• Title/Summary/Keyword: 균열간격

Search Result 187, Processing Time 0.028 seconds

Crack Spacing in RC Tension Members Considering Cover Thickness and Concrete Compressive Strength (피복두께와 콘크리트 강도를 고려한 철근콘크리트 인장부재의 균열간격)

  • Kim, Woo;Lee, Ki-Yeol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.193-202
    • /
    • 2018
  • This paper proposed a crack spacing calculation formulation which is an important parameter for calculating the crack width, that is the main factor for verification of serviceability limit states and durability performance evaluation of reinforced concrete members. The basic equation of average crack spacing is derived by considering the bond characteristics which is the governing equation for the analysis of cracking behavior in reinforced concrete members. In order to consider the effect of the cover thickness and concrete compressive strength, the crack spacing measured in 124 direct tensile tests performed by several researchers was analyzed and each coefficient was proposed. And, correlation analysis was performed from 80 specimen data where the maximum and average crack spacing were simultaneously measured, and a correlation coefficient that can easily predict the maximum crack spacing from the average crack spacing was proposed. The results of the proposed average crack spacing equation and maximum crack spacing correlation were compared with those current design code specification. The comparisons of proposed equations and the Korean design codes show that the proposed formulation for the average crack spacing and the maximum crack spacing improves the accuracy and reliability of prediction compared to the corresponding provisions of the Korean Concrete Structural Design Code and Korean Highway Bridge Design Code (Limit States Design).

Indirect Crack Controling Method Affected by Variation of Material Characteristics in Reinforced Concrete Flexural Members (재료 특성 변화에 따른 철근콘크리트 휨부재의 간접균열제어 방법 연구)

  • Choi, Seung-Won;Kim, Woo
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.1
    • /
    • pp.87-98
    • /
    • 2011
  • Crack formations are inevitable in reinforced concrete structures. To estimate crack widths, empirical formulae are used widely and indirect crack controling methods of limiting bar spacing and bar diameter are also used due to their simplicity. In EC2, the characteristic crack width is calculated by multiplying maximum crack spacing and average strain. In this study, limit values of maximum bar spacing and bar diameter are examined as the material characteristics are varied. Two models of tension stiffening effect and maximum crack spacing and their effects are evaluated. The obtained results are compared with the values obtained using KCI method. The results showed that a significant difference is found when two tension stiffening effect are employed, and an under-estimation is found when 2nd order tension stiffening effect and maximum crack spacing limit from Part II were implemented. Therefore, a rational indirect crack control method attained using the tension stiffening effect of 2nd order form is needed. Also, a consistency in serviceabiliy analysis in flexural members needs to be secured. In order to achieve these goals, two crack controling models are suggested.

Determination of Crack Width and Crack Spacing in Reinforced Concrete Flexural Members (철근(鐵筋)콘크리트 휨부재의 균열폭 및 균열간격의 결정)

  • Kang, Young Jin;Oh, Byung Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.4
    • /
    • pp.103-111
    • /
    • 1985
  • Presented is a study on the determination of crack width and crack spacing in the reinforced concrete flexural members. The derivation of crack width and crack spacing is based on the recently developed cracking theory. The new prediction formulas for the crack widths and crack spacings are proposed. An experiment for the reinforced concrete beams was conducted to compare with the proposed formulas. The comparisons of the present prediction formulas with our tests and other test data show good agreement. The present crack width formula has been also compared with the well-known ACI formula originally proposed by Gergely & Lutz. It was found that the present crack width formula shows better correlation with test data than that of Gergely & Lutz.

  • PDF

Cracking Behavior of RC Tension Members Reinforced with Amorphous Steel Fibers (비정질 강섬유로 보강된 철근콘크리트 인장부재의 균열거동)

  • Park, Kyoung-Woo;Lee, Jun-Seok;Kim, Woo;Kim, Dae-Joong;Lee, Gi-Yeol
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.4
    • /
    • pp.475-482
    • /
    • 2014
  • This paper presents the experimental results concentrically reinforced concrete tension members and compares cracking behavior of amorphous steel fiber and normal steel fiber reinforced concrete members. Two kind of steel fibers were included as a major experimental parameter together with the six cover thickness to bar diameter ratio ($c/d_b$). The presence of amorphous steel fibers effectively controlled the splitting cracks initation and propagation. In the amorphous steel fiber reinforced specimens, no splitting cracks were observed that becomes higher with cover thickness to bar diameter ratio is 2.0. Crack spacing of the each specimens reinforced with amorphous steel fibers and normal steel fibers becomes larger with the increase in cover thickness, and also measured maximum and average crack spacing are significantly smaller than current design code provision. Based on the measured crack spacings, a relationships for predicting the crack spacing is proposed using the measured average crack spacing in amorphous steel fiber reinforced concrete tension members.

Crack Control in Reinforced Concrete Flexural Members (철근콘크리트 휨부재의 균열 제어에 관한 연구)

  • Choi, Seung-Won;Kim, Woo
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.4
    • /
    • pp.471-478
    • /
    • 2011
  • For a practical simplicity in designing of reinforced concrete structures, the indirect crack controlling method of limiting bar spacing is adopted in KCI structural design provisions. In addition, a direct method for evaluating crack width is also provided in the appendix of the code. But there may be some mismatched results between these two crack controlling methods. In this study, limit values of maximum bar spacing calculated from KCI provisions, KCI appendix, and Frosch's equation are examined as concrete strength, cross-section height, and concrete cover are varied, and the differences are analyzed. From the results, it becomes clear that the differences between maximum bar spacing calculated from KCI code text provisions and those from KCI code appendix provisions are too significant to be neglected. Therefore, rational crack models are suggested in order to get rid of the discrepancy between the direct and indirect control methods.

