Analysis of Standard Cost and the Construction Period Applied TBM Excavation Method (TBM 굴착 공법 적용 구경별 표준 공사비 및 공사기간 분석 연구)

  • Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.319-327
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based the data analyzed TBM operating productivity, This research derived and presented excavation speed(m/day) by TBM diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m) and rock. Also, based on the excavation speed(m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. Based on hard rock 40.0%, soft rock 30.0%, usually rock 20%, weathered rock 10.0%, TBM boring velocity, m per cost, total construction period shall estimate the construction cost and the construction period by the effective use by diameter when future applying TBM method to the basic planning stages and in the preliminary design phase.

The Study on the Verification of the Blasting Effect of Blast Stemming Material and Plug Device (발파전색재료 및 플러그 장치의 발파효과 검증 연구)

  • Ko, Young-Hun
    • Tunnel and Underground Space
    • /
    • v.32 no.4
    • /
    • pp.272-284
    • /
    • 2022
  • This study conducted tunnel blasting to evaluate the blasting effect of a shear thickening fluid-based blasting stemming material and a sealed plug device under development. STF single stemming and STF stemming materials were combined with plugs to a tunnel blasting to which the SAV-Cut method was applied, and the advanced rate and fragmentation of tunnel blasting muck pile were compared when sand stemming was used. Tunnel advanced rate was evaluated using a 3D laser scanner. When the STF stemming material and STF stemming material with the plug were compared to the sand stemming material, it increased by 5.7 and 5.36%, respectively. As a result of evaluation of the fragmentation of tunnel blasting muck pile, it was the best when the STF stemming material was applied, and it decreased by about 61% compared to the case of sand stemming blasting. However, no significant improvement in blasting effect was observed with the application of plug devices.

The First Case Study of TBM Pre-Excavation Type 2-Arch Tunnel in Korea (국내 최초 TBM선굴진 2-Arch터널 설계사례 연구)

  • Hyung-Ryul Kim;Sang-Jun Jung;Jun-Ho Kang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.255-264
    • /
    • 2023
  • As the demand for urban underground space increases recently, urban tunnel planning is actively progressing. In the urban area, a underground station is planned in consideration of the living environment of residents, and 2-arch tunnel is applied for the stability of existing structures and reduction of environmental damage. However, since the depth of weak rock mass is deeply distributed in the urban area due to severe weathering, careful planning is required to secure tunnel stability. In addition, if TBM mechanical excavation is applied as the main tunnel excavation method considering the composite ground in urban area, the construction connectivity with the 2-arch tunnel of the NATM concept may be deteriorated. In this study, the design case of applying TBM pre-excavation type 2-arch tunnel for the first time in Korea was mainly described. The main considerations for the segment design of TBM pre-excavation type 2-arch tunnel were explained for side tunnels. Also, a stability analysis was conducted to verify the effectiveness and adequacy of the TBM pre-excavation type 2-arch tunnel.

A Study of Shield TBM Tunnelling-induced Volume Loss Estimation Considering Shield Machine Configurations and Driving Data (쉴드 TBM의 장비 형상 및 굴진 데이터를 고려한 체적손실 산정 연구)

  • Park, Hyunku;Chang, Seokbue;Lee, Seungbok
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.397-407
    • /
    • 2015
  • Estimation of shield TBM tunnelling-induced volume loss is of great importance for ground settlement control. This study proposed a simple method for evaluation of volume loss during TBM tunnlling, which is able to take into account of shield machine configurations and main driving data in calculation. The method was applied to analyze the tunnelling cases with earth pressure balanced and slurry pressure balanced shiled TBM, and mostly, reasonable agreements with monitoring results were found. Additional discussions were made for some disagreements.

A Study on the Operation Development Method through the Application Result TBM Tunneling in the Bard Rock (암반터널에서의 TBM 공법 적용 사례 분석을 통한 운영 개선 방안)

  • Song, Young-Sun;Choi, Jae-Jin;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.4
    • /
    • pp.1050-1058
    • /
    • 2008
  • The application of TBM tunneling has been progressively increased since the first entrance into Korea in 1985. In order to an apprehension and operation development of TBM method which has excellent boring in hard rock tunnel, this study has analyzed mutual relation of lose time and TBM boring from actual construction result TBM tunneling. This study compared an analyzed result with TBM tunnelling construction results of Korea, America, Japan, analyzed a primary factor of TBM boring effect and suggested operation development method from the analyzed results. accordingly this study can be used an index when similar construction apply TBM method to planning steps.

Rock TBM design model derived from the multi-variate regression analysis of TBM driving data (TBM 굴진자료의 다변량 회귀분석에 의한 암반대응형 TBM의 설계모델 도출)

  • Chang, Soo-Ho;Choi, Soon-Wook;Lee, Gyu-Phil;Bae, Gyu-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.6
    • /
    • pp.531-555
    • /
    • 2011
  • This study aims to derive the statistical models for the estimation of the required specifications of a rock TBM as well as for its cutterhead design suitable for a given rock mass condition. From a series of multi-variate regression analysis of 871 TBM driving data and 51 linear rock cutting test results, the optimum models were newly proposed to consider a variety of rock properties and mechanical cutting conditions. When the derived models were applied to two domestic shield tunnels, their predictions of cutter penetration depth, cutter acting forces and cutter spacing were very close to real TBM driving data, showing their high applicability.

