• Title/Summary/Keyword: 국제건설계약

Search Result 49, Processing Time 0.029 seconds

A Study on the Dispute Boards in International Medium and Long-term Transaction - Focus on the Construction Contract - (중장기 국제거래에서 분쟁해결위원회에 관한 고찰 - 건설계약을 중심으로 -)

  • Yu, Byoung Yook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.57
    • /
    • pp.79-108
    • /
    • 2013
  • International transactions of plant and construction project need to time to time for completing the contract. During the performing the contract there may arise many claims and disputes it should be settled rapidly for processing schedule of works. However, arbitration and litigation for settlement of dispute are inappropriate in time and expense under the specifications of plant and construction project. Dispute boards are one of the successful resolution method of dispute prior to litigation or arbitration. If the dispute board was failed, of course, it may be allowed to continue into litigation or arbitration. As the creative methods of parties agreement, dispute boards may be expected to avoid claims and dispute in long and medium international contract. The purpose of this paper is to explore the specification and limitations of dispute boards that may clear disputes under long and medium contract of construction and procurement. It needs to be understand to determine whether is the useful methods for resolving dispute in the international project. This paper considers the specific natures of dispute board and its rules, procedures and problems including ICC and FIDIC for the contract of long and medium transaction.

  • PDF

Development of an evaluation index based on supply capacity for practical evaluation of drought resilience (현실적 가뭄대응력 평가를 위한 공급가능일수 기반의 평가지표 개발)

  • Kim, Gi Joo;Kim, Jiheun;Seo, Seung Beom;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.1
    • /
    • pp.11-21
    • /
    • 2023
  • This study suggests the drought resilience index as S-day as a means of preparing for the recent extreme drought, allowing for the actual operational identification of each drought countermeasure's priority as well as the vulnerability of water resource facilities to drought. Although each dam's drought measures are unique in this case, the representative examples include adjusting the water supply, linking the functioning of various facilities, and considering emergency capacity. Here, 15 multipurpose dams and water supply dams in Korea were inspected. Under the return period of 20-year drought, most of dams showed stable by adjusting the water supply overall. The measures, however, did not seem to be able to resist a multi-year drought lasting more than two years. Besides, Hoengseong and Anodong-Imha Dam only lasted a year under the 100-year drought return period with other measures. Without the deployment of drought mitigation strategies, it is expected that the Hoengseong Dam, Andong-Imha Dam, Gunwi Dam, Unmun Dam, Daecheong Dam, and Juam Dam would not be able to meet the all water demand for a year under the 20-year drought condition. The ideal capacity for each drought measure was then suggested. Additionally, by increasing or decreasing the current supply contract by 10% in order to account for demand changes resulting from socio-economic instability, the drought response capacity of all 15 dams was re-evaluated. By lowering the supply contract amount by 10%, it was possible to endure a severe drought.

The hierarchical structures of cause-and-effect relationships on the profit factors in overseas construction projects (해외건설공사 수익성 영향인자의 계층구조 및 사레적용에 관한 연구)

  • Han, Seung-Heon;Sun, Seung-Min;Park, Sang-Hyuk;Jung, Do-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.64-76
    • /
    • 2006
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposure through contract negotiation and its adjustment. This research discusses the trend of environment in international construction markets. Then, it identifies the key factors that affect the profitability significantly through the structured surveys from 59 actual overseas projects, and it analyzes the key factors by using statistical methods. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors using the result of statistical analysis, literature review and structuring their cause-and-effect relationships. The profitability casual hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative and quantitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

Deriving Key Risk Sub-Clauses which the Engineer of FIDIC Red Book Shall Agree or Determine according to Sub-Clause 3.7 -based on FIDIC Conditions of Contract for Construction, Second Edition 2017- (FIDIC Red Book의 Engineer가 합의 또는 결정해야할 핵심 리스크 세부조항 도출 -FIDIC Red Book 2017년 개정판 기준으로-)

  • Jei, Jae Yong;Hong, Seong Yeoll;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.239-247
    • /
    • 2023
  • The FIDIC Red Book is an international standard contract condition in which the Employer designs and the Contractor performs the construction. The Engineer of FIDIC Red Book shall agree or determine any matter or Claim in accordance with Sub-Clause 3.7 neutrally, not as an agent of the Employer. This study aimed to derive Key Risk Sub-Clauses out of 49 Sub-Clauses that the Engineer of FIDIC Red Book recently revised in 18 years shall agree or determine according to Sub-Clause 3.7 using the Delphi method. A panel of 35 experts with more than 10 years of experience and expertise in international construction contracts was formed, and through total three Delphi surveys, errors and biases were prevented in the judgment process to improve reliability. As for the research method, 49 Sub-Clauses that engineers shall agree on or determine according to Sub-Clause 3.7 of the FIDIC Red Book were investigated through the analysis of contract conditions. In order to evaluate the probability and impact of contractual risk for each 49 Sub-Clause, the Delphi survey conducted repeatedly a closed-type survey three times on a Likert 10-point scale. The results of the first Delphi survey were delivered during the second survey, and the results of the second survey were delivered to the third survey, which was re-evaluated in the direction of increasing the consensus of experts' opinions. The reliability of the Delphi 3rd survey results was verified with the COV value of the coefficient of variation. The PI Risk Matrix was applied to the average value of risk probability and impact of each of the 49 Sub-Clauses and finally, 9 Key Risk Sub-Clauses that fell within the extreme risk range were derived.

