• Title/Summary/Keyword: 급 곡선

Search Result 106, Processing Time 0.032 seconds

Optimization of Characteristics of Longitudinal Creepage for Running Stability on Sharp Curved Track (급곡선 주행 안정화를 위한 주행방향 크리피지 특성 최적화 연구)

  • Sim, Kyung-Seok;Park, Tae-Won;Lee, Jin-Hee;Kim, Nam-Po
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.1
    • /
    • pp.19-27
    • /
    • 2014
  • Urban railway vehicles operate in downtown areas. Due to increases in the number of passengers and changes in the service plans, railway vehicles are expected to operate on sharp curved tracks. However, on these tracks, the running stability of the railway vehicles is significantly decreased and the creepage is increased. Creepage causes the wheel/rail to wear and vibration. Therefore, reducing the creepage helps ensure the running stability and can be beneficial for the environment and cost. In this paper, the longitudinal creepage is analyzed using a railway vehicle model on a sharp curved track. Furthermore, in order to minimize the problems when a railway vehicle runs on a sharp curved track, the characteristics of a bogie are optimized using response optimization.

Cause analysis of the electric train derailment occurred in turnout on a sharp curves. (급곡선 분기기에서 발생한 전동열차 탈선사고의 원인분석)

  • Lee, Seungwon;Woo, Kwanje;Jeong, Chanmook
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.411-416
    • /
    • 2018
  • It is generally not preferable to install a turnout on a sharp curves but it is not desirable for the safety of a train. However, in a mountainous area or a depot where a sufficient space can not be secured to secure a straight line. In this study, in order to analyze the cause of train derailment accident that occurred in the place where turnout is installed in a sharp curves, we performed derailment analysis using line data and accident vehicle data measured at the location where the accident occurred. This derailment coefficient maximum turnout at the start of the track and derailment curve analysis showed that even big enough to cause a derailment as 1.37 in size, which was found to be consistent with the actual site survey results derailment occurred.

Development of a Interface Structure of Bogie and Carbody in Mountain Tram running on sharp Curves (급곡선 급경사 운행 산악트램의 대차 및 차체 연결 구조 개발)

  • Seo, Sung-il;Mun, Hyung-Suk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.275-282
    • /
    • 2018
  • Mountain trams are an environmental-friendly transportation system that run wirelessly on an embedded track constructed on previous mountain roads, and can run despite the frozen road. On the other hand, there is some difficulty on sharp and steep tracks. In this study, after possible technical problems were defined in mountain trams running on a sharp and steep track, the design solutions for the interface structure of bogie and carbody were proposed. In addition, a prototype was made and its performance was tested to verify the solutions. Because the difference in the distance of the inner and outer rails on a sharp curve is severe enough to interrupt running, independent rotating wheels with different angular speeds were developed and applied. To prevent derailment due to the large attack angle and lateral force caused by the previous vehicle of 2bogie-and-1carbody on the sharp curve, a vehicle with 1bogie-and-1carbody was designed and applied. A prototype vehicle of 1bogie-and-1carbody with independent rotating wheels was made to improve the performance during the test running on a small track. A coupler was designed to absorb the large rotations of 3 degrees-of-freedom between the carbodies of a mountain tram running on the steep curved track. After a small scale prototype was made, the performance was verified by a function test.

Application technique on thrust jacking pressure of shield TBM in the sharp curved tunnel alignment by model tests (축소모형실험을 통한 급곡선 터널에서의 Shield TBM 추진 압력 적용 기술에 대한 연구)