The Method of Tunnel Blasting for the Vibration Control by Deck Charge and Multiple Cut (다단장약에 의한 V-cut 발파공법의 진동제어효과와 발파효율증대에 관한 연구)

  • 두준기;양형식;김형건;김용국
    • Explosives and Blasting
    • /
    • v.21 no.3
    • /
    • pp.1-10
    • /
    • 2003
  • 터널굴착발파공법의 하나인 V-cut발파공법은 터널굴착기술이 발전되는 과정에서 초기에 개발되어진 기술이나 작업의 간편성과 효율성으로 인하여 많은 터널굴착공사에서 이용되고 있는 발파공법이다. V-cut발파공법은 일자유면 상태에서 V형으로 심발공을 발파하고 심발공에 의해 형성된 자유면을 이용하여 확대공으로 굴착공간을 넓히는 발파 방법이며 심발발파의 굴진장에 의해 단일발파당 굴진장이 결정된다. V-cut발파법이 개발된 이래 V-cut발파의 굴진장을 증대시키기 위한 방법으로 심발발파공의 구속저항을 감소시키기 위해 보조심발공을 발파하여 형성된 자유면에 의해 심발공의 최소저항선거리를 줄여 발파하였으나 심발공의 구속저항이 감소되지 않아 발파효율이 증대되지 않았으며 발파진동 또한 가장 크게 발생하였다. 이와 같은 현상은 최소저항선거리의 감소효과에 대한 발파기술상의 이론에 문제가 있기 때문이다. 본 연구에서는 V-cut발파법의 심발공에 대한 구속저항감소효과가 발현될 수 있는 조건들을 검토하여 최소저항선거리의 감소효과가 발현될 수 있는 조건을 제시 하여 심발공의 발파효율을 증대시키고 발파진동이 적어지는 발파방법을 제안하려 한다.

Prediction of Preceding Displacement of a Soil-Tunnel by Displacement Monitoring using Horizontal Inclinometer (수평경사계를 이용한 토사터널의 선행변위 예측)

  • Kim, Chu-Hwa;Chae, Young-Su;Park, Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.18 no.5
    • /
    • pp.355-365
    • /
    • 2008
  • Displacement caused by tunneling is difficult to predict since it is affected by many factors such as ground condition, excavation method and supplementary method of reinforcement. In this study, horizontal inclinometer was employed to monitor ground settlements above a tunnel face before and after the excavation. Monitoring results were analyzed to predict the preceding displacement and settlement of the surface structures. The result of the analysis can be used to establish a proper counter measure which keeps the serviceability of the surface structures. Based on the analysis of the monitoring result, ground properties of the site were deduced and the influence of the tunnel excavation on the settlement of the foundation above the tunnel is analyzed.

Application of 3D Scanner for Tunnel Construction Using IT (터널 정보화 시공을 위한 3차원 스캐너의 활용 방안)

  • Son, Jae-Won;Min, Won;Ahn, Jae-Gyu;Heo, In-Wook
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.162-165
    • /
    • 2010
  • 우리나라 대형 건설시장의 하나인 터널 시공은 계획 대비 많은 물량과 자재의 소모로 인해 이들 정보의 지속적 관리를 통한 정확한 물량 및 자재 산출 정보 예측에 대한 관심이 꾸준히 요구되고 있는 실정이다. 대부분의 시공현장에서는 굴진의 정확도 검측을 위해 광파기를 사용하고 있다. 광파기는 공사 초기 시부터 유지된 원점으로부터의 정확한 좌표를 사용하고 있어 취득된 정보는 신뢰할 수 있으나, 몇 개의 기준점을 측량하여 굴진방향 및 공사의 진척도를 평가하는 방식이므로, 전체적인 면을 측정하지 못한다는 단점이 있다. 이에 반하여 3차원 스캐너는 제원에 따른 반경 내의 모든 점들을 계측하여 그 정보를 선이 아닌 면으로써 파악하지만 위치에 대한 정확도를 포함할 수 없다. 이러한 문제점을 보완하기 위하여, 광파기와 3차원 스캐너를 동시 활용하는 본 시스템은 현장에서 소모된 자원의 정확한 양을 체크하여 굴진정도를 파악하여 공사의 전반적인 진도를 관리할 수 있다. 또한 여굴의 발생 여부를 직접 확인하고 계획대비 소모된 물량정보를 통해 자재관리를 할 수 있게 된다. 마지막으로 추후 발생할 수 있는 하자에 대한 정확한 근거를 제시하여 균열 및 누수 등에 대한 정확한 원인 파악을 제공할 수 있다는 장점들을 제공한다.

  • PDF

A Study on Real-time Drilling Parameters Prediction Using Recurrent Neural Network (순환신경망을 이용한 실시간 시추매개변수 예측 연구)

  • Han, Dong-kwon;Seo, Hyeong-jun;Kim, Min-soo;Kwon, Sun-il
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.05a
    • /
    • pp.204-206
    • /
    • 2021
  • Real-time drilling parameters prediction is a considerably important study from the viewpoint of maximizing drilling efficiency. Among the methods of maximizing drilling, the method of improving the drilling speed is common, which is related to the rate of penetration, drillstring rotational speed, weight on bit, and drilling mud flow rate. This study proposes a method of predicting the drilling rate, one of the real-time drilling parameters, using a recurrent neural network-based deep learning model, and compares the existing physical-based drilling rate prediction model with a prediction model using deep learning.