• Title/Summary/Keyword: 구조물 공사

Search Result 756, Processing Time 0.028 seconds

Current Status and Analysis of Durability for Buildings Long Neglected after Construction Discontinuation in Jeju (제주지역 공사중단 건축물의 현황조사 및 내구성 분석)

  • Han, In-Deok;Kim, Doo-Seong;Jang, Myunghoun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.441-452
    • /
    • 2023
  • Buildings that have been long neglected can suffer severe durability reduction due to factors such as rebar rust and concrete quality deterioration resulting from exposure to outside air. Furthermore, the issues associated with these suspended buildings, including safety accidents, social crimes, and environmental pollution, are becoming increasingly serious. This study investigates the current status of these buildings in the Jeju area, identifies the problems, and examines the durability of the structure in a specific location to assess the possibility of future use. Aesthetic surveys(visual and slope inspections) as well as non-destructive tests(compressive strength tests, neutralization tests, and rebar detection tests) were conducted to assess durability. The analysis revealed that the structure maintained satisfactory durability and the building's condition was good in comparison to the years of neglect.

Numerical Analysis of Track Irregularity in Excavation Adjacent to Railway Trackbed (수치해석을 통한 철도노반 인접 굴착 시 궤도틀림 분석)

  • Seokjun Lee;Dongwook Oh;Seongmin Jang;Batchimeg, Banzragchgarav;Hyuksang, Jung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.12
    • /
    • pp.39-45
    • /
    • 2023
  • In this paper, a track irregularity according to adjacent deep excavation of railway was analyzed using three-dimensional numerical analysis. The construction for excavation adjacent to the railway track is likely to have a negative impact on train operations. Despite mandatory assessments of the stability and impact on adjacent structures during construction, reports continue to indicate ongoing settlement and track irregularity resulting from construction. Changes in the groundwater level and stress state of the ground due to excavation are pointed out as causes for settlement and track irregularity in structures adjacent to the excavation. In this study, therefore, numerical analysis was conducted taking into account factors that induce track irregularity during adjacent excavation work as variables. The KRL-2012 standard train load was applied to simulate operating trains. As a results, The position of the train load, the distance from the excavation point, had a significant impact on track irregularity, and there was a significant occurrence of track misalignment when the train load was applied. The impact of the groundwater level was not significant.

Research Of Construction Quality Execute Management A Plan Using TS (TS를 활용한 건설공사 품질시공 관리방안에 관한 연구)

  • 김감래;이재기;장우영
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.04a
    • /
    • pp.485-488
    • /
    • 2003
  • 본 연구는 건설공사의 경계점 및 구조물의 기준점을 TS를 활용하여 현장 측지좌표체제를 탈피지적좌표로 전환 관리하여 토지경계분쟁 문제의 사전제거 및 공사품질시공관리에 향상을 기하고자 연구하였다.

  • PDF

A Field Application of the Standardized Precess for Reinforcement-Related-Work (철근 기계화 가공 적용 사례)

  • 윤영호;양지수
    • Magazine of the Korea Concrete Institute
    • /
    • v.5 no.4
    • /
    • pp.66-76
    • /
    • 1993
  • 철근콘크리트 구조물의 공사중 뼈대공사라고 할 수 있는 철근공사에 있어서, 현행 철근의 절단 절곡 가공방법은 현장 인력 수작업에 의한 가공 즉 노동집약적 형태로 운영되어 왔으며, 특히 절단가공에 있어서는 철근의 강도저하가 우려되는 산소를 사용한 가열절단으로 행해지고 있어, 본고에서는 이와같은 현장여건을 개선하고, 궁극적으로 인력절감, 현장 생산성 및 품질 향상을 꾀하기 위하여 철근 가공(절단,절곡) 기계화 시스템을 적용한 시공사례를 중심으로 소개하기로 한다.

고파랑, 대수심 지역의 방파제(호안) 최신설계사례 (동해항 3단계 방파호안(2공구) 축조공사)

  • Lee, Ui-Gyu;An, Tae-Jun;Lee, Seon-Ryong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.05a
    • /
    • pp.199-202
    • /
    • 2018
  • 현재 대규모 항만국가공사 대부분은 대수심, 고파랑 지역에 위치하고 있어 대안설계 진행시는 해당 해역의 특성을 고려한 설계파 산정, 평면 및 단면계획, 구조물의 안정성 검토 등의 사항을 기존설계 대비 상향시켜 설계에 반영하고 있는 사례를 최근 발주된 동해항 3단계 방파호안 축조공사를 사례를 들어 최근 설계방향성을 검토함.

  • PDF