• Title/Summary/Keyword: 교량 보수보강

Search Result 86, Processing Time 0.022 seconds

Real-scale Accelerated Testing to Evaluate Long-term Performance for Bridge/Earthwork Transition Structure Reinforced by Geosynthetics and Cement Treated Materials (토목섬유와 시멘트처리채움재로 보강한 교량/토공 접속구조의 장기공용성 평가를 위한 실물가속시험)

  • Lee, Il-Wha;Choi, Won-Il;Cho, Kook-Hwan;Lee, Kang-Myung;Min, Kyung-Chan
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.251-259
    • /
    • 2014
  • The transition zone between an earthwork and a bridge effect to the vehicle's running stability because support stiffness of the roadbed is suddenly changed. The design criteria for the transition structure on ballast track were not particular in the past. However with the introduction of concrete track is introduced, it requires there is a higher performance level required because of maintenance and running stability. In this present paper, a transition structure reinforced with geosynthetics is suggested to improve the performance of existing bridge-earthwork transition structures. The suggested transition structure, in which there is reinforcing of the approach block using high-tension geosynthetics, has a structure similar to that of earth reinforced abutments. The utilized backfill materials are cement treated soil and gravel. These materials are used to reduce water intrusion into the approach block and to increase the recycling of surplus earth materials. An experiment was performed under the same conditions in order to allow a comparison of this new structure with the existing transition structure. Evaluation items are elastic displacement, cumulative settlement, and earth pressure. As for the results of the real-scale accelerated testing, the suggested transition structure has excellent performance for the reduction of earth pressure and settlement. Above all, it has high resistance the variation of the water content.

Introduction to Definition and Basic Role of Performance Measure in Asset Management for Bridge Management (자산관리기법의 교량시설물의 적용에 있어 성능평가지표의 정의 및 역할에 대한 기초연구)

  • Park, Cheol-Woo;Park, Kyung-Hoon;Hwang, Yoon-Koog;Lee, Sang-Yoon;Kong, Jung-Sik;Min, Dae-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.401-404
    • /
    • 2008
  • Bridges are exposed to very severe environment and experience, as service life increased, elevated traffic load and traffic flow, in addition to natural disasters. In comparing to other road structures, bridges may cause more significant damage, such as human-involved accidents, to the society in the event of collapse. A certain level of service shall be necessarily secured to assure the minimum safety of users. The cost for manage and preserve bridges will increase gradually and more restrictions will be loaded to efficiently distribute the limited resources, such as monetary budget and human resource etc. In order to enhance performance and serviceability of bridges with the limited resource, asset management technique has been applied into the bridge management system, which capitalizes the road infrastructures including bridges and assess them in accordance with the government finance report. In the application of asset management, there must be a tool for assess the performance of bridges and this study introduces the basic information on the definition and role of performance measures for asset management for bridges.

  • PDF

Development of Robotic Inspection System over Bridge Superstructure (교량 상판 하부 안전점검 로봇개발)

  • Nam Soon-Sung;Jang Jung-Whan;Yang Kyung-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.180-185
    • /
    • 2003
  • The increase of traffic over a bridge has been emerged as one of the most severe problems in view of bridge maintenance, since the load effect caused by the vehicle passage over the bridge has brought out a long-term damage to bridge structure, and it is nearly impossible to maintain operational serviceability of bridge to user's satisfactory level without any concern on bridge maintenance at the phase of completion. Moreover, bridge maintenance operation should be performed by regular inspection over the bridge to prevent structural malfunction or unexpected accidents front breaking out by monitoring on cracks or deformations during service. Therefore, technical breakthrough related to this uninterested field of bridge maintenance leading the public to the turning point of recognition is desperately needed. This study has the aim of development on automated inspection system to lower surface of bridge superstructures to replace the conventional system of bridge inspection with the naked eye, where the monitoring staff is directly on board to refractive or other type of maintenance .vehicles, with which it is expected that we can solve the problems essentially where the results of inspection are varied to change with subjective manlier from monitoring staff, increase stabilities in safety during the inspection, and make contribution to construct data base by providing objective and quantitative data and materials through image processing method over data captured by cameras. By this system it is also expected that objective estimation over the right time of maintenance and reinforcement work will lead enormous decrease in maintenance cost.