  • Kang, Si-on;Kim, Hyeob;Kim, Yong-Min;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.335-353
    • /
    • 2017
  • This paper presents the application technique on thrust jacking pressuring of shield TBM in the sharp curved tunnel alignment by model tests. Recently, the application of shield TBM method as mechanized tunnelling is increasing to prevent the vibration and noise problems, which can be occurred in the NATM in the urban area in Korea. However, it is necessary to plan the sharp curved tunnel alignment in order to avoid the building foundation and underground structures, to develop the shield TBM operation technique in the shape curved tunnel alignment. Therefore, the main operation parameters of shield TBM in the curved tunnel alignment are reviewed and analyzed based on the case study and analytical study. The results show that the operation of shield jacking force system is the most important technique in the shape curved tunnel alignment. The simplified scaled model tests are also carried out in order to examine the ground-shield TBM head behaviour. The earth pressures acting on the head of shield TBM are investigated according to two different shield jacking force systems (uniform and un-uniform pressure) and several articulation angles. The results obtained from the model tests are analysed. These results will be very useful to understand the shield TBM head interaction behaviour due to the shield jacking operation technique in the shape curved tunnel alignment, and to develop the operation technique.

Technologies for improving the running safety of a tram operating on the concrete embedded track (콘크리트 매립형 궤도를 운행하는 트램의 주행안전성 향상 기술)

  • Seo, Sung-il;Mun, Hyung-Suk;Kim, Sun-Chun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.717-724
    • /
    • 2017
  • To improve the running safety of a tram operating on a concrete embedded track, a bogie, the core system of the tram, was developed and fabricated. After it was integrated with the prototype car body, a short distance track with a sharp curve and steep gradient was constructed for the test operation. A formula to check the interference of the wheel flange with the track during running was proposed. Based on the results provided by the formula, the track was designed. Another simple formula was derived to estimate the derailment quotient and the wheel unloading ratio. During running on the track, the acceleration of the car body was measured and the interface status between the wheel and the track was monitored by a video system. According to the results calculated by these simple formulas, the derailment quotient and wheel unloading ratio were estimated to be within the safety criteria. In the actual test, no derailment occurred and the measured acceleration satisfied the criteria. Also, there was no interference between the wheel and track. The video monitoring results showed no signs of derailment, such as the climbing of the wheel. The pinion in the center showed good running safety, contacting smoothly with the rack. The measurements of environmental noise proved that the criteria were satisfied.

Economic Analysis on VLS-PV System from Sunbelt Region (Sunbelt 지역의 태양광발전 경제성분석)

  • Choi, Bong-Ha;Park, Soo-Uk;Lee, Deok-Ki
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.221-225
    • /
    • 2006
  • 본 논문에서는 국내 기술을 활용하여 Sunbelt 지역에 설치된 50kW급 PV 실증 단지에서의 태양광발전을 대상으로 경제성을 분석하였으며, VLS-PV로의 성공적인 확장 가능성을 발견하였다. 이를 바탕으로 2008년부터 2017년까지의 10년 동안 연간 10MW급의 단계적 시스템설치를 통한 최종 100MW급의 VLS-PV 개발을 가정하여 경제성 분석을 수행하였다. 이 과정에서 과거 누적 PV 설비용량과 PV 시스템 가격사이의 관계를 경험곡선을 활용하여 분석하였으며, 이에 기초하여 2017년까지의 PV 모듈 및 PV시스템의 가격을 예상하였다. 현재 실증 단계에서의 발전단가는 567.2원/kWh으로 나타나 국내 태양광발전보다 낮은 발전단가를 보였으며, 가격 하락 효과를 적용한 100MW급의 VLS-PV 시스템 개발시에는 최종 305.4원/kWh이 될 것으로 전망되었다. 향후 기술혁신에 따른 모듈의 효율향상과 시스템 수명의 증가는 경제성을 더욱 향상시킬 것이며, 환경적인 이점 및 정책적인 효과까지 고려할 경우 향후 20년 이내에 기존의 발전원과 비교하여 충분한 경쟁력을 확보할 수 있을 것으로 예상된다.

