的) 생산활동(生産活動)을 촉진(促進)하는 사업(事業)을 하게된다. 본(本) 사업(事業)의 공사기간(工事期間)은 1993년(年)부터 5개년간(個年間)이며 총사업비(總事業費)는 외화(外貨) 2천만불(千萬弗)을 포함(包含)하여 5천(千) 5백만불(百萬弗)로 추정(推定)되었다. 년간사업수익(年間事業收益)은 사업(事業)의 완전운영기간(完全運營期間)인 2003년(年)을 기준(基準)으로 할 때 15,541백만불(百萬弗)로 추정(推定)되었으며 사업(事業)의 내구기간(耐久期間)은 30년(年)으로서 2023년(年)까지 생산(生産)이 계속(繼續)될 것이다. 본(本) 사업(事業)의 전체재무수익율(全體財務收益率)은 22.49%이며 경제적(經濟的) 수익률(收益率)은 19.30%로 경제적(經濟的)인 타당성(妥當性)이 매우 높음을 알 수 있다. 모든 사업(事業)이 계획(計劃)대로 성공적(成功的)으로 추진(推進)될 경우 사업지역내(事業地域)의 몽리농가(蒙利農家) 4,000호(戶)가 큰 혜택(惠澤)을 보게되고 농촌(農村)의 빈곤수준(貧困水準)(Poverty Line)은 현재(現在)의 36%에서 18%수준(水準)으로 경감(輕減)될 것이 기대(期待)되고 있다.

  • PDF

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.

A method for selecting the evaluation index of defence R&D project by AHP (계층분석법에 의한 국방연구개발 평가지표 선정에 관한 연구)

  • Park, Seong;Hong, Yeon-Woong;Na, Joong-Kyung
    • Journal of the Korean Data and Information Science Society
    • /
    • v.23 no.5
    • /
    • pp.961-970
    • /
    • 2012
  • To evaluate companies that participated in the defense R&D project, 27 variables are chosen through literature survey, feature analysis of defense R&D and interviews with military experts. 17 variables are selected after factor analysis which is applied to reduce the number of variables and to detect structure in the relationships among variables, that is to classify variables using Likert-type scales. And then 17 variables are prioritized by AHP (analytic hierarchy process) method. It is shown that communication skill & cooperation strategy, level of technology, possession of needs technology have high priorities. However, protection plan of technology leakage, expertise of subcontractors, software development plan have low priorities.

Economic Feasibility Analysis Study to Build a Plant-based Alternative Meat Industrialization Center (식물성 기반 대체육 산업화센터 구축을 위한 경제적 타당성 분석)

  • Yong Kwang Shin;So Young Lee;Jae Chang Joo
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.25 no.4
    • /
    • pp.118-126
    • /
    • 2024
  • Recently, the alternative meat (food) market is growing rapidly due to the increase in meat consumption due to global population growth and income improvement, as well as issues such as equal welfare, carbon neutrality, and sustainability. The government is also developing a green bio convergence new industry development plan to foster alternative foods, but there are difficulties in commercialization due to the lack of technology and insufficient production facilities among domestic small and medium-sized enterprises, so it is necessary to build joint utilization facilities and equipment to resolve the difficulties faced by companies. am. In addition, small and medium-sized enterprises are having difficulty developing and commercializing plant-based meat substitutes due to a lack of technical skills, and related equipment is expensive, making it difficult to build equipment on their own. Accordingly, Jeollabuk-do is pursuing a strategy to secure the source technology for development, processing, and industrialization of plant-based substitute meat at the level of developed countries by establishing a plant-based alternative meat industrialization center. In this study, an economic feasibility analysis study was conducted when a plant-based alternative meat industrialization center is built in Jeollabuk-do. As a result of the analysis, B/C=1.32, NPV=374 million won, and IRR=4.8%, showing that there is economic feasibility in establishing an alternative meat industrialization center. In addition, as a result of analyzing the regional economic ripple effect resulting from the establishment of an industrialization center, if 38 billion won is invested in Jeollabuk-do, the nationwide production inducement effect is 74 billion won, the added value inducement effect is 29.8 billion won, and the employment inducement effect is 672 people

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Status and Trends of Emission Reduction Technologies and CDM Projects of Greenhouse Gas Nitrous Oxide (온실가스 아산화질소(N2O) 저감기술 및 CDM 사업의 현황과 전망)

  • Chang, Kil Sang
    • Applied Chemistry for Engineering
    • /
    • v.19 no.1
    • /
    • pp.17-26
    • /
    • 2008
  • With the effectuation of Kyoto Protocol on the United Nations Framework Convention on the Climate Change, the emission reduction of greenhouse gases became an urgent issue and has been competitively secured among countries as the form of certificates through clean development mechanism (CDM) or joint implementation (JI). Nitrous oxide ($N_2O$) is one of the major greenhouse gases along with carbon dioxide ($CO_2$) and methane ($CH_4$) having warming potential 310 times that of carbon dioxide and chemically very stable in the atmosphere to give a life time of more than 120 years so that it reaches to the stratosphere to act as an ozone depleting substance. $N_2O$ hardly decomposes and thus, besides to the adoption of thermal decomposition at high temperature, selective catalytic reduction methods are usually used at temperatures over $400^{\circ}C$ in which the presence of NOx acts as a major impeding material in the decomposition process. In this article, the sources of various $N_2O$ generation, catalytic reduction processes and the status and trends of emission trade with CDM projects for greenhouse gas reduction are summarized and discussed on a condensed basis.