A Study of Information Update and Framework for Intergrated Maintenance and Operation of River Facilities (하천시설 통합 유지운영을 위한 정보 현행화 및 프레임워크 구축방향 연구)

  • Nam, Jeong-Yong;Kim, Min-Jeong;Jo, Chan-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.140-149
    • /
    • 2017
  • Recently, it has become necessary to consider climate change when managing multi-purpose river functions. However, in terms of domestic rivers, the management of national and local rivers is separated and the river information cannot be integratedly handled. Especially, it is not sufficient to collect and update information by recycling reports for design and construction. In addition, the basic information of the rivers is dependent on the GIS-based RIMGIS system, but the reliability of the information is deteriorating due to the construction of spatial information using the river basement planning results. The purpose of this study is to investigate the current status of the information system with regard to the maintenance and operation of the river facilities. Through the verification of actual cases, the optimal solution was suggested from the point of view of practical information. As a result, we constructed an information system for the reliable maintenance of river facilities and examined the integrated information management plan. The results of this study can be used to improve the existing information and technical and institutional procedures for the integrated maintenance and operation of river facilities. It will be helpful to introduce the BIM as well as solve to the information gap with other fields through the establishment of an information framework to improve the information construction of river areas.

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

Efficient 3D Modeling Automation Technique for Underground Facilities Using 3D Spatial Data (3차원 공간 데이터를 활용한 지하시설물의 효율적인 3D 모델링 자동화 기법)

  • Lee, Jongseo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.25 no.11
    • /
    • pp.1670-1675
    • /
    • 2021
  • The adoption of smart construction technology in the construction industry is progressing rapidly. By utilizing smart construction technologies such as BIM (Building Information Modeling), drones, artificial intelligence, big data, and Internet of Things technology, it has the effect of lowering the accident rate at the construction site and shortening the construction period. In order to introduce a digital twin platform for construction site management, real-time construction site management is possible in real time by constructing the same virtual space. The digital twin virtual space construction method collects and processes data from the entire construction cycle and visualizes it using a 3D model file. In this paper, we introduce a modeling automation technique that constructs an efficient digital twin space by automatically generating 3D modeling that composes a digital twin space based on 3D spatial data.