A study on taxation of foreign corporation's Permanent Establishment (고정사업장의 과세에 관한 연구: 플랜트 건설.판매기업의 사례를 중심으로)

  • Suh, Jung-Rog
    • Management & Information Systems Review
    • /
    • v.29 no.3
    • /
    • pp.71-96
    • /
    • 2010
  • This article firstly reviewed Permanent Established(PE) concept of OECD and UN model tax treaty and compared it with that of Korean Corporate Income Tax Law(CITL). The various factors regarding profit like ways of deciding the local source profit, scope and calculation method which will be imputed to PE were also reviewed. Based on above, standard PE judgement basis and calculation method of local source profit were also studied by using actual cases in foreign corporation which performs plant construction & sales in Korea. Accordingly to properly solve the conflict regarding international tax and to protect the tax authority against the foreign corporation in Korea, by standing on equality, I now propose followings for the better concept of PE in Korea. Firstly, the article that a building site or construction or installation project constitutes a PE only if it lasts more than 6 months should be modified to reflect OECD model convention's criteria of 12 months. Second, the scope of 'subordinate attorney' which is regarded as PE under CITL is now including 'holding-delivery attorney', 'order attorney', and 'assurance attorney' as well as 'contract attorney'. This is overly limit the activities of foreign corporation. It had better be loosened only to include 'contract attorney' as OECD provisions. Third, the CITL limits the cases of preparatory and/or auxiliary place which is not regarded as PE, thus limit the foreign corporations' business by expanding the concept of PE. This had better be eased. Fourth, in deciding the amount of local source profits, the CITL stipulates to split the profits by the relevant contribution of transaction parties through 'profit split method'. To solve the conflict, the ways of profit split must be better clarified through providing object and detailed standard and basis.

  • PDF

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Default Risk Mitigation Effect of Financial Structure and Characteristic in BOT Project Finance (BOT 프로젝트 파이낸스의 금융구조 및 특성의 채무불이행 위험완화 효과)

  • Jun, Jae-Bum;Lee, Jae-Sue;Lee, Sam-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.121-132
    • /
    • 2011
  • One of the advantages of BOT PF(Project Finance) is the government can be protected from risks involved in projects as the private finances, builds, and operates relevant projects. Moreover, the private may avoid outstanding responsibility in case of default thanks to BOT PF's unique financial structure and characteristics. However, despite increasing attention on risk mitigation effect of financial structure and characteristic of BOT PF to default risk with emerging controversies of capital crunch, introduction of IFRS, and contingent liabilities, valuation of default risk mitigation effect caused by financial structure and characteristics of BOT PF still seems sophisticated due to uncertain cash flows, complexly layered contracts, and their interaction. So, this paper is to show the theoretical frame to assess the default risk mitigation effect of financial structure and characteristic of BOT PF with option pricing and related financial economic theories and to provide some meaningful implications. Finally, this research shows that the financial structure and characteristics of BOT PF help mitigate the default risk and default risk mitigation effect increases as change of relevant variables on financial feasibility gets the BOT project less financially feasible.

Study on the Legal Issues of New Draft of Civil Aviation Law in China (중국 민용항공법 개정 최근 동향과 주요 법적쟁점)

  • Lee, Hwa
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.31 no.2
    • /
    • pp.177-214
    • /
    • 2016
  • During more than 20 years of practice, Civil Aviation Law has experienced three times of amendments since it was enacted in 1995. But these revisions are limited to the technical level. The problems and limitations have become increasingly prominent in its implementation. Firstly, the civil aviation law is the result of interests game among several departments and some legal issues was left behind and the regulation was very vague as a result. Secondly, the process of aviation legislation is the process that the country has undergone profound changes and social transformation. The 20 years is long enough for the society to undergo tremendous changes and 1995 version of civil aviation law does not keep pace of development of economy. There was a serious lag between reality and the law. In order to actively promote the development of the aviation industry and overcome implementation issues of the Civil Aviation Law, Civil Aviation Administration of China (CAAC) initiated modification procedure the law and published new draft of Civil Aviation Law in August 2016. The spirit of this modification is to learn and absorb new achievements of domestic and foreign legislation and the International Convention on civil aviation. Furthermore, the purpose of the revision is to provide favorable policy for the development of civil aviation industry and improve aviation safety and supervision, strengthen and protection of consumer rights and interests, to enhance the safety of civil aviation activities, and promote the development of general aviation. This revision concerned to the 78 articles which are revised or deleted and 24 articles added. The highlights of the draft include but not limited to the enhancement of security management, clarification of the main responsibility for production safety. And also it added the provisions related to the construction of effective tracking capability of public air transport enterprises and license system on the transport of dangerous goods. Compared with the existing civil aviation law, the draft has made a great improvements. But there are several deficiencies and limitations in the drafts. These problems need to be supplemented and perfected through further amendments in near future.

Appropriate Roles of Project Participants for Public Partnership Projects of Railways through the Organizational Behavior Theory (조직행동론을 통해서 본 민간철도 투자사업의 참여자간 갈등유형 및 역할정립 방안에 관한 사례연구)

  • Kim, Byungil;Yun, Sungmin;Han, Seung Heon;Kim, Hyung Hwe
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.839-847
    • /
    • 2008
  • No proper system exists for private investment projects, and efficient project management is not being achieved due to entanglements of management. Recognizing these circumstances, this paper has diagnosed the hard facts that project management organizations and systems are facing, and presented solutions to the factors that are obstructing the establishment of efficient project management system. This paper carried out focus group interviews on the experts who had participated in the Incheon International Airport Railway construction project, using the methodology of an exploratory case study. The results were systematically analyzed according to organizational behavior and causes corresponding to each of the problems were deduced. Private investment projects were divided into task environments and project organizations based on social science methodology and analyzed, and a final improvement plan for each participating organization was presented. An improvement plan was presented, and it was compared with the case study of Incheon bridge construction project, which is recognized as a model of successful project management, and its appropriateness evaluated.