Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF

Improvement of Construction Process management dividing the work area reasonably in Building Construction (작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선)

  • Yoon You-Sang;Joung Young-Kwon;Suh Sang-Wook;Shin Dong-Woo;Kim Chang-Duk;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.59-65
    • /
    • 2003
  • The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.

A Comparative Study on Korean Compulsory Multiple Prime Contract System (건설산업 제도개선을 위한 분할·분리 발주 제도의 선진화 방안 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.184-193
    • /
    • 2013
  • Procurement System for Korean construction industry has mainly been controlled by the complicated regulatory system which has been recognized as unflexible and remotely separated from the global standard. This has been identified by many Korean construction experts as one of the main reasons that hamper the Korean construction industry becoming the global leader. One commonly discussed regulatory system is the compulsory multiple contracting system that has been enforced for a long time. According to the Korean governmental contracting law 68-3, all construction projects cannot be divided into separate contracting packages with a few exceptions. Exceptions stated in the law include construction activities related electrical, Information communication, fire-fighting, and cultural assets which all are governed by the separate laws/acts controlled by the different governmental bodies. This research is to closely investigate multiple prime contracting system that has been compulsory in Korean construction industry and to provide policy recommendations to these restrictions. Although, there has been a long history of this compulsory contracting system, this study attempted to provide objective analysis on current status of the system as well as global standard on the issue. This study suggests main considerations when considering different contracting system such as rights of owners, flexibilities of regulatory systems, and efficiencies of conducting a construction project. It is envisioned that recommendations from this study, if accepted by the regulatory bodies, would improve the Korean construction contraction system by making it more compatible with global standard. Moreover, these would help making the Korean industry more effective in terms of regulatory restrictions.

A Study on the Utilization Improvements by Function Analysis of the Construction CALS (건설 CALS 시스템의 기능분석을 통한 활용성 개선방안 연구)

  • Kang, LeenSeok;Han, DongHo;Park, NamJin;Moon, HyounSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.441-450
    • /
    • 2011
  • Recent construction projects consist of large and complex facilities, which project management information system (PMIS) is used for managing construction cost and schedule. The ministry of land, transport and maritime affairs (MLTM) is using a continuous acquisition and life-cycle support (CALS) system for managing the public construction projects. This study attempts to survey some problems of the CALS system in practical application, and then suggests the new functions to improve practical application of the CALS system. All functions in each menu were analyzed in the practical application aspect. All projects ordered from MLTM should use the CALS system as a PMIS, but the practical application is limited in partial functions and special working group. And the utilization of system is focused on simple tasks and report process. One of main reason is that the system is using numerical data rather than graphical data. This study suggests new functions and a visualized management method that can improve the practical applicability using a 4D object in each current functions.