Development of Urban Flood Warning System Using Regression Analysis (회귀분석에 의한 도시홍수 예보시스템의 개발)

  • Lee, BeumHee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4B
    • /
    • pp.347-359
    • /
    • 2010
  • A simple web-based flood forecasting system using data from stage and rainfall monitoring stations was developed to solve the difficulty that real-time forecasting model could not get the reliabilities because of assumption of future rainfall duration and intensity. The regression model in this research could forecast future water level of maximum 2 hours after using data from stage and rainfall monitoring stations in Daejeon area. Real time stage and rainfall data were transformed from web-sites of Geum River Flood Control Office & Han River Flood Control Office based MS-Excel 2007. It showed stable forecasts by its maximum standard deviation of 5 cm, means of 1~4 cm and most of improved coefficient of determinations were over 0.95. It showed also more researches about the stationarity of watershed and time-series approach are necessary.

Design and Implementation of Java AOTC for Embedded System (내장형 시스템을 위한 자바 AOTC의 설계와 구현)

  • Park JongKuk;Jung Dong-Heon;Bae SungHwan;Lee Jaemok;Moon Soo-Mook
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.11a
    • /
    • pp.772-774
    • /
    • 2005
  • 우리는 내장형 시스템에서 자바의 성능 문제를 해결하기 위해 수행시간 이전에(ahead-of-time) 자바 바이트코드를 기계어 코드로 변환하는 AOTC를 개발하였다. 우리가 개발한 AOTC는 자바 클래스 파일을 읽어서 C코드로 변환한 후에 이를 C컴파일러로 컴파일하는 방식으로 동작한다. 이러한 방법으로 짧은 기간안에 하드웨어 아키텍처에 종속적이지 않으면서도 안정적인 고성능의 자바 실행 환경을 구축할 수 있었다. 본 논문에서는 AOTC의 전체 구조에서부터 C코드를 생성하는 방법 및 예외 처리와 쓰레기 수집기(GC)를 지원하기 위한 방법들에 대해서 다룬다. 또한 C컴파일러에 의한 최적화의 한계를 극복하기 위해 자바에 특화된 최적화를 AOTC에 포함하였는데 이에 대해서도 설명한다. 우리의 AOTC를 Sun Microsystems의 J2ME CDC VM인 CVM위에 적용해본 결과 벤치마크에 따라서 평균 $5\~14$배의 성능 향상을 관찰 할 수 있었다.

  • PDF

Irradiation and Power Analysis According to Months (태양광 시스템의 월별 일사량과 전력량)

  • Jung, You-Ra;Kim, Seok-Gon;Choi, Yong-Sung;Hwang, Jong-Sun;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.06a
    • /
    • pp.205-205
    • /
    • 2009
  • 태양광 발전은 다른 발전방식과는 달리 연료비가 불필요하고 대기오염이나 폐기물 발생이 없으며 부위가 반도체 소자이고 제어부가 전자제품이므로 기계적인 진동과 소음 등의 공해가 전혀 없는 에너지원이다. 그러나 태양광 발전은 에너지 밀도가 낮아 일사량, 온도, 계절 등 기상조건의 작은 변화에도 발전량의 편차가 심하고 출력이 불안정하여 상용전원과의 연계나 별도의 축전설비 또는 발전설비 없이 독립적으로 사용하기에는 다소 무리가 있다는 단점이 있다. 따라서 본 논문에서는 이러한 문제점을 해결하기 위해서 1년 동안 실증운전을 통한 종합적인 운전특성 데이터, 태양전지 어레이 출력의 전압 전류, 교류 전력 및 전력량, 일사량 및 모듈의 온도, 외기온도 등 분석기간 동안 수집된 운전 데이터를 이용하여 태양이 태양전지 모듈에 입사되는 각과 발전량 즉 태양 전지 어레이 형태와 발전량과의 상관관계를 정량적으로 규명하여 태양광 발전시스템의 설계 및 시공의 최적화가 이루어질 수 있도록 하였다.

