• Title/Summary/Keyword: 구조 BIM

Search Result 246, Processing Time 0.026 seconds

Information Modeling of Railway Track using Information Iinkage of Railway Alignment and Alignment-based Objects (철도 선형중심의 객체 정보연계를 통한 철도 궤도부 정보모델 생성 방안)

  • Kwon, Tae Ho;Park, Sang I.;Shin, Min Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.507-514
    • /
    • 2017
  • As BIM has been widely used in the field of architecture, efforts to apply BIM to civil engineering structures are increasing rapidly. Since commercial BIM softwares are focused on building structure, it is difficult to apply to alignment-based civil infrastructures. In this study, we proposed a method to generate an information model that reflects cant by sharing information between alignment-centered modeling tools and BIM authoring tools to manage information of railway track. The railway track modeling process consists of classifying structures into continuous and non-continuous structures, creating continuous structures by alignment-centered modeling tools, and using the shared alignment information to generate information model of the non-continuous structures. Non-continuous structures were generated by an algorithm that calculates the position and rotation information of each structure based on discretized railway alignment and cant information transmitted to the BIM authoring tools. The availabilities of proposed method were studied by applying to the osong test-line. Using the test model, it was shown that the objects were identified, the properties were extracted, and the quantities of each structure were calculated.

Application of Data Dictionary to BIM for Small and Medium Project (중소규모 사업용 BIM을 위한 데이터 사전의 활용)

  • Lee, Hwan Woo;Lee, Kyung Sub;Kim, Kwang Yang
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.6
    • /
    • pp.431-438
    • /
    • 2013
  • The systemization of construction information is required over whole life cycle of facilities to improve productivity of construction industry. BIM(Building Information Modeling) is a technology to manage information based on 3D information model. It has been actively suggested as one of the alternatives. However, it may be currently concentrated on the large project while the small and medium project based on BIM are slightly treated in indifference. In the case of small and medium project, the loss of information has been occurred more seriously than large project. However, it is hard to introduce BIM to the small and medium companies due to the lack of investment resources. This study has been performed to set up information management system based on BIM considering characteristics of small and medium project without excessive investment. In this study, pseudo BIM is defined as BIM for small and medium project. The concept of pseudo BIM has been suggested. The PLIB of ISO and construction information classification system of MOLIT in Korea are used to construct data dictionary for pseudo BIM. A pilot test is performed to verify the effectiveness of pseudo BIM.

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

Development of Construction Cost Analysis Process Based on Structural Building Information Modeling (구조BIM기반 공사비 상세분석 프로세스 구축)

  • Lee, Seung-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

A Study on Development of Supporting System for Pre-design Phase based on BIM (BIM 기반 건축 기획단계 지원 시스템 개발에 관한 연구)

  • Park, Do-Young;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.85-88
    • /
    • 2010
  • 건축 기획단계는 프로젝트 전반에 걸친 주요한 의사결정이 일어나는 부분으로 그 영향력에 비해 프로젝트 정보를 수집, 처리, 저장하여 관련 참여자가 정보를 재사용하거나 참고하여 새로운 의사결정을 수행하는 것이 미흡하다. 따라서 본 논문에서는 BIM을 활용하여 기획단계에서 발생한 정보들이 설계, 시공, 유지관리 단계에 이르기까지 전생애주기에 걸쳐 정보를 통합 관리할 수 있도록 BIM기반의 건축 기획단계 지원 시스템을 개발하고자한다. 선행연구 분석과 이론적 고찰을 통해 건축 기획단계를 정의하고 건축기획 BIM의 개념과 특징을 도출하였다. 이를 토대로 기획단계 BIM프로세스를 정립하여 BIM을 기반으로 건축 기획단계를 지원하는 프로토타입 시스템 VA-Cityplanner를 개발하였다.

  • PDF

Application of BIM technologies for maintenance of subway structures (지하철 구조물 유지관리를 위한 BIM 기술 활용)

  • Shim, Chang-Su;Kim, Seong-Wook;Yun, Nu-Ri;Song, Hyun-Hye
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.91-94
    • /
    • 2011
  • 시설물 전생애주기에 걸쳐 정보가 공유되고 피드백 될 수 있는 BIM(Building Information Modeling) 기술의 등장은 유지보수 관리자들에게 가장 필요한 유지관리점검 도구의 의미를 지님과 동시에, 정보모델을 기반으로 주요 기술영역 및 사업주체간 원활한 의사소통이 가능해지도록 한다. 효율적인 지하철 터널의 유지관리를 위해서는 체계적으로 조직된 데이터가 필수적이다. 설계, 시공, 유지관리 단계별로 효과적인 협업을 위한 유기적인 단일 모델이 요구된다. BIM기반의 지하철 터널 구조물의 유지관리를 위해 건설정보분류체계 및 이를 보안한 유지관리점검 표준분류체계를 적용한 정보모델을 개발하였다.

  • PDF

A Study on the Implementation of Structural Module Library for the application of BIM Technology (BIM 기술 적용을 위한 토목구조물 모듈 라이브러리 구축에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok;Kim, Sung-Hoon;Kim, Yong-Han
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.107-110
    • /
    • 2011
  • 본 논문에서는 토목분야에 BIM 기술을 적용하기 위해 파라메트릭 모델링 디자인 기법을 기초로 한 토목 구조물 모듈 라이브러리를 구축하고자 하였다. 국제 표준설계방법론에 부합하는 개방형 BIM을 구현하기 위해 표준정보모델은 IFC로 연동하며, 형상 분류체계는 PLIB Part 42(ISO 13584-42)로 정보 분류체계는 Omniclass와 통합건설정보 분류체계를 따른다. 토목분야에서의 BIM 기술은 토목 구조물 표준 라이브러리를 통해 동시공학적 협업설계를 이룰 수 있을 것으로 판단된다.

  • PDF

A Research on Drawing Representation for BIM(Building Information Modeling) (BIM을 위한 도면 표현 사례에 관한 연구)

  • Chae, Kab-Su;Kim, Eon-Yong;Jun, Han-Jong;Lee, Myung-Sik;Kim, Khil-Chae;Choi, Jong-Chun;You, Seok-Joon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.470-475
    • /
    • 2008
  • Building Information Modeling(BIM) is rooted in the economic and functional advantages of maturing from paper-based 2D drawings. The paper-based design and construction drawings are typical production from BIM and using the drawing under BIM environment is needed because there is not an alternative media instead of paper-based drawings. However using the 2D drawing process based on 2D CAD for BIM environment directly has difficulties because there are significant differences in data structure between CAD and BIM. CAD is based on traditional drawings as a whole while BIM is focused on individual objects and providing various levels of information associated with the objects. It can be an obstacle to move from 2D CAD to BIM that we don't have a standard or guideline for BIM. Futhermore, the complexity of drawing in representation would be the obstacle too, so the solution is discussed in the research based on the case of Samoo Architects and Engineers.

  • PDF

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.