  • PDF

A Study of The Extraction of Road Horizontal Alignment Design Elements in Urban Areas using the Digital Map (수치지도의 도로 중심선을 이용한 토로의 평면선형 설계요소 자동추출에 관한 연구)

  • 김민석;유기윤;김용일;곽태석
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.551-557
    • /
    • 2004
  • 미래의 텔레매틱스(telematics)환경에서 차량항법과 관련된 주요 핵심 기술은 동적 경로 안내 이외에 차량 자체의 지능화를 통해 운전자에게 주행 중인 도로에서 급경사, 급커브 구간에 대한 정보를 사전에 경고함으로써 사고를 방지하는 운전자 보조 및 경고 시스템(driver assistance and warning system) 구현으로 전망되고 있다. 이와 같은 기술이 구현되기 위해서는 현재 차량항법용 수치도로지도에서 도로의 단순 위치정보만으로는 불가능하며 도로의 곡선구간에서 평면 곡선반경과 같은 도로의 선형설계요소에 대한 정보가 필수적이다. 따라서 본 연구에서는 현재 전국적으로 구축되어있는 1/1000 수치지도의 도로중심선을 이용하여 실제 도로의 평면 선형설계요소를 자동으로 추출하기 위한 알고리즘을 개발하였고 이를 GUI 환경의 프로그램으로 구현함으로써 기존 도로의 정확한 평면 선형정보를 경제적이면서 효율적으로 획득할 수 있게 되었다.

  • PDF

Determination of Instream Flow Requirement for Small Mountainous Watershed Using SWAT (SWAT을 이용한 산지 소유역의 하천유지유량 산정방안)

  • Lee, Kil-Seong;Chung, Eun-Sung;Shin, Mun-Joo;Kim, Young-Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.814-818
    • /
    • 2006
  • 본 연구에서는 안양천 중상류 유역에 대해 SWAT 모형을 이용하여 현재(2000년)의 토지이용 및 지하수 취수량(2000년)을 토대로 유황곡선을 도출하고 개발이전의 토지이용(1975년)과 지하수 취수가 전혀 없는 이상적인 상태에서 유황곡선을 도출하여 비교분석하였다. 또한 기존의 갈수량과 항목별 필요유량을 비교하여 큰 값으로 하천유지유량을 설정한 것과 본 연구에서 수행한 유황들을 비교하였다. 그 결과 오전, 삼성, 삼막, 수암천의 경우 현재의 상태와 이상적인 상태의 갈수량이 전혀 변화하지 않음을 보였으며 삼성, 삼막천은 두 경우 모두 갈수량이 0임을 확인할 수 있었다. 이는 대상유역의 유역면적이 작은 지방2급 하천일 뿐만 아니라 경사가 급한 산간지역이 대부분을 이루어서 개발 전에도 기저유출이 많지 않았기 때문이다. 또한 하천유지유량을 항목별 필요유량으로 산정한 경우는 모든 유역에서 이상적인 상황의 저수량보다 큰 값을 보였다. 따라서 지방2급 하천과 같이 유역면적이 작거나 산지하천의 경우에도 일률적으로 갈수량이나 항목별 필요유량을 비교하여 큰 값으로 하천유지유량을 설정하기보다는 수문모의모형을 이용하여 대상유역에 대해 자연적인 상황에서의 갈수량 또는 저수량 등 다른 적절한 방안을 사용하는 것이 바람직하다.

  • PDF

Influence of Initial Clamping Force of Tension Clamp on Performance of Elastic Rail Fastening System (텐션클램프의 초기 체결력이 탄성레일체결장치의 성능에 미치는 영향)

  • Lee, Dong Wook;Choi, Jung Youl;Baik, Chan Ho;Park, Yong Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1243-1251
    • /
    • 2013
  • The purpose of this study is to investigate the influence of initial clamping force of tension clamp on the performance of an elastic rail fastening system used in sharp curve track. In this study, the initial clamping force and the increasing lateral wheel loads were conducted in the analytical and experimental study, i.e., finite element analysis, laboratory and field test. Using the analytical and experimental results, the performance of the tension clamp was investigated. It was found that the stress of tension clamp depends on the initial clamping force. Therefore the initial clamping force appeared to directly affect the compression stress of the tension clamp. It was found that the compression stress of tension clamp was transferred to the tensile stress by applied the lateral wheel load in service sharp curve track. Further, it was concluded that the initial clamping force was applied on the strengthening force for the tension clamp and then the appropriate initial clamping force was important to ensure a stable performance and long term endurance of tension clamp.