  • PDF

음주문화에 대한 전문가 인식차이에 대한 연구

  • Cheon, Seong-Su;Son, Ae-Ri;Yun, Seon-Mi;Kim, Mi-Gyeong
    • Proceedings of The Korean Society of Health Promotion Conference
    • /
    • 2010.05a
    • /
    • pp.176-176
    • /
    • 2010
  • 알코올연구자, 보건정책연구자, 입법관련전문가, 관련 NGO단체 전문가 등을 중심으로 전문가 집단을 2배수(60명) 선정한 후 확률적으로 30명을 선정하였다. 전문가 핵심 집단연구를 위하여 전문가 패널 국내 전문가 30명에게 목적과 취지를 설명한 후 동의를 구한 후 전자메일을 보내 일정기간 내에 응답하도록 한 후 수거하는 방식을 취하였다. 국내 전문가 조사대상자의 특성은 남성이 19명(61.2%)로 여성 12명(38.8%)보다 많았으며, 40대(64.5%)가 주로 응답을 하였고, 대학교수(67.7%)가 가장 많이 응답하였다. 전문가 집단은 한국인 음주문제에 대한 3문항의 모든 문항에 동의를 하였으며, 동의하지 않은 문항은 없는 것으로 나타났다. '인간관계를 술로 해결하는 관습', '업무상 술자리 많은 사업환경'의 경우 모든 전문가가 매우동의 혹은 동의로 응답하였다. '스트레스 많은 경쟁사회' 83.9%, '저렴한 알코올 가격' 64.5%, '술을 쉽게 접할 수 있는 지역 환경' 80.6%, '생활 대소사에 자주 노출되는 음주환경' 93.6%, '과음 통제할 사회적 통제수단 부족한 점' 90.3%의 경우 모두 매우 동의 혹은 동의로 응답하였다. 이 중 동의율이 가장 높은 문항은 '생활 대소사에 자주 노출되는 음주환경'(93.6%)으로 나타났다. '술을 좋아하는 국민기질' 61.3%, '여가활동을 할 수 없는 사회환경' 77.5%로 다른 문항에 비하여 동의율이 낮았고, 동의 안 한다는 응답도 각각 3.2%, 9.7%가 있는 것으로 나타났다.

  • PDF

Improvement of Estimation Method on the Low Flow Frequency Inflow for the Optimal Reservoir Operation (저수지 최적운영을 위한 갈수빈도유입량 산정기법 개선)

  • Ryoo, Kyong-Sik;Lee, Han-Goo;Park, Jin-Hyeog;Hur, Young-Teck
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1287-1291
    • /
    • 2009
  • 최근 극심한 가뭄은 전년도 홍수기 이후 강수량이 예년 평균 강수량대비 약 60%정도이고 댐유입량은 예년 평균 유입량대비 약 30%로써 매우 극심한 가뭄을 겪고 있다. 따라서 강원도 태백지역을 비롯하여 전라 및 경상남도지역에 제한급수 등이 이루어지고 있는 실정이다. 또한 기상청 전망에서도 금년 홍수기전까지 가뭄이 지속될 것이라는 보도가 나오고 있어 향후에도 매우 어려운 상황이 지속될 것으로 예상된다. 따라서 이러한 악조건하에서 우리가 대체할 수 있는 방법중의 하나로서는 가용한 수자원량과 향후 예상되는 유입량에 대한 정량적 판단을 통해 수자원의 효율적인 관리일 것이다. 이에 본 연구에서는 이수기 저수지의 효율적 운영을 위해서 기존에 이용되고 있는 저수지에서의 빈도유입량 산정방법을 개선하여 보다 적정한 운영이 이루어질 수 있도록 하고자 한다. 현재 수자원공사에서는 이수기 유입량 빈도분석을 위해 연속된 수문량이 가지고 있는 주기특성을 반영한 수문량 누가방식(누가차분법)을 채택하여 실무에서 이용하고 있다. 그러나 해당방법은 누가기간에서 산정된 빈도값의 차분량 계산시 부분적으로 음(-)의 값이 산출되고 갈수빈도가 증가함에도 수문량이 증가하는 이상 현상이 발생할 뿐만아니라 빈도분석 초기에는 극한 가뭄이 오고 분석기 말에는 평년수준의 유입량이 유입되는 것으로 분석되어 효율적인 저수지 운영이 어려운 실정이다. 따라서 본 연구에서는 상기 문제들을 해결할 수 있는 새로운 갈수빈도유입량의 분해방법을 제시하고 이에 대한 검증을 위해 금번 가뭄 패턴과 비교 분석하고자 한다.