Investigation on Effect of Distance Between Two Collinear Circumferential Surface Cracks on Primary Water Stress Corrosion Crack Growth in Alloy 600TT Steam Generator Tubes (Alloy 600TT 증기발생기 전열관내 일렬 원주방향 표면 일차수응력 부식균열 성장에 미치는 균열 간격의 영향 고찰)

  • Heo, Eun-Ju;Kim, Jong-Sung;Jeon, Jun-Young;Kim, Yun-Jae
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.39 no.3
    • /
    • pp.269-273
    • /
    • 2015
  • The study investigated the effect of the distance between two collinear circumferential surface cracks on the primary stress corrosion crack (PWSCC) growth in alloy 600TT steam generator tubes using a finite element damage analysis based on the PWSCC initiation model and macroscopic phenomenological damage mechanics approach. The damage analysis method was verified by comparing the results to the previous study results. The verified method was applied to collinear circumferential surface PWSCCs. As a result, it was found that the collinear cracks showed earlier coalescence and penetration times than the a single crack, and the times increased with the distance. In addition, it is expected that penetration may occur before coalescence of two cracks if they are more than a specific distance apart.

Crack Detection of Carbon Fiber Reinforced Composites by Electric Potential Method with Bridge Circuit Concept (브리지 회로 개념이 적용된 전기 전위법을 이용한 탄소섬유복합재료의 균열검출)

  • Hwang, Hui-Yun
    • Composites Research
    • /
    • v.22 no.1
    • /
    • pp.9-14
    • /
    • 2009
  • This paper suggested the electric potential method with a bridge circuit concept for the detection of the location and crack growth of carbon fiber reinforced composites to reduce the measurement numbers. 2 pairs of electrodes were fabricated on the center cracked thin composite plates, and potential changes at one pair of adjacent electrodes were observed while external voltage input was applied to the other pair of adjacent electrodes. The effects of the size and interval of electrodes, location and propagating direction of center cracks were investigated by experiments and finite element analyses. Detectable crack size was influenced by the electrode interval rather than the electrode size, and crack detection was enhanced as the size and interval of electrodes were smaller. Besides, output potential changes were larger as the crack grew and was nearer the voltage input electrodes.

A Steel Spacing for Crack Control in RC Flexural Members with an Effective Modulus of Elastic (유효탄성계수를 반영한 철근콘크리트 휨부재의 균열제어를 위한 철근 간격)

  • Choi, Seung-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.5
    • /
    • pp.98-105
    • /
    • 2018
  • Cracks in RC members occurred as a result of material and structural factors. The crack width and a crack location are very difficult to examine. A direct crack control method and indirect crack control method to control a crack are presented in the KHBDC (LSD) and KSCDC (2012). In the KSCDC text, cracks are controlled by steel spacing indirectly under a service load. On the other hand, in the KSCDC appendix, cracks are controlled by a crack width directly under a sustained load. In particular, the loading state considered is different. On the other hand, cracks are controlled under a combination of service load and an effective elastic modulus is used in KHBDC. Therefore, in this study, an effective elastic modulus that can reflect the ratio of the sustained load and live load was applied, and a maximum steel spacing was calculated through a design crack width. A variable interpretation was carried out, and a rational crack control method was assessed. As a result, a steel spacing through the design crack width in the KSCDC was smaller than that from the design crack width in the KHBDC, which leads to a conservative design. In addition, the maximum steel spacing suggested in this study has a consistency eliminating the difference between direct crack control and indirect crack control.

Estimation of Crackwidth in Reinforce Concrete Members according to Design Standard (설계기준에 따른 철근콘크리트 부재의 균열폭 산정 연구)

  • Kim, Buyng-Hwan;Kim, Young-Jin;Choi, Seung-Won;Kim, Woo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.67-68
    • /
    • 2010
  • The bond stress and crack spacing are effected the calculated crackwidth. EC2 and MC90 suggest crackwidth function that maximum crack spacing and difference average strain. This study is predict crackwidth, according to each design standard than comprison and analyis test data. The result, each design standard ways are predict well to test data.

  • PDF

Crack Control of Wall type Structures by Shrinkage and Temperature Reinforcement (수축ㆍ온도 철근에 의한 벽체형 철근 콘크리트 구조물의 균열 제어)

  • 김영진;김상철
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.2
    • /
    • pp.52-60
    • /
    • 2002
  • 지하철 구조물과 같은 매스 콘크리트 구조물을 시공할 때 온도 측정을 하는 경우는 많으나 이는 내외부 온도차를 적정한 수준으로 유지하여 균열 발생을 제어하기 위한 수단일 뿐 균열폭을 일정한도 내로 제어할 수 있는 조치는 아니다. 매스 콘크리트 구조물에서 균열폭을 제한 값 이하로 하기 위해서는 적절한 양의 철근을 배치하여야 한다. 또한 시공 이음 등을 작은 간격으로 설치하는 것은 구속도를 완화시키고 온도응력이나 균열폭을 저감시켜 균열 제어상 매우 효과적인 수단이 될 수 있다. 그러나 시공 이음, 균열 유발 줄눈 등의 이음간 간격을 좁히면 내하력 수밀성, 내구성 등에 악영향을 미칠 가능성이 높고, 타설 회수가 많아져 동일한 공정이 반복 투입되므로 시공 속도의 저하 및 공사비 상승 등의 단점이 나타날 수 있다.(중략)