  • PDF

A Study on Life Cycle Cost According to Bridge Condition (교량 상태에 따른 생애주기비용 영향 분석)

  • Park, Jun-Yong;Lee, Keesei
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.802-809
    • /
    • 2021
  • To cope with the increasing maintenance costs due to aging, the maintenance cost was evaluated from the perspective of asset management. The maintenance cost can be predicted based on the condition of the bridge, and the life cycle cost is used as an index. In general, the condition of a bridge has a wide distribution characteristic depending on the deterioration, load, and material characteristics. In this paper, to evaluate the effect of the bridge conditions on the life cycle cost, condition prediction models were constructed considering the service life, deterioration rate, and inspection error, which are the main variables of the bridge condition and life cycle cost calculation. In addition, condition prediction models were constructed based on the distribution of the health index to estimate the upper and lower bounds of the life cycle costs that can occur in individual bridges. Life cycle cost analysis showed that the life cycle cost differed significantly according to the condition of the bridge. Accordingly, research will be needed to increase the reliability of predicting the life cycle cost of individual bridges.

The Examination of Load Carrying Capacity Based on Existing Data for Improved Safety Assessment Method of Expressway Bridges (고속도로 교량의 개선된 안전성 평가방안을 위한 실측자료에 기초한 공용 내하력 검토)

  • Lee, Jong Ho;Han, Sung Ho;Sin, Jae Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6A
    • /
    • pp.597-605
    • /
    • 2009
  • The safety of expressway bridges was estimated by checking the external condition rank based on the nondestructive inspection and material test and by measuring load carrying capacity based on the result of load test. Although the load carrying capacity of the bridges was clearly low compared to the design standard, it was examined that many of the bridges have good external condition rank relatively. Also, it can be assured that load carrying capacity shows a considerable difference according to various condition even though the bridges have similar construction year and a structural type. Therefore, this study showed various problems of the current safety measurement of expressway bridges by considering the status of the expressway bridges, external condition rank, and method of safety diagnosis and repair, rehabilitation for maintenance. Based on the existing data of over 400 expressway bridges, the load carrying capacity was analyzed quantitatively considering bridge type, serviced life, design live load, external condition rank and traffic count as variables. The result of this study will be expected to provide the basic information for a reasonable safety assessment of expressway bridge.

Behavior on Vertical Stiffener Length of Steel Box Girder Support Diaphragm (강상자형 다이아프램의 수직보강재 길이에 따른 거동)

  • Kim, Jong Ryeol;Kim, Woo Jun;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.5 s.66
    • /
    • pp.489-497
    • /
    • 2003
  • Bridge has to be long-spanned and of simple structure, considering the social environment. As a result of this trend in bridge construction, it is important for the sake of economical efficiency to improve the structural system and increase the life cycle of a bridge. To attain these goals in constructing a steel bridge, the detail analyses based on real structure must be performed. In the steel structure bridge, the parts that are a main focus of interest are the diaphragm and the vertical bracing of the steel box girder support. This study observed the behavior of the diaphragms on the bearings of a closed section steel box girder bridge support, as dead load was increased. Stress variation of the support diaphragms in a steel box girder was considered, and both experimental test and structural analyses were performed to verify the behavior of a composite steel box girder bridge under repair or maintenance.

Bridge Life Cycle Cost Analysis of Preventive Maintenance (예방적 유지관리를 통한 교량의 생애주기비용 절감 효과 분석)

  • Jeong, Yo-Seok;Kim, Woo-Seok;Lee, Il-Keun;Lee, Jae-Ha
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.6
    • /
    • pp.1-9
    • /
    • 2016
  • The paper aims at evaluating effects of preventive maintenance on life cycle cost(LCC) reduction of bridges. The preventive maintenance activities capable to delay bridge deteriorations can reduce overall maintenance costs and extend service life of a bridge by regularly providing maintenance activities and avoiding larger maintenance(repairs or rehabilitations) costs. Couple of prediction models were proposed in order to calculate LCC of a typical bridge: a health score model and repair rehabilitation cost model. In addition, the maintenance activities such as wash and painting were also suggested in order to consider effects of preventive maintenance in the analysis based on literature reviews. According to analysis results, new maintenance strategy(reactive maintenance + preventive maintenance) can save \0.5 billion per bridge for future life-cycle costs over 100 year analysis or \184 billion for entire HBMS(Highway Bridge Management System) inventory over 20 years. Small investments for preventive maintenance in improved bridge management can have a very significant return when considering the large bridge inventory.