  • PDF

A Study on PBS-AES Correlator Design adapted in Binary CDMA System (Binary CDMA 시스템에 적용 가능한 PBS-AES 코릴레이터 설계에 관한 연구)

  • Lee, Seon-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2713-2717
    • /
    • 2011
  • To transmit data from straggling sensors in water-processing basic industries etc., used Binary-CDMA system has safety voluntarily. But Binary-CDMA is necessity that react very sensitively in environment change as defense about hacking and cracking of various way that change suddenly. Therefore, this paper is that see added cryptographic algorithm for safety and easy update on correlator that a bottle-neck phenomenon is happened in Binary-CDMA to solve problem that is such. Added cryptographic algorithm does to communicate safe information in channel that is not safe as that achieve 1:1 confrontation for sensors by symmetric cryptographic algorithm.

A Case Study on ERP Implementation for the Apparel Industry (OEM형태의 의류산업에 대한 ERP 도입 사례 연구)

  • Yim, Sung-Sic;Kwon, Young-Sik
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2003.05a
    • /
    • pp.420-427
    • /
    • 2003
  • 최근 국내 기업들의 ERP시스템 도입 사례는 대기업에서 중소기업으로, 제조업중심에서 금융, 서비스, 유통 등의 다양한 산업분야로 그 영역을 확장하고 있다. 또한 SCM(Supply Chain management), CRM(Customer Relationship Management)과 같은 확장ERP 시스템의 도입도 활발히 진행되고 있다. 여러 가지 측면의 ERP시스템의 확장 방향 중에서 산업별 특성에 따른 ERP시스템의 개발은 해당 산업분야의 규모와 중요성의 순서에 따라 그 깊이와 범위가 다르게 이루어 졌으며, 소수 특이한 산업에 대한 솔루션은 미개발 상태인 경우가 많이 있다. ERP 소프트웨어 공급업체들은 주요 산업별로 특징적인 업무 프로세스를 지원하기위해 추가적인 프로그램을 공급하거나 개발 중에 있다. 본 연구는 국내 기업 중 다소 특수한 업무 프로세스를 가지고 있는 OEM(Original Equipment Manufacturing) 형태의 생산방식을 가진 의류 제조, 판매 업체의 ERP도입 사례를 통하여 ERP시스템 유연성의 한계에 대해 검토하여 보고 OEM산업과 의류산업이라는 산업특성에서의 ERP시스템 도입이 어떠한 문제점을 지니고 있는지 조사해 보고자 한다. 본 연구는 이를 위해 OEM산업에 대한 고찰과 의류업종의 업무적 특징을 정리하여 보고 실제 ERP 도입 사례를 통해 발견된 도입 특성 또는 도입시의 문제점과 해결 방안을 제시함으로서 향후 유사 업종의 ERP 시스템 도입 시 유용한 지침(Guideline)을 제공하고자 한다. ERP 도입사례는 SAP R/3를 채택하여 약 9개월간의 도입기간에 나타난 현상들을 기반으로 한다.

  • PDF

Transcoding Algorithm for SMV and AMR Speech Coder (SMV와 AMR 음성부호화기를 위한 상호부호화 알고리즘)

  • Lee, Duck-Jong;Jeong, Gyu-Hyeok;Lee, In-Sung
    • The Journal of the Acoustical Society of Korea
    • /
    • v.27 no.8
    • /
    • pp.427-434
    • /
    • 2008
  • In this paper, a transcoding algorithm for SMV and AMR speech coder is proposed. In the application requiring the interoperability of different networks, two speech coders must work together with the structure of cascaded connection, tandem. The tandem which is one of the simplest methods has several problems such as long delay, high complexity and the quality degradation due to twice complete encoding/decoding process. These problems can be solved by using transcoding algorithm. The proposed algorithm consists of LSP (Line Spectral Pair) conversion, pitch delay conversion, and fast fixed codebook search. The evaluation results show that the proposed algorithm achieves equivalent speech quality to that of tandem with reduced computational complexity and delay.

An Optimal Scheduling Method Using Probability on the Estimation of Construction Duration (확률적 공기산정에 의한 공정계획 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.72-79
    • /
    • 2004
  • Critical Path-based project management has been applied to the construction projects with a goal of delivering projects within original costs and time estimates. These current project management methods, rarely make early finishes of construction Projects. In addition, current practices on time management seems not to take advantages of early finishes concepts due to student syndrome and Parkinson's Law, This research study applied the Theory of Constraints(n) in the estimation of construction project duration. While the TOC includes variety of management techniques, in this study, it refers to critical chain that has been used to develop the specific management technique in scheduling. The concept of critical chain is applied to this study to solve the problems associated with the current scheduling method. The efforts focus to solve the p개blems associated with current construction project scheduling methods by adopting both stochastic estimation technique and the concept of schedule buffer,

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.