• Title/Summary/Keyword: 구조물 안전 관리

Search Result 781, Processing Time 0.029 seconds

Development of Structure Dynamic Characteristics Analysis System Prototype using Image Processing Technique (영상처리기법을 이용한 구조물 동특성 분석 시스템 프로토타입 개발)

  • Jo, Byung-Wan;Lee, Yun-Sung;Kim, Jung-Hoon;Kim, Do-Keun;Yoon, Kwang-Won
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.3
    • /
    • pp.11-21
    • /
    • 2016
  • Recently, structure safety management techniques using cutting-edge technology(Displacement senor, sensor of acceleration) has emerged as an important issue owing to the aging of infrastructure such as bridge and building. In general, the structural monitoring system for structure safety management is based on IT technology and it is expensive to install. In this paper developed an image-based structure dynamic characteristic analysis system prototype to assess the damage of structure in a more cost-effective way than traditional structure health monitoring system. The inspector can take a video of buildings or other structures with digital camera or any other devices that is passible to take video, and then using NCC calculation for image processing technique to get natural frequency. This system is analysis of damage of the structure using a compare between the frequency response ratio and functions when problems are occurs send alarm to administrator. This system is easier to install and remove than previous monitoring sensor in economical way.

A Study on Seismic Performance Evaluation of Road Tunnel according to Seismic Analysis Conditions (내진해석 조건에 따른 도로터널 내진성능평가에 관한 연구)

  • Choi, Byoung-Il;Kim, Chan-Hee;Noh, Eun-Cheol;Ha, Myung-Ho;Park, Si-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.5
    • /
    • pp.127-134
    • /
    • 2021
  • When constructing a tunnel on a stable ground, stress is changed in the ground during excavation stage and installation of ground support materials. In the standards for safety evaluation of structures in use, it is suggested to perform numerical analysis reflecting the excavation stage. But method of seismic performance evaluation was not presented. Therefore, in this study, numerical analysis was performed with different analysis methods, and the results were compared and analyzed. As a result of the numerical analysis, seismic wave applied in the horizontal direction were no difference depending on the analysis methods. However, there was a big difference in the result according to the evaluation methods of tunnel member forces. When reviewing with the strength design method, the structure performance could be not satisfied depending on the existence or nonexistence of reinforcing bars. Based on these research results, it is suggested that the interpretation method should be clearly presented and reflected in the relevant standards.

Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration (건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 -)

  • Shim, Yukyung;Jeong, Jaewook;Lee, Jaehyun;Jeong, Jaemin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.66-74
    • /
    • 2020
  • To prevent incident of demolition work the Building Management Act was implemented to manage demolition work. According to this law, buildings with the scale upper than 500㎡ of floor area are classified as permission to conduct the demolition work, however it may be hard to perform safety management at demolition work. In addition, the risk level of demolition work is varied with related to the structure type. So, the purpose of this study is to suggest the improvements of criteria on demolition work considering building structure types including small-scale structures such as masonry, wooden, and other structure. The research process was conducted by three steps. (I) Application of Building Management Act; (II) Analysis of demolition work by structure types; and (III) Subdivision of permission targets by building structure types. The result of this study, permission ratio was only 10% for total demolition work and 2.43% for masonry. Because the masonry, wooden, and other structure types are concentrated on a floor area of small-scale, the separate criteria of demolition work is need to prevent the accident and fatal incident. Through the results, the decision maker can be utilized (1) For the special building structure types, the criteria of enhanced safety management are applied by referring to the overseas law ; and (2) The demolition work can be considered by the criteria of separate permission in terms of structure types.

안전관리 - 설비공사 주요 안전대책

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.253
    • /
    • pp.57-61
    • /
    • 2011
  • 설비공사는 구조물의 진행에 따라 처음부터 준공시까지 진행되며, 작업공종별로 대부분 단시간에 이동작업을 하여야 하는 작업이 주종을 이루고 있고, 다양한 전기기계 기구를 사용하여 작업을 하기 때문에 이에 따른 추락, 협착 및 감전재해 등 안전관리에 각별히 유의해야 한다. 본지는 시공업무에 도움이 되고자 기계설비의 주요 안전관리에 대한 대책을 연재한다.

  • PDF

안전관리 - 설비공사 주요 안전대책(5)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.257
    • /
    • pp.69-71
    • /
    • 2011
  • 설비공사는 구조물의 진행에 따라 처음부터 준공시까지 진행되며, 작업공종별로 대부분 단시간에 이동작업을 하여야 하는 작업이 주종을 이루고 있고, 다양한 전기기계 기구를 사용하여 작업을 하기 때문에 이에 따른 추락, 협착 및 감전재해 등 안전관리에 각별히 유의해야 한다. 본지는 회원사의 시공업무에 도움이 되고자 기계설비공사의 주요 안전관리에 대한 대책을 연재한다.

  • PDF

안전관리 - 설비공사 주요 안전대책 (6)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.259
    • /
    • pp.66-73
    • /
    • 2012
  • 설비공사는 구조물의 진행에 따라 처음부터 준공시까지 진행되며, 작업공종별로 대부분 단시간에 이동작업을 하여야 하는 작업이 주종을 이루고 있고, 다양한 전기기계 기구를 사용하여 작업을 하기 때문에 이에 따른 추락, 협착 및 감전재해 등 안전관리에 각별히 유의해야 한다. 본지는 회원사의 시공업무에 도움이 되고자 기계설비공사의 주요 안전 관리에 대한 대책을 연재한다.

  • PDF

안전 관리 - 설비공사 주요 안전대책(4) - 중대재해사례 및 대책(2)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.256
    • /
    • pp.72-74
    • /
    • 2011
  • 설비공사는 구조물의 진행에 따라 처음부터 준공시까지 진행되며, 작업공종별로 대부분 단시간에 이동작업을 하여야 하는 작업이 주종을 이루고 있고, 다양한 전기기계 기구를 사용하여 작업을 하기 때문에 이에 따른 추락, 협착 및 감전재해 등 안전관리에 각별히 유의해야 한다. 본지는 회원사의 시공업무에 도움이 되고자 기계설비공사의 주요 안전관리에 대한 대책을 연재한다.

  • PDF

안전관리 - 설비공사 주요 안전대책 (2)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.254
    • /
    • pp.63-66
    • /
    • 2011
  • 설비공사는 구조물의 진행에 따라 처음부터 준공시까지 진행되며, 작업공정별로 대부분 단시간에 이동작업을 하여야 하는 작업이 주종을 이루고 있고, 다양한 전기기계 기구를 사용하여 작업을 하기 때문에 이에 따른 추락, 협착 및 감전재해 등 안전관리에 각별히 유의해야 한다. 본지는 회원사의 시공업무에 도움이 되고자 기계설비공사의 주요 안전 관리에 대한 대책을 연재한다.

  • PDF