Analysis of Track-Bridge Interaction and Retrofit Design for Installation of CWR on Non-ballasted Railway Bridge (무도상 철도교 레일 장대화를 위한 궤도-교량 상호작용 해석 및 개량방안 분석)

  • Yoon, Jae Chan;Lee, Chang Jin;Jang, Seung Yup;Choi, Sang Hyun;Park, Sung Hyun;Jung, Hyuk Sang
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.383-392
    • /
    • 2018
  • This study investigated the change of additional axial stress of rail and reaction force at bridge bearings due to the track-bridge interaction when laying CWR on non-ballasted railway bridges including truss bridges with relatively long span. According to the results of the present study, additional axial stresses of rail and reaction forces at bridge bearings showed a large increase when CWR is installed on the non-ballasted railway bridge. The additional axial stress of rail can be acceptable if sufficient lateral resistance can be obtained. However, if the reaction force increases, there is a risk of damage of the bearing or pier, and therefore, it is necessary to take measures to mitigate the reaction force. It is found that additional axial stress of rail decreases when considering the frictional resistance of the bridge movable support, but its effect on the bearing reaction force is very small. On the other hand, when the longitudinal track restraint decreases, both additional axial stress of rail and bearing reaction force are reduced to a large extent. Also, when the ZLR fastening devices are applied to the region where the additional axial stress of rail is highest, bearing reaction force as well as additional axial stress of rail greatly decreased. Therefore, the application of ZLR fastening devices with the reduction of the longitudinal track restraints is very effective for installing CWR on non-ballasted railway bridges.

An Experimental Study About a Net-Type External Prestress Strengthening Method for Slab Bridges (네트형 외부 긴장재에 의한 슬래브교 보강 실험)

  • Han, Man Yop;Kang, Tae Heon;Choi, Sok Hwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.5
    • /
    • pp.136-149
    • /
    • 2011
  • Large portion of the domestic bridges are slab bridges reflecting the geographical characteristic of the country, where exists lots of inclines and small winding brooks. Many of the slab bridges are damaged and superannuated as they become obsolete. Deterioration is accelerated when the traffic density becomes large and heavy vehicles pass frequently. A strengthening method for deteriorated slab bridges was studied in this work. The examined net-type strengthening method uses both longitudinal and transverse prestressing for strengthening. In this way, the deflection at the center of the slab can be better controlled, and consequently, the slab is more efficiently strengthened. Three slab specimens were fabricated for the experimental test and subjected to three different loading conditions, and the load bearing capacities and deflections of slabs were examined. Flexural stiffness of slabs increased by 30.7~107.3%, and deflection of slabs decreased by 27.6~52.2% after net-type strengthening. The net-type prestressing is efficient to the strengthening for the center of a slab, and its efficiency is also valid under eccentric loadings. Since extra prestress forces can be added in the future, if necessary, the net-type strengthening system is advantagous for the maintenance and repair of slab bridges.

Experimental Study on Pull Out Characteristics of Adhesive Anchor (부착식 앵커의 인발 특성에 관한 실험적 연구)

  • Yoo, Sung Won;Jung, Sang-Hwa;Kwak, Ki-Suk;Lee, Ju-Hyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3A
    • /
    • pp.555-563
    • /
    • 2006
  • Recently, many bridges become not only functionally obsolete of bridge deck due to inadequate width but also structurally deficient of substructure due to erosion. In these cases, widening is almost always more economical than complete replacement, and therefore there is a need to make available the results of research and field experience pertaining to the widening of bridge substructure. But, an experimental study for the guarantee of unification between existing and new substructure with adhesive anchor is so insufficient that the development of adhesive anchor system for the unification should be settled promptly. The purpose of the present study is to explore pull out and shear characteristics of adhesive anchor system. For this purpose, several series of concrete specimens have been tested. Major test variables were the bonded length, anchor diameter and anchor slope. The pull out strength, bond stress and shear strength of adhesive faces were measured for the specimens. The present study indicates that the pull out strength increased with more bonded length and more anchor diameter, and that the bond stress decreased with more bonded length and more anchor diameter. The pull out strength and the bond stress increases with more anchor slope and it is considered that the slope of $5^{\circ}$ was more efficient. From the shear tests, it is supposed that anchor diameters more than D19 was proper to the adhesive anchor. Finally, it is expected that both experimental data in these tests and further study including mock-up tests will contribute to the establishment of the unification between existing and new substructure with adhesive anchor.